Content
October 2008, Volume 55, Issue 7
- 704-721 Competitive location and capacity decisions for firms serving time‐sensitive customers
by Anthony M. Kwasnica & Euthemia Stavrulaki
September 2008, Volume 55, Issue 6
- 493-515 Network design for time‐constrained delivery
by Hui Chen & Ann Melissa Campbell & Barrett W. Thomas - 516-540 Collaborative procurement among competing buyers
by Pinar Keskinocak & Seçil Savaşaneril - 541-550 Nash bargaining over allocations in inventory pooling contracts
by Eran Hanany & Yigal Gerchak - 551-562 Optimum step‐stress accelerated life test plans for log‐location‐scale distributions
by Haiming Ma & William Q. Meeker - 563-580 A refined deterministic linear program for the network revenue management problem with customer choice behavior
by Sumit Kunnumkal & Huseyin Topaloglu - 581-591 Optimal resource allocation and redistribution strategy in military conflicts with Lanchester square law attrition
by P.S. Sheeba & Debasish Ghose
August 2008, Volume 55, Issue 5
- 377-389 Scheduling parallel dedicated machines with the speeding‐up resource
by Hans Kellerer & Vitaly A. Strusevich - 390-405 Delivery‐date and capacity management in a decentralized internal market
by Murat Erkoc & S. David Wu & Haresh Gurnani - 406-411 The effects of information on a queue with balking and phase‐type service times
by Pengfei Guo & Paul Zipkin - 412-418 A note on optimal pricing for finite capacity queueing systems with multiple customer classes
by Serhan Ziya & Hayriye Ayhan & Robert D. Foley - 419-431 Revenue sharing contracts in a supply chain with uncontractible actions
by Albert Y. Ha & Shilu Tong - 432-443 Sojourn times in G/M/1 fork‐join networks
by Sung‐Seok Ko & Richard F. Serfozo - 444-458 Scheduling and due‐date quotation in a make‐to‐order supply chain
by Philip Kaminsky & Onur Kaya - 459-477 Analysis of supply contracts with commitments and flexibility
by Yehuda Bassok & Ravi Anupindi - 478-491 Factors that affect the optimal amount of central control in complex systems
by Daniel Solow & Joseph Szmerekovsky
June 2008, Volume 55, Issue 4
- 283-294 What you should know about location modeling
by Mark S. Daskin - 295-312 Capacitated warehouse location model with risk pooling
by Leyla Ozsen & Collette R. Coullard & Mark S. Daskin - 313-327 On the application and extension of system signatures in engineering reliability
by Jorge Navarro & Francisco J. Samaniego & N. Balakrishnan & Debasis Bhattacharya - 328-338 Scheduling parallel machines with inclusive processing set restrictions
by Jinwen Ou & Joseph Y.‐T. Leung & Chung‐Lun Li - 339-349 Warranty claims modeling
by Vidyadhar Kulkarni & Sidney I. Resnick - 350-362 Analysis and optimal design of discrete order picking technologies along a line
by Donald D. Eisenstein - 363-376 The building evacuation problem with shared information
by Lichun Chen & Elise Miller‐Hooks
April 2008, Volume 55, Issue 3
- 193-193 In memory of Richard E. Rosenthal: 1950–2008
by Barry L. Nelson - 194-199 An FPTAS for a supply scheduling problem with non‐monotone cost functions
by Chi To Ng & Mikhail Yakovlevich Kovalyov & Tai Chiu Edwin Cheng - 200-217 Supply contracts in manufacturer‐retailer interactions with manufacturer‐quality and retailer effort‐induced demand
by Haresh Gurnani & Murat Erkoc - 218-233 Risk‐sensitive sizing of responsive facilities
by Sergio Chayet & Wallace J. Hopp - 234-251 Dynamic server assignment policies for assembly‐type queues with flexible servers
by Yi‐Chun Tsai & Nilay Tanık Argon - 252-264 The logistic–exponential survival distribution
by Yingjie Lan & Lawrence M. Leemis - 265-276 Estimating failure time distribution and its parameters based on intermediate data from a Wiener degradation model
by Jen Tang & Tsui‐Shu Su - 277-282 Technical note: Reexamination of all‐or‐none inspection policies in a supply chain with endogenous product quality
by Hong Wan & Xiaowei Xu
March 2008, Volume 55, Issue 2
- 105-115 Bayesian enhanced decision making for deteriorating repairable systems with preventive maintenance
by Yeu‐Shiang Huang & Chi‐Chang Hung & Chih‐Chiang Fang - 116-129 Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information
by Thomas Sloan - 130-141 Optimal capacity in a coordinated supply chain
by Xiuli Chao & Sridhar Seshadri & Michael Pinedo - 142-155 Dynamic policies for uncertain time‐critical tasking problems
by Kevin D. Glazebrook & Emma L. Punton - 156-171 Optimal empty vehicle redistribution for hub‐and‐spoke transportation systems
by Dong‐Ping Song & Jonathan Carter - 172-191 New inequalities for finite and infinite group problems from approximate lifting
by Lisa A. Miller & Yanjun Li & Jean‐Philippe P. Richard
February 2008, Volume 55, Issue 1
- 1-15 On the hierarchy of γ‐valid cuts in global optimization
by Marcus Porembski - 16-26 Dynamic routing of prioritized warranty repairs
by Feng Chen & Vidyadhar G. Kulkarni - 27-41 Models of sensor operations for border surveillance
by Roberto Szechtman & Moshe Kress & Kyle Lin & Dolev Cfir - 42-58 Ambulance location for maximum survival
by Erhan Erkut & Armann Ingolfsson & Güneş Erdoğan - 59-75 Optimal timing of switches between product sales for sports and entertainment tickets
by Matthew J. Drake & Serhan Duran & Paul M. Griffin & Julie L. Swann - 76-90 A search game taking account of attributes of searching resources
by Ryusuke Hohzaki - 91-99 Technical note: An improved range chart for normal and long‐tailed symmetrical distributions
by Pandu Tadikamalla & Mihai Banciu & Dana Popescu
December 2007, Volume 54, Issue 8
- 811-819 What you should know about the vehicle routing problem
by Gilbert Laporte - 820-828 Tail hazard rate ordering properties of order statistics and coherent systems
by Jorge Navarro - 829-844 A supply chain design model with unreliable supply
by Lian Qi & Zuo‐Jun Max Shen - 845-858 Production to order and off‐line inspection when the production process is partially observable
by Abraham Grosfeld‐Nir & Eyal Cohen & Yigal Gerchak - 859-873 Switching costs, dynamic uncertainty, and buyer–seller relationships
by Nagesh N. Murthy & Milind Shrikhande & Ajay Subramanian - 874-889 Dynamic order acceptance and capacity planning on a single bottleneck resource
by Jade Herbots & Willy Herroelen & Roel Leus - 890-907 Benders decomposition with alternative multiple cuts for a multi‐product closed‐loop supply chain network design model
by Halit Üster & Gopalakrishnan Easwaran & Elif Akçali & Sila Çetinkaya
October 2007, Volume 54, Issue 7
- 709-709 From the editor: Online supplements to published papers in NRL
by Barry L. Nelson - 710-719 Network disconnection problems in a centralized network
by Young‐Soo Myung & Hyun‐Joon Kim - 720-731 Optimal burn‐in procedure for periodically inspected systems
by Ji Hwan Cha & Jie Mi - 732-741 A branch‐and‐price algorithm for a targeting problem
by Ojeong Kwon & Kyungsik Lee & Donghan Kang & Sungsoo Park - 742-749 Untruthful probabilistic demand forecasts in vendor‐managed revenue‐sharing contracts: Coordinating the chain
by Yigal Gerchak & Eugene Khmelnitsky & Lawrence W. Robinson - 750-766 Machine maintenance with workload considerations
by David L. Kaufman & Mark E. Lewis - 767-795 A nonlinear continuous time optimal control model of dynamic pricing and inventory control with no backorders
by Elodie Adida & Georgia Perakis - 796-810 Capacity allocation to sales agents in a decentralized logistics network
by Ozgun Caliskan Demirag & Julie L. Swann
September 2007, Volume 54, Issue 6
- 589-601 Constrained minimax optimization of continuous search efforts for the detection of a stationary target
by Frédéric Dambreville & Jean‐Pierre Le Cadre - 602-614 Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
by Yarlin Kuo & Zi‐Ann Chang - 615-622 The impact of component commonality on composite assembly policies
by Amit Eynan & Meir J. Rosenblatt - 623-631 Probabilistic solution and bounds for serial inventory systems with discounted and average costs
by Xiuli Chao & Sean X. Zhou - 632-644 Lateral capacity exchange and its impact on capacity investment decisions
by Amiya K. Chakravarty & Jun Zhang - 645-655 Structured maintenance policies on interior sample paths
by Lisa M. Maillart & Ludmila Zheltova - 656-666 The minmax multidimensional knapsack problem with application to a chance‐constrained problem
by Moshe Kress & Michal Penn & Maria Polukarov - 667-680 The impact of manufacturer rebates on supply chain profits
by Xin Chen & Chung‐Lun Li & Byong‐Duk Rhee & David Simchi‐Levi - 681-691 Modeling and analysis of a mixed‐model assembly line with stochastic operation times
by Xiaobo Zhao & Jianyong Liu & Katsuhisa Ohno & Shigenori Kotani - 692-701 Dynamic lot‐sizing model with production time windows
by Hark‐Chin Hwang - 702-708 Technical note: Characterization of binomial semivalues through delegation games
by Rafael Amer & José Miguel Giménez
August 2007, Volume 54, Issue 5
- 475-475 Editorial: What you should know about…
by Barry L. Nelson - 476-484 What you should know about queueing models to set staffing requirements in service systems
by Ward Whitt - 485-491 On the first come–first served rule in multi‐echelon inventory control
by Sven Axsäter - 492-496 Rendez‐vous search on a rectangular lattice
by William H. Ruckle - 497-509 Analysis of practical policies for a single link distribution system
by Luca Bertazzi & Lap Mui Ann Chan & Maria Grazia Speranza - 510-523 Managing components for assemble‐to‐order products with lead‐time‐dependent pricing: The full‐shipment model
by Vernon Ning Hsu & Chung Yee Lee & Kut C. So - 524-529 Waiting time analysis of the M/G/1 queue with finite retrial group
by Jesus R. Artalejo & A. Gómez‐Corral - 530-543 Interval scheduling: A survey
by Antoon W.J. Kolen & Jan Karel Lenstra & Christos H. Papadimitriou & Frits C.R. Spieksma - 544-555 The importance of decoupling recurrent and disruption risks in a supply chain
by Sunil Chopra & Gilles Reinhardt & Usha Mohan - 556-567 Puzzle‐based storage systems
by Kevin R. Gue & Byung Soo Kim - 568-582 On optimal system designs in reliability‐economics frameworks
by Michael R. Dugas & Francisco J. Samaniego - 583-587 Technical note: Worst‐case performance of power‐of‐two policies for serial inventory systems with incremental quantity discounts
by Brian Q. Rieksts & José A. Ventura & Yale T. Herer & Daning Sun
June 2007, Volume 54, Issue 4
- 357-370 Analysis of decentralized multi‐product pull systems with lost sales
by Cigdem Z. Gurgur & Tayfur Altiok - 371-383 Kurtosis correction method for X̄ and R control charts for long‐tailed symmetrical distributions
by Pandu R. Tadikamalla & Dana G. Popescu - 384-396 Combining standardized time series area and Cramér–von Mises variance estimators
by David Goldsman & Keebom Kang & Seong‐Hee Kim & Andrew F. Seila & Gamze Tokol - 397-410 Exact expected values of variance estimators for simulation
by Tûba Aktaran‐Kalaycı & Christos Alexopoulos & Nilay Tanık Argon & David Goldsman & James R. Wilson - 411-420 Pricing bridges to cross a river
by Mustapha Bouhtou & Alexander Grigoriev & Stan van Hoesel & Anton F. van der Kraaij & Frits C.R. Spieksma & Marc Uetz - 421-432 Collaboration in contingent capacities with information asymmetry
by Amiya K. Chakravarty & Jun Zhang - 433-447 Integrated capacity, demand, and production planning with subcontracting and overtime options
by Yasemin Merzifonluoğlu & Joseph Geunes & H.E. Romeijn - 448-461 Dynamic learning, pricing, and ordering by a censored newsvendor
by Arnab Bisi & Maqbool Dada - 462-473 Performance evaluation of a production/inventory system with periodic review and endogenous lead times
by Robert N. Boute & Marc R. Lambrecht & Benny Van Houdt
April 2007, Volume 54, Issue 3
- 237-249 Optimal sample size allocation for tests with multiple levels of stress with extreme value regression
by H. K. T. Ng & N. Balakrishnan & P. S. Chan - 250-257 Parallel machine scheduling with job assignment restrictions
by Celia A. Glass & Hans Kellerer - 258-264 Designing safety space in a supply chain to handle system‐wide disruptions
by Murthy Mudrageda & Frederic H. Murphy - 265-281 Bayesian strategies for dynamic pricing in e‐commerce
by Eric Cope - 282-300 Outbound supply chain network design with mode selection and lead time considerations
by Erdem Eskigun & Reha Uzsoy & Paul V. Preckel & George Beaujon & Subramanian Krishnan & Jeffrey D. Tew - 301-314 Optimizing the quality control station configuration
by Michal Penn & Tal Raviv - 315-330 Joint pricing, assortment, and inventory decisions for a retailer's product line
by Bacel Maddah & Ebru K. Bish - 331-345 A produce‐to‐stock system with advance demand information and secondary customers
by Seyed M.R. Iravani & Tieming Liu & K.L. Luangkesorn & David Simchi‐Levi - 346-355 On optimality of one‐bug‐look‐ahead policies for a software testing model
by Xiaoyue Jiang & Donglei Du & Thomas G. Ray
March 2007, Volume 54, Issue 2
- 115-127 A m‐parallel crane scheduling problem with a non‐crossing constraint
by Andrew Lim & Brian Rodrigues & Zhou Xu - 128-135 Some probability functions in reliability and their applications
by Ji Hwan Cha & Jie Mi - 136-150 Flexibility and complexity in periodic distribution problems
by Peter Francis & Karen Smilowitz & Michal Tzur - 151-161 Robust tower location for code division multiple access networks
by Jay M. Rosenberger & Eli V. Olinick - 162-175 The strategic effects of a merger upon supplier interactions
by Stephen M. Gilbert & Gang Yu & Yusen Xia - 176-188 On the effectiveness of top‐down strategy for forecasting autoregressive demands
by Handik Widiarta & S. Viswanathan & Rajesh Piplani - 189-199 Quantifying the performance effects of idle time utilization in multiserver systems
by Naishuo Tian & Zhe George Zhang - 200-220 Cyclic preference scheduling for nurses using branch and price
by Hadi W. Purnomo & Jonathan F. Bard - 221-235 On valuing appreciating human assets in services
by O. Zeynep Akşin
February 2007, Volume 54, Issue 1
- 1-10 Simultaneous price, location, and capacity decisions on a line of time‐sensitive customers
by Gregory Dobson & Euthemia Stavrulaki - 11-20 Machine scheduling with an availability constraint and job delivery coordination
by Xiuli Wang & T. C. Edwin Cheng - 21-32 New heuristic methods for the capacitated multi‐facility Weber problem
by Necati Aras & İ. Kuban Altınel & Metin Orbay - 33-45 Estimation of average backorders for an assemble‐to‐order system with random batch demands through extreme statistics
by Yingdong Lu - 46-58 Discrete search allocation game with false contacts
by Ryusuke Hohzaki - 59-65 Sojourn time analysis of a queueing system with two‐phase service and server vacations
by Tsuyoshi Katayama & Kaori Kobayashi - 66-77 Effective attacks in the salvo combat model: Salvo sizes and quantities of targets
by Michael J. Armstrong - 78-93 Efficient generation of cycle time‐throughput curves through simulation and metamodeling
by Feng Yang & Bruce Ankenman & Barry L. Nelson - 94-108 Inventory control and periodic price discounting campaigns
by Ben A. Chaouch - 109-114 Technical note: Find a hidden “treasure”
by A. Garnaev
December 2006, Volume 53, Issue 8
- 727-727 From the editor: Technical notes in NRL
by Barry L. Nelson - 728-747 Aircraft routing under the risk of detection
by Michael Zabarankin & Stan Uryasev & Robert Murphey - 748-760 Structural properties of network revenue management models: An economic perspective
by Alec Morton - 761-771 An inspection game: Taking account of fulfillment probabilities of players' aims
by Ryusuke Hohzaki & Diasuke Kudoh & Toru Komiya - 772-787 Capacity allocation with traditional and Internet channels
by Yue Dai & Xiuli Chao & Shu‐Cherng Fang & Henry L.W. Nuttle - 788-803 A logistic regression/Markov chain model for NCAA basketball
by Paul Kvam & Joel S. Sokol - 804-813 Optimal maintenance policies for serial, multi‐machine systems with non‐instantaneous repairs
by Lisa M. Maillart & Xiang Fang - 814-821 Effects of cueing in cooperative search
by David E. Jeffcoat & Pavlo A. Krokhmal & Olesya I. Zhupanska - 822-841 Approximate dynamic programming methods for an inventory allocation problem under uncertainty
by Huseyin Topaloglu & Sumit Kunnumkal
October 2006, Volume 53, Issue 7
- 601-602 Introduction to the special issue on applications of financial engineering in operations, production, services, logistics, and management
by John Birge & Vadim Linetsky - 603-616 Mean‐variance trade‐offs in supply contracts
by Victor Martínez‐de‐Albéniz & David Simchi‐Levi - 617-626 The α‐reliable mean‐excess regret model for stochastic facility location modeling
by Gang Chen & Mark S. Daskin & Zuo‐Jun Max Shen & Stanislav Uryasev - 627-640 Market risk and process uncertainty in production operations
by Bardia Kamrad & Keith Ord - 641-655 Equity valuation, production, and financial planning: A stochastic programming approach
by Xiaodong Xu & John R. Birge - 656-673 Vulnerable options in supply chains: Effects of supplier competition
by Volodymyr Babich - 674-696 Financial engineering of the integration of global supply chain networks and social networks with risk management
by Jose M. Cruz & Anna Nagurney & Tina Wakolbinger - 697-712 Hedging quantity risks with standard power options in a competitive wholesale electricity market
by Yumi Oum & Shmuel Oren & Shijie Deng - 713-726 Stochastic programming models for replication of electricity forward contracts for industry
by Roy H. Kwon & J. Scott Rogers & Sheena Yau
September 2006, Volume 53, Issue 6
- 485-501 Vertically restrictive pricing in supply chains with price‐dependent demand
by Yong Liu & Michael J. Fry & Amitabh S. Raturi - 502-507 An absolute approximation algorithm for scheduling unrelated machines
by Evgeny Shchepin & Nodari Vakhania - 508-524 Replicated batch means for steady‐state simulations
by Nilay Tanık Argon & Sigrún Andradóttir - 525-546 The stochastic joint replenishment problem: A new policy, analysis, and insights
by Banu Yüksel Özkaya & Ülkü Gürler & Emre Berk - 547-567 Emergency transshipment in decentralized dealer networks: When to send and accept transshipment requests
by Hui Zhao & Vinayak Deshpande & Jennifer K. Ryan - 568-575 A heuristic for maximizing the number of on‐time jobs on two uniform parallel machines
by Christos Koulamas & George J. Kyparisis - 576-587 Reliability inference for field conditions from accelerated degradation testing
by Haitao Liao & Elsayed A. Elsayed - 588-599 Modeling and analysis of uncertain time‐critical tasking problems
by Donald P. Gaver & Patricia A. Jacobs & Gennady Samorodnitsky & Kevin D. Glazebrook
August 2006, Volume 53, Issue 5
- 363-382 Priority and dynamic scheduling in a make‐to‐stock queue with hyperexponential demand
by Apurva Jain - 383-396 Data‐driven variation source identification for manufacturing process using the eigenspace comparison method
by Nong Jin & Shiyu Zhou - 397-417 Contractual agreements for coordination and vendor‐managed delivery under explicit transportation considerations
by Ayşegül Toptal & Sıla Çetinkaya - 418-431 Requirements planning for modular products
by Anand Paul & Asoo J. Vakharia - 432-447 A misclassification cost‐minimizing evolutionary–neural classification approach
by Parag Pendharkar & Sudhir Nanda - 448-463 Resale price maintenance contracts with retailer sales effort: Effect of flexibility and competition
by Haresh Gurnani & Yi Xu - 464-476 Fully sequential indifference‐zone selection procedures with variance‐dependent sampling
by L. Jeff Hong - 477-483 On‐line parameter estimation for a partially observable system subject to random failure
by Daming Lin & Viliam Makis
June 2006, Volume 53, Issue 4
- 235-242 Relaxed sequencing games have a nonempty core
by Marco Slikker - 243-260 Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel
by Joseph Y‐T. Leung & Haibing Li & Michael Pinedo - 261-271 A mathematical programming approach for improving the robustness of least sum of absolute deviations regression
by Avi Giloni & Bhaskar Sengupta & Jeffrey S. Simonoff - 272-284 Maximizing project cash availability
by Joseph G. Szmerekovsky & George L. Vairaktarakis - 285-297 Using real options analysis to value reoptimization options in the shifting bottleneck heuristic
by Thomas G. Yeung & Scott J. Mason - 298-308 Bin‐packing problem with concave costs of bin utilization
by Chung‐Lun Li & Zhi‐Long Chen - 309-317 Maximizing the ratio of two convex functions over a convex set
by Harold P. Benson - 318-353 Transient analysis of Markov models of fault‐tolerant systems with deferred repair using split regenerative randomization
by Jamal Temsamani & Juan A. Carrasco - 354-362 A sequential Bayesian generalization of the Jelinski–Moranda software reliability model
by Alan Washburn
April 2006, Volume 53, Issue 3
- 181-182 Editorial
by Barry L. Nelson - 183-197 A multilevel passenger screening problem for aviation security
by Laura A. McLay & Sheldon H. Jacobson & John E. Kobza - 198-203 The Banzhaf value and communication situations
by J.M. Alonso‐Meijide & M.G. Fiestras‐Janeiro - 204-216 Minimizing the makespan in open‐shop scheduling problems with a convex resource consumption function
by Dvir Shabtay & Moshe Kaspi - 217-225 Modeling the operation of multireservoir systems using decomposition and stochastic dynamic programming
by T.W. Archibald & K.I.M. McKinnon & L.C. Thomas - 226-234 A stochastic model for burn‐in procedures in accelerated environment
by Ji Hwan Cha
March 2006, Volume 53, Issue 2
- 117-136 Optimal pricing and inventory control policy in periodic‐review systems with fixed ordering cost and lost sales
by Youhua (Frank) Chen & Saibal Ray & Yuyue Song - 137-150 A general strategic capacity planning model under demand uncertainty
by Woonghee Tim Huh & Robin O. Roundy & Metin Çakanyildirim - 151-156 Optimal production and maintenance policy for imperfect production systems
by Chih‐Hsiung Wang - 157-169 Algorithms for the multi‐item multi‐vehicles dynamic lot sizing problem
by Shoshana Anily & Michal Tzur - 170-179 A new reformulation approach for the generalized partial covering problem
by Youngho Lee & Hanif D. Sherali & Ikhyun Kwon & Seongin Kim
February 2006, Volume 53, Issue 1
- 1-15 Inducing coordination in supply chains through linear reward schemes
by Boaz Golany & Uriel G. Rothblum - 16-23 Polynomial‐time approximation schemes for two‐machine open shop scheduling with nonavailability constraints
by M.A. Kubzin & V.A. Strusevich & J. Breit & G. Schmidt - 24-44 A branch‐and‐price algorithm for parallel machine scheduling with time windows and job priorities
by Jonathan F. Bard & Siwate Rojanasoonthon - 45-59 A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal
by Luigi Moccia & Jean‐François Cordeau & Manlio Gaudioso & Gilbert Laporte - 60-74 Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
by Jiyin Liu & Yat‐wah Wan & Lei Wang - 75-90 Optimization and mediated bartering models for ground delay programs
by Thomas Vossen & Michael Ball - 91-100 The bottleneck problem with minimum quantity commitments
by Andrew Lim & Zhou Xu - 101-114 An EOQ model with multiple suppliers and random capacity
by Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici
December 2005, Volume 52, Issue 8
- 701-712 Distribution network design: Selection and sizing of congested connections
by Simin Huang & Rajan Batta & Rakesh Nagi - 713-723 Allocation of resources of modular sizes with an application to Internet Protocol (IP) address allocation
by Hanan Luss - 724-733 Transshipment through crossdocks with inventory and time windows
by Andrew Lim & Zhaowei Miao & Brian Rodrigues & Zhou Xu - 734-753 Markets for surplus components with a strategic supplier
by Lingxiu Dong & Erik Durbin - 754-764 Short‐term capacity allocation problem with tool and setup constraints
by Elif Akçalı & Alper Üngör & Reha Uzsoy - 765-779 On the effectiveness of returns policies in the price‐dependent newsvendor model
by Daniel Granot & Shuya Yin - 780-795 Commitment decisions with partial information updating
by Mark E. Ferguson & Gregory A. DeCroix & Paul H. Zipkin - 796-809 Production and transport logistics scheduling with two transport mode choices
by Haiyan Wang & Chung‐Yee Lee
October 2005, Volume 52, Issue 7
- 607-616 Properties of the geometric and related processes
by W. John Braun & Wei Li & Yiqiang Q. Zhao - 617-630 Machine scheduling with pickup and delivery
by Chung‐Lun Li & Jinwen Ou - 631-644 Non‐greedy heuristics and augmented neural networks for the open‐shop scheduling problem
by Selcuk Colak & Anurag Agarwal - 645-658 Quantity discount pricing policies for heterogeneous retailers with price sensitive demand
by Qinan Wang & Ruifang Wang - 659-667 Capacity allocation with machine duplication in semiconductor manufacturing
by Bülent Çatay & Ş. Selçuk Erengüç & Asoo J. Vakharia - 668-681 Optimal joint preventive maintenance and production policies
by Xiaodong Yao & Xiaolan Xie & Michael C. Fu & Steven I. Marcus - 682-700 Approximations and empirics for stochastic war equations
by Kjell Hausken & John F. Moxnes
September 2005, Volume 52, Issue 6
- 481-492 Project scheduling under competition
by Igor Averbakh & Vasilij Lebedev - 493-512 Coordinated scheduling of customer orders for quick response
by Reza Ahmadi & Uttarayan Bagchi & Thomas A. Roemer