Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
December 1996, Volume 46-47, Issue 1
- 55-63 A multilevel decision-making system with multiple resources for controlling cotton harvesting
by Golenko-Ginzburg, Dimitri & Sinuany-Stern, Zilla & Kats, Vladimir
- 65-87 Periodic production scheduling at a fastener manufacturer
by McGee, Victor E. & Pyke, David F.
- 89-108 Managing and reducing total cycle time: models and analysis
by Miltenburg, John & Sparling, David
- 109-118 Modelling production scheduling systems
by Schmidt, Gunter
- 119-125 Parallel machine scheduling with release dates, due dates and family setup times
by Schutten, J. M. J. & Leussink, R. A. M.
- 127-136 Formulas of MRP
by Segerstedt, Anders
- 137-152 Complexity and uncertainty of materials procurement in assembly situations
by van der Vaart, J. T. & de Vries, J. & Wijngaard, J.
- 153-164 Production planning in the case of uncertain individual demand Extension for an MRP II concept
by Zapfel, Gunther
- 165-179 Capacity planning and lead time management
by Zijm, W. H. M. & Buitenhek, R.
- 181-196 Quantifying the relative improvements of redesign strategies in a P.C. supply chain
by Berry, D. & Naim, M. M.
- 197-209 A framework for selecting and introducing appropriate production technology in developing countries
by Bruun, Peter & Mefford, Robert N.
- 211-217 Evaluating designing principles of Japanese production systems
by Frohner, K. -D. & Iwata, K.
- 219-231 Responding to customer enquiries in make-to-order companies Problems and solutions
by Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio
- 233-240 Evaluating manufacturing strategy formulation processess
by Platts, K. W. & Mills, J. F. & Neely, A. D. & Gregory, M. J. & Richards, A. H.
- 241-250 A new method for evaluating worst- and best-case (WBC) economic consequences of technological development
by Schjaer-Jacobsen, Hans
- 251-260 Shaping the organization of order processing with the simulation tool FEMOS
by Zulch, Gert & Grobel, Thomas
- 261-276 Stochastic lot-sizing: Solution and heuristic methods
by Dellaert, N. P. & Melo, M. T.
- 277-284 Global inventory control in an academic hospital
by Dellaert, Nico & van de Poel, Erik
- 285-295 Two replenishment strategies for the lost sales inventory model: A comparison
by van Donselaar, Karel & de Kok, Ton & Rutten, Werner
- 297-309 Safety production plans in MRP-systems using transform methodology
by Grubbstrom, Robert W. & Molinder, Anders
- 311-321 Optimal allocation policies in a two-echelon inventory problem with fixed shipment costs
by Gullu, Refik & Erkip, Nesim
- 323-338 Analysis of order-up-to-S inventory policies under cash flow market value maximization
by Inderfurth, Karl & Schefer, Rainer
- 339-350 An (s, Q) inventory model with remanufacturing and disposal
by van der Laan, Erwin & Dekker, Rommert & Salomon, Marc & Ridder, Ad
- 351-358 Transfer pricing of a service department facing random demand
by Johansen, Soren Glud
- 359-371 Optimal (r, Q) inventory policies with Poisson demands and lost sales: discounted and undiscounted cases
by Johansen, Soren Glud & Thorstenson, Anders
- 373-385 The marking for bucking under uncertainty in automatic harvesting of forests
by Liski, Erkki P. & Nummi, Tapio
- 387-399 Optimization of cyclic manufacturing systems with stochastic manufacturing times using event graphs
by Sauer, Nathalie
- 401-411 A coherent methodology for productivity analysis employing integrated partial efficiency
by Agrell, Per J. & Wikner, Joakim
- 413-421 Input congestion in loan operations
by Hartman, Thomas E. & Storbeck, James E.
- 423-431 Performance measurement system design: Should process based approaches be adopted?
by Neely, Andy & Mills, John & Platts, Ken & Gregory, Mike & Richards, Huw
- 433-439 Choice of metric in the measurement of relative productive efficiency
by Ritchie, P. C. & Rowcroft, J. E.
- 441-457 Product costing in ten Swedish manufacturing companies
by Alnestig, Peter & Segerstedt, Anders
- 459-467 Life-cycle cost analysis of the labor factor
by Dahlen, Per & Bolmsjo, Gunnar S
- 469-476 Cost of free capacity
by Paranko, Jari
- 477-488 An analysis of research on international operations networks
by Boone, Tonya & Johnson, Susan Paul & Sisk, Maia & Whybark, D. Clay
- 489-496 Services provided by manufacturing The Hungarian case
by Chikan, Attila & Demeter, Krisztina
- 497-509 American health care reform: An international perspective
by Roberta Minifie, J. & West, V. L.
- 511-520 An analytical approach to process planning with rework option
by Abdel-Malek, Layek & Asadathorn, Nutthapol
- 521-533 Tool sharing in parallel part production
by Gaalman, G. J. C. & Nawijn, W. M.
- 535-548 Workload control concepts in job shops A critical assessment
by Land, Martin & Gaalman, Gerard
- 549-561 Strategic FMS design under uncertainty: A fuzzy set theory based model
by Perrone, Giovanni & La Diega, Sergio Noto
- 563-573 Guidelines for tool store dimensioning in flexible manufacturing using an analytical technique
by Zavanella, Lucio
- 575-585 What and how about quality function deployment (QFD)
by Govers, C. P. M.
- 587-593 Inspection and correction policies in setting economic product tolerance
by Irianto, Dradjad
- 595-603 Storage location assignment: Using the product structure to reduce order picking times
by Brynzer, H. & Johansson, M. I.
- 605-620 A decision support system for strategic issues management of logistics
by Korpela, Jukka & Tuominen, Markku
- 621-630 Computer-aided packing shop scheduling in a manufacturing plant
by Lagodimos, A. G. & Charalambopoulos, A. & Kavgalaki, A.
August 1996, Volume 45, Issue 1-3
- 1-1 Preface
by Attila Chikan
- 1-7 The volume and structure of inventories
by Chikan, Attila
- 9-19 Inventories cycle in an augmented RBC model
by Collard, Fabrice & Jacques, Jean-Francois
- 21-27 Temporal aggregation and estimation of inventory functions
by Ghali, Moheb
- 29-36 Conditional volatility and the production smoothing hypothesis of inventory investment
by Ginama, Isamu
- 37-46 Has inventory management in the US become more efficient and flexible? A macroeconomic perspective
by Hirsch, Albert A.
- 47-54 Inventory investment in Greek manufacturing industry: Effects from participation in the European market
by Louri, Helen
- 55-64 Macroeconomic implications of S,s versus accelerator finished goods inventory strategies
by Lovell, Michael C.
- 65-75 Financing constraints and reordering rules
by Milne, Alistair
- 77-81 Does the time shape of inventory data hold clues on inventory behaviour
by Reinhardt, Paul & Beyer, Dirk
- 83-90 Heuristic production triggering mechanisms under discrete unequal inventory withdrawals
by Banerjee, Avijit & Burton, Jonathan & Banerjee, Snehamay
- 91-99 Inventory and enterprise integration
by Bonney, M. C. & Head, M. A. & Tien, C. C. & Huang, N. & Barson, R. J.
- 101-109 A visually interactive expert system for a distribution center environment
by Carlson, John G. & Yao, Andrew C.
- 111-119 A conceptual framework for managing congestion in manufacturing
by Gunasekaran, A. & Martikainen, T. & Virtanen, I. & Yli-Olli, P.
- 121-130 Systems design of a two-echelon steel industry supply chain
by Hafeez, K. & Griffiths, M. & Griffiths, J. & Naim, M. M.
- 131-137 A framework for cost-service analysis in differentiation of logistics services
by Pirttila, Timo & Huiskonen, Janne
- 139-146 A comparison of fixed and adaptive type controls for multi-product processing
by Kelle, Peter & Peak, David
- 147-157 Inventories and customer service in Polish manufacturing companies
by Kisperska-Moron, Danuta
- 159-168 Inventory forecasting with a multiple criteria decision tool
by Korpela, Jukka & Tuominen, Markku
- 169-180 A decision aid in warehouse site selection
by Korpela, Jukka & Tuominen, Markku
- 181-186 Information systems design requirements for inventory management: A conceptual approach
by Manthou, Vassiliki & Notopoulos, Panagiotis & Vlachopoulou, Maro
- 187-193 The implementation and use of material requirements planning system in Northern Greece: A case study
by Manthou, Vassiliki & Vlachopoulou, Maro & Theodorou, Petros
- 195-202 Generic organizational choices for logistics in decentralized organizations Implications for inventory management
by Pirttila, Timo & Niemi, Petri
- 203-214 The new management paradigm: An extension through the IFAM perspective
by Nyerges, Richard T.
- 215-222 Import related inventory management in Indian economy
by Prasad, K. N. & A.M. Swaminathan, (Miss) & Parkar, R. G.
- 223-230 A step-wise method for product range management and production control decisions: A case study at a board industry company
by Pirttila, Timo & Sandstrom, Robert
- 231-237 Macroeconomic analyses of inventories: learning from practice
by Sprague, Linda G. & Wacker, John G.
- 239-249 Reducing inventories in a multi-echelon manufacturing firm A case study
by Stenger, Alan J.
- 251-260 Restructuring the bill of material for productivity: A strategic evaluation of product configuration
by Stonebraker, Peter W.
- 261-270 Grain stocking and storing in Benue State: An appraisal of the Federal Government of Nigeria's food grain storage policy
by Chinedu Umeh, J. & Agunwamba, C. C. & Agada, O. A. D.
- 271-278 Positioning inventory in distribution systems
by Whybark, D. Clay & Yang, Shitao
- 279-292 An MCDM framework for dynamic systems
by Agrell, Per J. & Wikner, Joakim
- 293-302 Tracking signals in inventory control systems A simulation study
by Alstrom, Poul & Madsen, Per
- 303-310 Comparison of echelon stock and installation stock policies for two-level inventory systems
by Axsater, Sven & Juntti, Lars
- 311-320 The undershoot of the reorder point: Tests of an approximation
by Baganha, Manuel P. & Pyke, David F. & Ferrer, Geraldo
- 321-327 Investment policy for multiple product setup reduction under budgetary and capacity constraints
by Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae
- 329-336 Stochastic considerations of Grubbstrom--Molinder model of MRP, input-output and multi-echelon inventory systems
by Bogataj, Ludvik & Horvat, Liljana
- 337-342 Inventories in spatial models
by Bogataj, Marija
- 343-352 Variance laws for inventory management
by Boylan, I. E. & Johnston, F. R.
- 353-359 Stability problems in inventory theory
by Bulinskaya, E. V.
- 361-368 Inventory model with two stocks
by Bylka, S. & Komar, J.
- 369-379 Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy
by Diks, E. B. & de Kok, A. G.
- 381-388 Continuous review inventory control when capacity is variable
by Wang, Yunzeng & Gerchak, Yigal
- 389-395 Some comments on normal approximation for stochastic demand processes
by Girlich, Hans-Joachim
- 397-406 Inventory trigger control policies developed in terms of control theory
by Grubbstrom, Robert W. & Wikner, Joakim
- 407-419 Stochastic properties of a production--inventory process with planned production using transform methodology
by Grubbstrom, Robert W.
- 421-427 Batching policies for a product life cycle
by Hill, Roger M.
- 429-433 On queueing models for some multi-location problems
by Kochel, Peter
- 435-441 Fuzzy models for the newsboy problem
by Petrovic, Dobrila & Petrovic, Radivoj & Vujosevic, Mirko
- 443-447 The extended EOQ repair and waste disposal model
by Richter, Knut
- 449-461 A capacity-constrained multi-level inventory and production control problem
by Segerstedt, Anders
- 463-472 Some insights regarding selecting sets of scenarios in combinatorial stochastic problems
by Jonsson, Henrik & Silver, Edward A.
- 473-478 Optimal solution of a total time distribution problem
by Tsouros, C. & Satratzemi, M.
- 479-487 A dynamic game model for distribution problems with non-stochastic uncertainty
by Blanchini, Franco & Rinaldi, Franca & Ukovich, Walter
- 489-498 Product remanufacturing and disposal: A numerical comparison of alternative control strategies
by van der Laan, Erwin & Dekker, Rommert & Salomon, Marc
- 499-504 EOQ formula when inventory cost is fuzzy
by Vujosevic, Mirko & Petrovic, Dobrila & Petrovic, Radivoj
July 1996, Volume 44, Issue 3
- 177-187 Modelling resource supply and demand: Expanding the utility of ABC
by Salafatinos, Chris
- 189-199 The role of logistics in concurrent engineering
by Dowlatshahi, S.
- 201-206 A comment on Standish et al.: The problem with CALS: Barriers to the development of product data exchange and the US continuous acquisition and life-cycle support programme
by Spinardi, Graham & Graham, Ian & Williams, Robin
- 207-224 The payback method of investment appraisal: A review and synthesis
by Lefley, Frank
- 225-237 Efficient heuristic and optimal approaches for n/2/F/[sigma]Ci scheduling problems
by Wang, Chengen & Chu, Chengbin & Proth, Jean-Marie
- 239-248 Inventory models for fast moving spare parts subject to "sudden death" obsolescence
by Cobbaert, Koen & Van Oudheusden, Dirk
- 249-253 Scheduling to minimize the coefficient of variation
by De, Prabuddha & Ghosh, Jay B. & Wells, Charles E.
- 255-265 Discounted costs, obsolescence and planned stockouts with the EOQ formula
by van Delft, Ch. & Vial, J. P.
- 267-275 A two-item newsboy problem with substitutability
by Khouja, Moutaz & Mehrez, Abraham & Rabinowitz, Gad
June 1996, Volume 44, Issue 1-2
- 1-2 In honor of Professor Rintaro Muramatsu
by Salvendy, Gavriel
- 3-5 In memoriam: Professor Rintaro Muramatsu, 1916-1994
by Grubbstrom, Robert W.
- 7-15 Lot scheduling problem for continuous demand
by Seki, Yoichi & Kogure, Keiji
- 17-26 A new concept of job shop scheduling system -- hierarchical decision model
by Tagawa, Shinichi
- 27-33 A study of production management system with MRP
by Nakagiri, Daiju & Kuriyama, Sennosuke
- 35-43 Single machine scheduling using dominance relation to minimize earliness subject to ready and due times
by Asano, Makoto & Ohta, Hiroshi
- 45-51 Fuzzy job shop scheduling
by Kuroda, Mitsuru & Wang, Zeng
- 53-61 Replanning timing in hierarchical production planning
by Tsubone, Hitoshi & Furuta, Hirohisa
- 63-72 On a two-stage hierarchical production planning system for process industries
by Katayama, Hiroshi
- 73-81 The elements and functions of hierarchical scheduling system of order production
by Ichimura, Takaya
- 83-89 Comparing integration strategies in production ordering systems
by Takahashi, Katsuhiko & Soshiroda, Michio
- 91-95 Criterion for choosing ordering policies between fixed-size and fixed-interval, pull-type and push-type
by Hoshino, Kyoji
- 97-103 Hybrid just-in-time logistics systems and information networks for effective management in perishable food industries
by Iijima, M. & Komatsu, S. & Katoh, S.
- 105-117 Comparative analysis of ordering models for an international co-operative global complementary production system
by Hiraki, Shusaku
- 119-128 A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
by Ishii, Kazuyoshi & Imori, Shigeki
- 129-135 Performance of a multistage hybrid push/pull production control system
by Hirakawa, Yasuhiro
- 137-149 Makespan comparison between resequencing and switching in a dynamic manufacturing environment
by Matsuura, Haruki & Kanezashi, Masakazu
- 151-157 An analytical comparison of inventory costs between the pull and the parts-oriented production systems
by Miyazaki, Shigeji
- 159-166 Reserve production capacity in a production inventory system
by Okubo, Bin
- 167-176 Perishable inventory control with two types of customers and different selling prices under the warehouse capacity constraint
by Ishii, Hiroaki & Nose, Toyokazu
June 1996, Volume 43, Issue 2-3
- 79-89 A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
by Franca, Paulo M. & Gendreau, Michel & Laporte, Gilbert & Muller, Felipe M.
- 91-106 A fuzzy pooling of investment cost knowledge
by Dohnal, M. & Fraser, D. M. & Kerkovsky, M.
- 107-113 Due-date assignment and single machine scheduling with compressible processing times
by Cheng, T. C. E. & Oguz, C. & Qi, X. D.
- 115-126 Performance modeling of multistage production systems operating under hybrid push/pull control
by Pandey, P. C. & Khokhajaikiat, Porntep
- 127-137 Batching in production planning for flexible manufacturing systems
by Srivastava, Bharatendu & Chen, Wun-Hwa
- 139-148 An efficient heuristic procedure for the single-item, discrete lot sizing problem
by Canel, Cem & Khumawala, Basheer M. & Law, Japhet S.
- 149-154 Batching policies for linearly increasing demand with a finite input rate
by Hill, Roger M.
- 155-174 What difference does your industry make?
by Hamblin, David & Iyer, Arun
- 175-192 A hybrid econometric--neural network modeling approach for sales forecasting
by Luxhoj, James T. & Riis, Jens O. & Stensballe, Brian
- 193-211 Evaluation of corporate environmental management approaches: A framework and application
by Vastag, Gyula & Kerekes, Sandor & Rondinelli, Dennis A.
- 213-226 Component kitting in semi-automated printed circuit board assembly
by Gunther, H. O. & Gronalt, M. & Piller, F.
- 227-237 Corporate control of investments and management styles
by Segelod, Esbjorn
- 239-249 Human-resource-based models of production systems
by Hempel, Paul S.
- 251-258 The practice of production control techniques in the manufacturing sectors in the Eastern Province of Saudi Arabia
by Andijani, A. & Selim, S.
- 259-259 In memoriam: Professor John Leonard Burbidge OBE, 1915-1995
by Grubbstrom, Robert W.
- 261-266 The first step in planning group technology
by Burbidge, John L.
- 267-282 Learning-induced control model to allocate managerial resources for production technology development
by Kim, Bowon
- 283-284 A comment on Martin's: Note on an EOQ model with a temporary sale price
by Goyal, S. K.
- 285-297 The economics of pensions and variable retirement schemes : O. Fabel, Wiley, Chichester, 1994, 224 p., ISBN: 0 471 9 4359 2, [UK pound]65
by Petersen, Jorn Henrik
- 285-297 Public pension economics : B. Felderer (ed.), Springer, Wien, New York, 1993, 218 p., ISBN: 3 211 82432 4; ISBN: 0 387 82432 4, DM150.00
by Petersen, Jorn Henrik
- 285-297 Regulating employment and welfare : F. Naschold and B. Vroom (Eds.), Walter de Gruyter, Berlin, 1994, 494 p., ISBN: 3 11 013513 2, DM198.00/$98.95
by Petersen, Jorn Henrik
- 285-297 Bevolkerungsentwicklung, rentenfinanzierung und einkommenverteilung : R.K. von Weizacker, Springer, Berlin, 1993, 186 p., ISBN: 3 540 56864 6, DM78.00
by Petersen, Jorn Henrik
- 285-297 Pension incentives and job mobility : A.L. Gustman and T.L. Steinmeier, W.E. Upjohn, Kalamazoo, MI, 175 p., ISBN: 088099 152 6, 0 88099 151 8(pbk), $23.00/$13.00
by Petersen, Jorn Henrik
- 285-297 Private pension policies in industrialized countries : J. Turner and N. Watanabe, W.E. Upjohn, Kalamazoo, MI, 170 p., ISBN: 0 88099 150 8 (cloth), 0 88099 149 6 (pbk), $24.00/514.00
by Petersen, Jorn Henrik
May 1996, Volume 43, Issue 1
- 1-9 Aggregate planning with continuous time
by Dobos, Imre
- 11-16 A technical note on using work sampling to estimate the effort on activities under activity-based costing
by Tsai, Wen-Hsien
- 17-28 Performance modeling of multistage production systems operating under hybrid push/pull control
by Pandey, P. C. & Khokhajaikiat, Porntep
- 29-35 Due-date assignment and single machine scheduling with compressible processing times
by Cheng, T. C. E. & Oguz, C. & Qi, X. D.
- 37-46 Improving buyer-seller system cooperation through inventory control
by Li, Susan X. & Huang, Zhimin & Ashley, Allan
- 47-57 Modelling resource supply and demand: Expanding the utility of ABC
by Salafatinos, Chris
- 59-66 Multicriterial production planning by De Novo programming approach
by Babic, Z. & Pavic, I.
- 67-73 Linking profits to Greek bank production management
by Vasiliou, Dimitrios
April 1996, Volume 42, Issue 3
- 205-216 Scheduling with two job classes and setup times to minimize the number of tardy jobs
by Gupta, Jatinder N. D. & Ho, Johnny C.
- 217-227 Single-machine earliness-tardiness scheduling about a common due date with tolerances
by Weng, Michael X. & Ventura, Jose A.
- 229-236 An inventory model for items with demands satisfied from stock or by special deliveries
by Hollier, R. H. & Mak, K. L. & Lam, C. L.
- 237-243 Minimizing a weighted quadratic function of job lateness in the single machine system
by Sen, Tapan & Dileepan, Parthasarati & Lind, Mary R.
- 245-262 A fuzzy decomposition method for multistation production systems subject to blocking
by Tan, Baris & Yeralan, Sencer
- 263-273 Techno-economic evaluation of waste lube oil rerefining
by Ali, Mohammad Farhat & Rahman, Faizur & Hamdan, Abdullah J.
- 275-288 Factors underlying operational JIT purchasing practices: Results of an empirical research
by Nassimbeni, Guido
December 1995, Volume 42, Issue 2
- 101-129 A compendium and comparison of 25 project evaluation techniques. Part 2: Ratio, payback, and accounting methods
by Remer, Donald S. & Nieto, Armando P.
- 131-136 A periodic review inventory model with Markovian supply availability
by Parlar, Mahmut & Wang, Yunzeng & Gerchak, Yigal
- 137-147 Modelling of performance measurement systems in manufacturing enterprises
by Bititci, Umit S.
- 149-160 Inventory policy with time-dependent setup cost
by Matsuyama, Keisuke
- 161-174 An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system
by Hoque, M. A. & Kingsman, B. G.
- 175-185 The impact of a constraint buffer in a flow shop
by Duclos, Leslie K. & Spencer, Michael S.
- 187-199 An integrated manufacturing system design: an applied approach
by Dowlatshahi, S.
November 1995, Volume 42, Issue 1
- 1-15 A heuristic (R, T) periodic review perishable inventory model with lead times
by Chiu, Huan Neng
- 17-27 Optimal inventory and disposal policies in response to a sale
by Chen, Cheng-Kang & Jo Min, K.
- 29-40 Cutting tools versus machine tools investments in FMS design
by Barad, M. & Hoang, K.
- 41-50 Developing a full business environment to support just-in-time logistics
by O'Brien, C. & Head, M.
- 51-66 Information inaccuracy: Implications for economic production scheduling
by Rohleder, Thomas R. & Scudder, Gary D.
- 67-78 Simulation analysis of just-in-time production systems
by Savsar, Mehmet & Al-Jawini, Abdullah
- 79-96 A compendium and comparison of 25 project evaluation techniques. Part 1: Net present value and rate of return methods
by Remer, Donald S. & Nieto, Armando P.
October 1995, Volume 41, Issue 1-3
- 1-14 Modelling production opportunities -- an historical overview
by Grubbstrom, Robert W.
- 15-22 Innovative production structures -- Precondition for a customer-orientated production management
by Bullinger, Hans-Jorg & Fremerey, F. & Fuhrberg-Baumann, J.
- 23-35 Performance measurement and performance management
by Lebas, Michel J.
- 37-43 Lean production
by Warnecke, H. J. & Huser, M.
- 45-50 Design for automated assembly of circular parts: An algorithm
by Abdel-Malek, Layek L.
- 51-58 Variable priority dispatching rules: An analytical approach
by Agliari, Anna & Diligenti, Mauro & Zavanella, Lucio
- 59-70 A multicriteria framework for inventory control
by Agrell, Per J.
- 71-80 A methodology for the vulnerability analysis of just-in-time production systems
by Albino, V. & Garavelli, A. C.
- 81-92 Some cultural/geographical styles in quality strategies and quality costs (P.R. China versus Australia)
by Barad, Miryam
- 93-102 A method for the design of flexible assembly systems
by Bellgran, Monica & Johansson, Christer
- 103-108 Unit load size as a function of the degree of overtaking
by Bengtsson, Johan & Johansson, Mats I.
- 109-114 Case study of productivity and quality aspects in production technology transfer to China
by Bruun, Peter
- 115-125 Design and performance of kitting and order picking systems
by Brynzer, H. & Johansson, M. I.