Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
December 1996, Volume 46-47, Issue 1
August 1996, Volume 45, Issue 1-3
- 1-1 Preface
by Attila Chikan
- 1-7 The volume and structure of inventories
by Chikan, Attila
- 9-19 Inventories cycle in an augmented RBC model
by Collard, Fabrice & Jacques, Jean-Francois
- 21-27 Temporal aggregation and estimation of inventory functions
by Ghali, Moheb
- 29-36 Conditional volatility and the production smoothing hypothesis of inventory investment
by Ginama, Isamu
- 37-46 Has inventory management in the US become more efficient and flexible? A macroeconomic perspective
by Hirsch, Albert A.
- 47-54 Inventory investment in Greek manufacturing industry: Effects from participation in the European market
by Louri, Helen
- 55-64 Macroeconomic implications of S,s versus accelerator finished goods inventory strategies
by Lovell, Michael C.
- 65-75 Financing constraints and reordering rules
by Milne, Alistair
- 77-81 Does the time shape of inventory data hold clues on inventory behaviour
by Reinhardt, Paul & Beyer, Dirk
- 83-90 Heuristic production triggering mechanisms under discrete unequal inventory withdrawals
by Banerjee, Avijit & Burton, Jonathan & Banerjee, Snehamay
- 91-99 Inventory and enterprise integration
by Bonney, M. C. & Head, M. A. & Tien, C. C. & Huang, N. & Barson, R. J.
- 101-109 A visually interactive expert system for a distribution center environment
by Carlson, John G. & Yao, Andrew C.
- 111-119 A conceptual framework for managing congestion in manufacturing
by Gunasekaran, A. & Martikainen, T. & Virtanen, I. & Yli-Olli, P.
- 121-130 Systems design of a two-echelon steel industry supply chain
by Hafeez, K. & Griffiths, M. & Griffiths, J. & Naim, M. M.
- 131-137 A framework for cost-service analysis in differentiation of logistics services
by Pirttila, Timo & Huiskonen, Janne
- 139-146 A comparison of fixed and adaptive type controls for multi-product processing
by Kelle, Peter & Peak, David
- 147-157 Inventories and customer service in Polish manufacturing companies
by Kisperska-Moron, Danuta
- 159-168 Inventory forecasting with a multiple criteria decision tool
by Korpela, Jukka & Tuominen, Markku
- 169-180 A decision aid in warehouse site selection
by Korpela, Jukka & Tuominen, Markku
- 181-186 Information systems design requirements for inventory management: A conceptual approach
by Manthou, Vassiliki & Notopoulos, Panagiotis & Vlachopoulou, Maro
- 187-193 The implementation and use of material requirements planning system in Northern Greece: A case study
by Manthou, Vassiliki & Vlachopoulou, Maro & Theodorou, Petros
- 195-202 Generic organizational choices for logistics in decentralized organizations Implications for inventory management
by Pirttila, Timo & Niemi, Petri
- 203-214 The new management paradigm: An extension through the IFAM perspective
by Nyerges, Richard T.
- 215-222 Import related inventory management in Indian economy
by Prasad, K. N. & A.M. Swaminathan, (Miss) & Parkar, R. G.
- 223-230 A step-wise method for product range management and production control decisions: A case study at a board industry company
by Pirttila, Timo & Sandstrom, Robert
- 231-237 Macroeconomic analyses of inventories: learning from practice
by Sprague, Linda G. & Wacker, John G.
- 239-249 Reducing inventories in a multi-echelon manufacturing firm A case study
by Stenger, Alan J.
- 251-260 Restructuring the bill of material for productivity: A strategic evaluation of product configuration
by Stonebraker, Peter W.
- 261-270 Grain stocking and storing in Benue State: An appraisal of the Federal Government of Nigeria's food grain storage policy
by Chinedu Umeh, J. & Agunwamba, C. C. & Agada, O. A. D.
- 271-278 Positioning inventory in distribution systems
by Whybark, D. Clay & Yang, Shitao
- 279-292 An MCDM framework for dynamic systems
by Agrell, Per J. & Wikner, Joakim
- 293-302 Tracking signals in inventory control systems A simulation study
by Alstrom, Poul & Madsen, Per
- 303-310 Comparison of echelon stock and installation stock policies for two-level inventory systems
by Axsater, Sven & Juntti, Lars
- 311-320 The undershoot of the reorder point: Tests of an approximation
by Baganha, Manuel P. & Pyke, David F. & Ferrer, Geraldo
- 321-327 Investment policy for multiple product setup reduction under budgetary and capacity constraints
by Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae
- 329-336 Stochastic considerations of Grubbstrom--Molinder model of MRP, input-output and multi-echelon inventory systems
by Bogataj, Ludvik & Horvat, Liljana
- 337-342 Inventories in spatial models
by Bogataj, Marija
- 343-352 Variance laws for inventory management
by Boylan, I. E. & Johnston, F. R.
- 353-359 Stability problems in inventory theory
by Bulinskaya, E. V.
- 361-368 Inventory model with two stocks
by Bylka, S. & Komar, J.
- 369-379 Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy
by Diks, E. B. & de Kok, A. G.
- 381-388 Continuous review inventory control when capacity is variable
by Wang, Yunzeng & Gerchak, Yigal
- 389-395 Some comments on normal approximation for stochastic demand processes
by Girlich, Hans-Joachim
- 397-406 Inventory trigger control policies developed in terms of control theory
by Grubbstrom, Robert W. & Wikner, Joakim
- 407-419 Stochastic properties of a production--inventory process with planned production using transform methodology
by Grubbstrom, Robert W.
- 421-427 Batching policies for a product life cycle
by Hill, Roger M.
- 429-433 On queueing models for some multi-location problems
by Kochel, Peter
- 435-441 Fuzzy models for the newsboy problem
by Petrovic, Dobrila & Petrovic, Radivoj & Vujosevic, Mirko
- 443-447 The extended EOQ repair and waste disposal model
by Richter, Knut
- 449-461 A capacity-constrained multi-level inventory and production control problem
by Segerstedt, Anders
- 463-472 Some insights regarding selecting sets of scenarios in combinatorial stochastic problems
by Jonsson, Henrik & Silver, Edward A.
- 473-478 Optimal solution of a total time distribution problem
by Tsouros, C. & Satratzemi, M.
- 479-487 A dynamic game model for distribution problems with non-stochastic uncertainty
by Blanchini, Franco & Rinaldi, Franca & Ukovich, Walter
- 489-498 Product remanufacturing and disposal: A numerical comparison of alternative control strategies
by van der Laan, Erwin & Dekker, Rommert & Salomon, Marc
- 499-504 EOQ formula when inventory cost is fuzzy
by Vujosevic, Mirko & Petrovic, Dobrila & Petrovic, Radivoj
July 1996, Volume 44, Issue 3
- 177-187 Modelling resource supply and demand: Expanding the utility of ABC
by Salafatinos, Chris
- 189-199 The role of logistics in concurrent engineering
by Dowlatshahi, S.
- 201-206 A comment on Standish et al.: The problem with CALS: Barriers to the development of product data exchange and the US continuous acquisition and life-cycle support programme
by Spinardi, Graham & Graham, Ian & Williams, Robin
- 207-224 The payback method of investment appraisal: A review and synthesis
by Lefley, Frank
- 225-237 Efficient heuristic and optimal approaches for n/2/F/[sigma]Ci scheduling problems
by Wang, Chengen & Chu, Chengbin & Proth, Jean-Marie
- 239-248 Inventory models for fast moving spare parts subject to "sudden death" obsolescence
by Cobbaert, Koen & Van Oudheusden, Dirk
- 249-253 Scheduling to minimize the coefficient of variation
by De, Prabuddha & Ghosh, Jay B. & Wells, Charles E.
- 255-265 Discounted costs, obsolescence and planned stockouts with the EOQ formula
by van Delft, Ch. & Vial, J. P.
- 267-275 A two-item newsboy problem with substitutability
by Khouja, Moutaz & Mehrez, Abraham & Rabinowitz, Gad
June 1996, Volume 44, Issue 1-2
- 1-2 In honor of Professor Rintaro Muramatsu
by Salvendy, Gavriel
- 3-5 In memoriam: Professor Rintaro Muramatsu, 1916-1994
by Grubbstrom, Robert W.
- 7-15 Lot scheduling problem for continuous demand
by Seki, Yoichi & Kogure, Keiji
- 17-26 A new concept of job shop scheduling system -- hierarchical decision model
by Tagawa, Shinichi
- 27-33 A study of production management system with MRP
by Nakagiri, Daiju & Kuriyama, Sennosuke
- 35-43 Single machine scheduling using dominance relation to minimize earliness subject to ready and due times
by Asano, Makoto & Ohta, Hiroshi
- 45-51 Fuzzy job shop scheduling
by Kuroda, Mitsuru & Wang, Zeng
- 53-61 Replanning timing in hierarchical production planning
by Tsubone, Hitoshi & Furuta, Hirohisa
- 63-72 On a two-stage hierarchical production planning system for process industries
by Katayama, Hiroshi
- 73-81 The elements and functions of hierarchical scheduling system of order production
by Ichimura, Takaya
- 83-89 Comparing integration strategies in production ordering systems
by Takahashi, Katsuhiko & Soshiroda, Michio
- 91-95 Criterion for choosing ordering policies between fixed-size and fixed-interval, pull-type and push-type
by Hoshino, Kyoji
- 97-103 Hybrid just-in-time logistics systems and information networks for effective management in perishable food industries
by Iijima, M. & Komatsu, S. & Katoh, S.
- 105-117 Comparative analysis of ordering models for an international co-operative global complementary production system
by Hiraki, Shusaku
- 119-128 A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
by Ishii, Kazuyoshi & Imori, Shigeki
- 129-135 Performance of a multistage hybrid push/pull production control system
by Hirakawa, Yasuhiro
- 137-149 Makespan comparison between resequencing and switching in a dynamic manufacturing environment
by Matsuura, Haruki & Kanezashi, Masakazu
- 151-157 An analytical comparison of inventory costs between the pull and the parts-oriented production systems
by Miyazaki, Shigeji
- 159-166 Reserve production capacity in a production inventory system
by Okubo, Bin
- 167-176 Perishable inventory control with two types of customers and different selling prices under the warehouse capacity constraint
by Ishii, Hiroaki & Nose, Toyokazu
June 1996, Volume 43, Issue 2-3
- 79-89 A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
by Franca, Paulo M. & Gendreau, Michel & Laporte, Gilbert & Muller, Felipe M.
- 91-106 A fuzzy pooling of investment cost knowledge
by Dohnal, M. & Fraser, D. M. & Kerkovsky, M.
- 107-113 Due-date assignment and single machine scheduling with compressible processing times
by Cheng, T. C. E. & Oguz, C. & Qi, X. D.
- 115-126 Performance modeling of multistage production systems operating under hybrid push/pull control
by Pandey, P. C. & Khokhajaikiat, Porntep
- 127-137 Batching in production planning for flexible manufacturing systems
by Srivastava, Bharatendu & Chen, Wun-Hwa
- 139-148 An efficient heuristic procedure for the single-item, discrete lot sizing problem
by Canel, Cem & Khumawala, Basheer M. & Law, Japhet S.
- 149-154 Batching policies for linearly increasing demand with a finite input rate
by Hill, Roger M.
- 155-174 What difference does your industry make?
by Hamblin, David & Iyer, Arun
- 175-192 A hybrid econometric--neural network modeling approach for sales forecasting
by Luxhoj, James T. & Riis, Jens O. & Stensballe, Brian
- 193-211 Evaluation of corporate environmental management approaches: A framework and application
by Vastag, Gyula & Kerekes, Sandor & Rondinelli, Dennis A.
- 213-226 Component kitting in semi-automated printed circuit board assembly
by Gunther, H. O. & Gronalt, M. & Piller, F.
- 227-237 Corporate control of investments and management styles
by Segelod, Esbjorn
- 239-249 Human-resource-based models of production systems
by Hempel, Paul S.
- 251-258 The practice of production control techniques in the manufacturing sectors in the Eastern Province of Saudi Arabia
by Andijani, A. & Selim, S.
- 259-259 In memoriam: Professor John Leonard Burbidge OBE, 1915-1995
by Grubbstrom, Robert W.
- 261-266 The first step in planning group technology
by Burbidge, John L.
- 267-282 Learning-induced control model to allocate managerial resources for production technology development
by Kim, Bowon
- 283-284 A comment on Martin's: Note on an EOQ model with a temporary sale price
by Goyal, S. K.
- 285-297 The economics of pensions and variable retirement schemes : O. Fabel, Wiley, Chichester, 1994, 224 p., ISBN: 0 471 9 4359 2, [UK pound]65
by Petersen, Jorn Henrik
- 285-297 Public pension economics : B. Felderer (ed.), Springer, Wien, New York, 1993, 218 p., ISBN: 3 211 82432 4; ISBN: 0 387 82432 4, DM150.00
by Petersen, Jorn Henrik
- 285-297 Regulating employment and welfare : F. Naschold and B. Vroom (Eds.), Walter de Gruyter, Berlin, 1994, 494 p., ISBN: 3 11 013513 2, DM198.00/$98.95
by Petersen, Jorn Henrik
- 285-297 Bevolkerungsentwicklung, rentenfinanzierung und einkommenverteilung : R.K. von Weizacker, Springer, Berlin, 1993, 186 p., ISBN: 3 540 56864 6, DM78.00
by Petersen, Jorn Henrik
- 285-297 Pension incentives and job mobility : A.L. Gustman and T.L. Steinmeier, W.E. Upjohn, Kalamazoo, MI, 175 p., ISBN: 088099 152 6, 0 88099 151 8(pbk), $23.00/$13.00
by Petersen, Jorn Henrik
- 285-297 Private pension policies in industrialized countries : J. Turner and N. Watanabe, W.E. Upjohn, Kalamazoo, MI, 170 p., ISBN: 0 88099 150 8 (cloth), 0 88099 149 6 (pbk), $24.00/514.00
by Petersen, Jorn Henrik
May 1996, Volume 43, Issue 1
- 1-9 Aggregate planning with continuous time
by Dobos, Imre
- 11-16 A technical note on using work sampling to estimate the effort on activities under activity-based costing
by Tsai, Wen-Hsien
- 17-28 Performance modeling of multistage production systems operating under hybrid push/pull control
by Pandey, P. C. & Khokhajaikiat, Porntep
- 29-35 Due-date assignment and single machine scheduling with compressible processing times
by Cheng, T. C. E. & Oguz, C. & Qi, X. D.
- 37-46 Improving buyer-seller system cooperation through inventory control
by Li, Susan X. & Huang, Zhimin & Ashley, Allan
- 47-57 Modelling resource supply and demand: Expanding the utility of ABC
by Salafatinos, Chris
- 59-66 Multicriterial production planning by De Novo programming approach
by Babic, Z. & Pavic, I.
- 67-73 Linking profits to Greek bank production management
by Vasiliou, Dimitrios
April 1996, Volume 42, Issue 3
- 205-216 Scheduling with two job classes and setup times to minimize the number of tardy jobs
by Gupta, Jatinder N. D. & Ho, Johnny C.
- 217-227 Single-machine earliness-tardiness scheduling about a common due date with tolerances
by Weng, Michael X. & Ventura, Jose A.
- 229-236 An inventory model for items with demands satisfied from stock or by special deliveries
by Hollier, R. H. & Mak, K. L. & Lam, C. L.
- 237-243 Minimizing a weighted quadratic function of job lateness in the single machine system
by Sen, Tapan & Dileepan, Parthasarati & Lind, Mary R.
- 245-262 A fuzzy decomposition method for multistation production systems subject to blocking
by Tan, Baris & Yeralan, Sencer
- 263-273 Techno-economic evaluation of waste lube oil rerefining
by Ali, Mohammad Farhat & Rahman, Faizur & Hamdan, Abdullah J.
- 275-288 Factors underlying operational JIT purchasing practices: Results of an empirical research
by Nassimbeni, Guido
December 1995, Volume 42, Issue 2
- 101-129 A compendium and comparison of 25 project evaluation techniques. Part 2: Ratio, payback, and accounting methods
by Remer, Donald S. & Nieto, Armando P.
- 131-136 A periodic review inventory model with Markovian supply availability
by Parlar, Mahmut & Wang, Yunzeng & Gerchak, Yigal
- 137-147 Modelling of performance measurement systems in manufacturing enterprises
by Bititci, Umit S.
- 149-160 Inventory policy with time-dependent setup cost
by Matsuyama, Keisuke
- 161-174 An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system
by Hoque, M. A. & Kingsman, B. G.
- 175-185 The impact of a constraint buffer in a flow shop
by Duclos, Leslie K. & Spencer, Michael S.
- 187-199 An integrated manufacturing system design: an applied approach
by Dowlatshahi, S.
November 1995, Volume 42, Issue 1
- 1-15 A heuristic (R, T) periodic review perishable inventory model with lead times
by Chiu, Huan Neng
- 17-27 Optimal inventory and disposal policies in response to a sale
by Chen, Cheng-Kang & Jo Min, K.
- 29-40 Cutting tools versus machine tools investments in FMS design
by Barad, M. & Hoang, K.
- 41-50 Developing a full business environment to support just-in-time logistics
by O'Brien, C. & Head, M.
- 51-66 Information inaccuracy: Implications for economic production scheduling
by Rohleder, Thomas R. & Scudder, Gary D.
- 67-78 Simulation analysis of just-in-time production systems
by Savsar, Mehmet & Al-Jawini, Abdullah
- 79-96 A compendium and comparison of 25 project evaluation techniques. Part 1: Net present value and rate of return methods
by Remer, Donald S. & Nieto, Armando P.
October 1995, Volume 41, Issue 1-3
- 1-14 Modelling production opportunities -- an historical overview
by Grubbstrom, Robert W.
- 15-22 Innovative production structures -- Precondition for a customer-orientated production management
by Bullinger, Hans-Jorg & Fremerey, F. & Fuhrberg-Baumann, J.
- 23-35 Performance measurement and performance management
by Lebas, Michel J.
- 37-43 Lean production
by Warnecke, H. J. & Huser, M.
- 45-50 Design for automated assembly of circular parts: An algorithm
by Abdel-Malek, Layek L.
- 51-58 Variable priority dispatching rules: An analytical approach
by Agliari, Anna & Diligenti, Mauro & Zavanella, Lucio
- 59-70 A multicriteria framework for inventory control
by Agrell, Per J.
- 71-80 A methodology for the vulnerability analysis of just-in-time production systems
by Albino, V. & Garavelli, A. C.
- 81-92 Some cultural/geographical styles in quality strategies and quality costs (P.R. China versus Australia)
by Barad, Miryam
- 93-102 A method for the design of flexible assembly systems
by Bellgran, Monica & Johansson, Christer
- 103-108 Unit load size as a function of the degree of overtaking
by Bengtsson, Johan & Johansson, Mats I.
- 109-114 Case study of productivity and quality aspects in production technology transfer to China
by Bruun, Peter
- 115-125 Design and performance of kitting and order picking systems
by Brynzer, H. & Johansson, M. I.
- 127-133 A managerial perspective on aggregate planning
by Buxey, Geoff
- 135-145 Genetic neuro-scheduler: A new approach for job shop scheduling
by Dagli, C. H. & Sittisathanchai, S.
- 147-160 Measure of manufacturing performance in advanced manufacturing systems
by de Ron, Ad J.
- 161-166 Robotics in automated inspection
by Hedenborn, Per & Bolmsjo, Gunnar
- 167-178 SME financiers' qualitative evaluation criteria in development projects
by Hyvarinen, Liisa
- 179-184 Integrating computer aided quality assurance in flexible engineering and production processes
by Innala, M. & Torvinen, S.
- 185-192 The development of an integration modelling method for manufacturing cell control systems
by Jin, J. Q. & Franks, I. T. & Loftus, M.
- 193-201 Batch-model assembly line balancing: A multiattribute decision making approach
by Kabir, Md. Alamgir & Tabucanon, Mario T.
- 203-209 Workplace design-General view and some special experiences
by Kern, P. & Breining, R. & Eckert, R.
- 211-216 Customer focused lean production development
by Kosonen, K. & Buhanist, P.
- 217-225 Adaptive input control for job-shop type production systems with varying demands using inverse queueing network analysis
by Kuroda, M. & Kawada, A.
- 227-235 Electricity from industrial waste heat using high-speed organic Rankine cycle (ORC)
by Larjola, J.
- 237-239 Buying behavior and product planning
by Leinsdorff, Torben
- 241-248 Actions taken to prevent the propagation of disturbances in manufacturing systems
by Lindau, Roger A. & Lumsden, Kenth R.
- 249-256 Optimal replacement of a tool subject to random failure
by Makis, V.
- 257-266 Design and operational control of an AGV system
by Mantel, Ronald J. & Landeweerd, Henri R. A.
- 267-272 Concepts, practices and expectations of MRP, JIT and OPT in Finland and Japan
by Matsuura, Haruki & Kurosu, Seiji & Lehtimaki, Allan
- 273-280 Application of calculus of variations to a continuous time aggregate production model
by Molinder, Anders
- 281-296 The strategic grounding of competitive advantage -- The case of Scania
by Nilsson, Carl-Henric & Dernroth, Jorgen
- 297-301 Corporate strategy and culture in a conversion process: Adjustment in defence industry
by Nironen, Erkki
- 303-310 Strategies for encouraging and managing technological innovation
by O'Brien, C. & Smith, S. J. E.
- 311-320 Design maturity assessment for concurrent engineering co-ordination
by O'Brien, C. & Smith, S. J. E.
- 321-325 Common order cycle system for multi-item inventory model with learning in ordering and transportation
by Ogawa, Sanae & Ohta, Hiroshi
- 327-333 Activity-based costing and distribution logistics management
by Pirttila, Timo & Hautaniemi, Petri
- 335-341 Manufacturing strategy and capital budgeting process
by Pirttila, Timo & Sandstrom, Jaana
- 343-354 Genetic algorithm for assembly line balancing
by Rubinovitz, J. & Levitin, G.
- 355-368 Cover-Time Planning, a method for calculation of material requirements
by Segerstedt, Anders
- 369-375 Organizational changes related to advanced manufacturing technology in the production area
by Sun, Hongyi & Gertsen, Frank
- 377-385 Designing customer oriented production planning system (COPPS)
by Tamura, Takayoshi & Fujita, Seiichi
- 387-394 Low costs and carbon dioxide emissions through efficient power production methods in Finland
by Tarjanne, R.
- 395-398 A production scheduling system in a hybrid flow shop
by Uetake, Toshifumi & Tsubone, Hitoshi & Ohba, Masaaki
- 399-404 The influence of lead-time reductions on decisions and rules in the production planning process
by Wedel, J. & Lumsden, K.
- 405-410 Sequencing problems in designing energy efficient production systems
by Wolters, W. T. M. & Lambert, A. J. D. & Claus, J.
- 411-418 Design of a decision support system for overseas plant location in the EC
by Yurimoto, Shigeru & Masui, Tadayuki
- 419-427 Quality by a step-by-step program in low scale industries
by Zackrisson, J. & Franzen, M. & Melbin, M. & Shahnavaz, H.
- 429-436 Use of simulation for planning of work organization in highly automated production systems -- Two case studies
by Zulch, Gert & Heitz, Max-Jurgen & Schindele, Hermann
August 1995, Volume 40, Issue 2-3
- 107-120 Managing demand uncertainty through order overplanning
by Bartezzaghi, Emilio & Verganti, Roberto
- 121-152 An empirical study of capital budgeting practices for strategic investments in CIM technologies
by Slagmulder, Regine & Bruggeman, Werner & van Wassenhove, Luk
- 153-161 Estimation of investment costs in fish processing plants
by Montaner, Maria Ines & Gadaleta, Liliana & Parin, Maria Amelia & Zugarramurdi, Aurora
- 163-171 Joint pricing and replenishment policy for deteriorating inventory with declining market
by Wee, Hui-Ming
- 173-184 Travel time models in automated storage/retrieval systems: A critical review
by Sarker, Bhaba R. & Babu, P. Sobhan
- 185-195 Industrial job-shop scheduling with random operations and different priorities
by Golenko-Ginzburg, Dimitri & Kesler, Shmuel & Landsman, Zinoviy
- 197-207 Approximation approach for the performance analysis of production lines under a kanban discipline
by Albino, Vito & Dassisti, Michele & O. Okogbaa, Geoffrey
- 209-218 A multipass optimization strategy for CNC lathe operations
by Yeo, S. H.