IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v55y2008i5p390-405.html
   My bibliography  Save this article

Delivery‐date and capacity management in a decentralized internal market

Author

Listed:
  • Murat Erkoc
  • S. David Wu
  • Haresh Gurnani

Abstract

We study competitive due‐date and capacity management between the marketing and engineering divisions within an engineer‐to‐order (ETO) firm. Marketing interacts directly with the customers and quotes due‐dates for their orders. Engineering is primarily concerned with the efficient utilization of resources and is willing to increase capacity if the cost is compensated. The two divisions share the responsibility for timely delivery of the jobs. We model the interaction between marketing and engineering as a Nash game and investigate the effect of internal competition on the equilibrium decisions. We observe that the internal competition not only degrades the firm's overall profitability but also the serviceability. Finally, we extend our analysis to multiple‐job settings that consider both flexible and inflexible capacity. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008

Suggested Citation

  • Murat Erkoc & S. David Wu & Haresh Gurnani, 2008. "Delivery‐date and capacity management in a decentralized internal market," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 390-405, August.
  • Handle: RePEc:wly:navres:v:55:y:2008:i:5:p:390-405
    DOI: 10.1002/nav.20290
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/nav.20290
    Download Restriction: no

    File URL: https://libkey.io/10.1002/nav.20290?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Izak Duenyas & Wallace J. Hopp, 1995. "Quoting Customer Lead Times," Management Science, INFORMS, vol. 41(1), pages 43-57, January.
    2. Kut C. So, 2000. "Price and Time Competition for Service Delivery," Manufacturing & Service Operations Management, INFORMS, vol. 2(4), pages 392-409, April.
    3. Albert Y. Ha, 1998. "Incentive-Compatible Pricing for a Service Facility with Joint Production and Congestion Externalities," Management Science, INFORMS, vol. 44(12-Part-1), pages 1623-1636, December.
    4. Konijnendijk, Paul A., 1994. "Coordinating marketing and manufacturing in ETO companies," International Journal of Production Economics, Elsevier, vol. 37(1), pages 19-26, November.
    5. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    6. Sridhar Balasubramanian & Pradeep Bhardwaj, 2004. "When Not All Conflict Is Bad: Manufacturing-Marketing Conflict and Strategic Incentive Design," Management Science, INFORMS, vol. 50(4), pages 489-502, April.
    7. K. Roscoe Davis, 1977. "The Process of Problem Finding: A Production-Marketing Example," Interfaces, INFORMS, vol. 8(1), pages 82-86, November.
    8. So, Kut C. & Song, Jing-Sheng, 1998. "Price, delivery time guarantees and capacity selection," European Journal of Operational Research, Elsevier, vol. 111(1), pages 28-49, November.
    9. Evan L. Porteus & Seungjin Whang, 1991. "On Manufacturing/Marketing Incentives," Management Science, INFORMS, vol. 37(9), pages 1166-1181, September.
    10. Spencer, M. & Cox, J. III, 1994. "Sales and manufacturing coordination in repetitive manufacturing: Characteristics and problems," International Journal of Production Economics, Elsevier, vol. 37(1), pages 73-81, November.
    11. Hicks, C. & McGovern, T. & Earl, C. F., 2000. "Supply chain management: A strategic issue in engineer to order manufacturing," International Journal of Production Economics, Elsevier, vol. 65(2), pages 179-190, April.
    12. Mark L. Spearman & Rachel Q. Zhang, 1999. "Optimal Lead Time Policies," Management Science, INFORMS, vol. 45(2), pages 290-295, February.
    13. Lawrence M. Wein, 1991. "Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue," Management Science, INFORMS, vol. 37(7), pages 834-850, July.
    14. Phillip J. Lederer & Lode Li, 1997. "Pricing, Production, Scheduling, and Delivery-Time Competition," Operations Research, INFORMS, vol. 45(3), pages 407-420, June.
    15. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    16. Gérard P. Cachon, 2001. "Stock Wars: Inventory Competition in a Two-Echelon Supply Chain with Multiple Retailers," Operations Research, INFORMS, vol. 49(5), pages 658-674, October.
    17. John B. Van Huyck & Raymond C. Battalio & Richard O. Beil, 1991. "Strategic Uncertainty, Equilibrium Selection, and Coordination Failure in Average Opinion Games," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 106(3), pages 885-910.
    18. Steven A. Lippman & Kevin F. McCardle, 1997. "The Competitive Newsboy," Operations Research, INFORMS, vol. 45(1), pages 54-65, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hongyan Li & Joern Meissner, 2018. "Capacity optimization and competition with cyclical and lead-time-dependent demands," Annals of Operations Research, Springer, vol. 271(2), pages 737-763, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Weixin Shang & Liming Liu, 2011. "Promised Delivery Time and Capacity Games in Time-Based Competition," Management Science, INFORMS, vol. 57(3), pages 599-610, March.
    2. Philipp Afèche & Opher Baron & Yoav Kerner, 2013. "Pricing Time-Sensitive Services Based on Realized Performance," Manufacturing & Service Operations Management, INFORMS, vol. 15(3), pages 492-506, July.
    3. Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
    4. Huang, Yeu-Shiang & Chen, Si-Hen & Ho, Jyh-Wen, 2013. "A study on pricing and delivery strategy for e-retailing systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 59(C), pages 71-84.
    5. Barış Ata & Tava Lennon Olsen, 2009. "Near-Optimal Dynamic Lead-Time Quotation and Scheduling Under Convex-Concave Customer Delay Costs," Operations Research, INFORMS, vol. 57(3), pages 753-768, June.
    6. Charnsirisakskul, Kasarin & Griffin, Paul M. & Keskinocak, Pinar, 2006. "Pricing and scheduling decisions with leadtime flexibility," European Journal of Operational Research, Elsevier, vol. 171(1), pages 153-169, May.
    7. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    8. Li, Xueping & Wang, Jiao & Sawhney, Rapinder, 2012. "Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 99-109.
    9. Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
    10. Tang, Christopher S., 2010. "A review of marketing-operations interface models: From co-existence to coordination and collaboration," International Journal of Production Economics, Elsevier, vol. 125(1), pages 22-40, May.
    11. Feng, Jiejian & Zhang, Michael, 2017. "Dynamic quotation of leadtime and price for a Make-To-Order system with multiple customer classes and perfect information on customer preferences," European Journal of Operational Research, Elsevier, vol. 258(1), pages 334-342.
    12. Erica L. Plambeck, 2004. "Optimal Leadtime Differentiation via Diffusion Approximations," Operations Research, INFORMS, vol. 52(2), pages 213-228, April.
    13. Ray, Saibal & Jewkes, E. M., 2004. "Customer lead time management when both demand and price are lead time sensitive," European Journal of Operational Research, Elsevier, vol. 153(3), pages 769-781, March.
    14. A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
    15. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    16. Öner-Közen, Miray & Minner, Stefan, 2017. "Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates," European Journal of Operational Research, Elsevier, vol. 263(2), pages 524-539.
    17. Zhi-Long Chen & Nicholas G. Hall, 2010. "The Coordination of Pricing and Scheduling Decisions," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 77-92, April.
    18. Abhijit Upasani & Reha Uzsoy, 2008. "Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions," Annals of Operations Research, Springer, vol. 161(1), pages 171-188, July.
    19. Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
    20. Gérard P. Cachon & Patrick T. Harker, 2002. "Competition and Outsourcing with Scale Economies," Management Science, INFORMS, vol. 48(10), pages 1314-1333, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:55:y:2008:i:5:p:390-405. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.