Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: R. W. Grubbström
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
March 1999, Volume 59, Issue 1-3
- 387-393 On the suboptimality of (S-1, S) lost sales inventory policies
by Hill, Roger M.
- 395-403 A two-supplier inventory model
by Janssen, Fred & de Kok, Ton
- 405-414 Lot sizing for varying degrees of demand uncertainty
by Johansen, Soren Glud
- 415-423 Segregating space allocation models for container inventories in port container terminals
by Hwan Kim, Kap & Bae Kim, Hong
- 425-433 A routing algorithm for a single straddle carrier to load export containers onto a containership
by Young Kim, Ki & Hwan Kim, Kap
- 435-441 Lead-time variability in a homogeneous queueing model of batching
by Kuik, Roelof & Tielemans, Peter F. J.
- 443-453 Supply chain modelling using fuzzy sets
by Petrovic, Dobrila & Roy, Rajat & Petrovic, Radivoj
- 455-461 On a forward algorithm for a generalized production inventory problem
by Rempala, R.
- 463-467 Analysis of the EOQ repair and waste disposal problem with integer setup numbers
by Richter, Knut & Dobos, Imre
- 469-475 Lot sizes in a capacity constrained facility with available initial inventories
by Segerstedt, Anders
- 477-485 Optimal solutions for stochastic inventory models when the lead-time demand distribution is partially specified
by Shore, Haim
- 487-497 End-of-life service
by Teunter, Ruud H. & Fortuin, Leonard
- 499-510 A simulation framework for forecasting uncertain lumpy demand
by Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio
- 511-518 Deteriorating inventory model with quantity discount, pricing and partial backordering
by Wee, Hui-Ming
- 519-528 Models for warehouse management: Classification and examples
by Berg, J. P. van den & Zijm, W. H. M.
- 529-530 The EOQ with backlogging derived without derivatives
by Grubbstrom, Robert W. & Erdem, Asli
January 1999, Volume 58, Issue 3
- 221-234 Optimal two-stage lot sizing and inventory batching policies
by Kim, DaeSoo
- 235-251 Capital budgeting under uncertainty: An extended goal programming approach
by Kalu, Timothy Ch. U.
- 253-264 A mathematical programming approach to evaluating alternative machine clusters in cellular manufacturing
by Berardi, Victor L. & Zhang, Guoqiang & Felix Offodile, O.
- 265-276 Explaining beer demand: A residual modeling regression approach using statistical process control
by Koksalan, Murat & Erkip, Nesim & Moskowitz, Herbert
- 277-287 Cement transportation planning via fuzzy linear programming
by Shih, Li-Hsing
- 289-301 Application of discrete event simulation to the activity based costing of manufacturing systems
by Spedding, T. A. & Sun, G. Q.
- 303-318 Analysing interaction effects on MRP implementation using ACE
by Sum, Chee-Chuong & Quek, Ser-Aik & Lim, Hoon-Eng
- 319-330 A pragmatic view on process capability studies
by Deleryd, Mats
January 1999, Volume 58, Issue 2
- 115-129 A hierarchical planning system for energy intensive production environments
by Ozdamar, Linet & Birbil, Sevket Ilker
- 131-146 An analysis of the inventory behavior in a q-theoretic framework
by Guariglia, Alessandra
- 147-158 The performance of two popular service measures on management effectiveness in inventory control
by Zhaohui Zeng, Amy & Hayya, Jack C.
- 159-172 Cost and performance analysis of a robotic rework cell
by Geren, Necdet & Redford, Alan
- 173-181 Lot-bucket MRP
by Casimir, Rommert J.
- 183-189 An optimal production run length in deteriorating production processes
by Hyun Kim, Chang & Hong, Yushin
- 191-197 A new line remedial policy for the paced lines with stochastic task times
by Gokcen, Hadi & Faruk Baykoc, O.
- 199-208 Determining safety stocks for production planning in uncertain manufacturing
by Hung, Yi-Feng & Chang, Ching-Bin
- 209-215 JIT production planning approach with fuzzy due date for OKP manufacturing systems
by Wang, Wei & Wang, Dingwei & Ip, W. H.
January 1999, Volume 58, Issue 1
- 1-15 Manufacturing systems with machine vacations, arbitrary topology and finite buffers
by Kavusturucu, Ayse & Gupta, Surendra M.
- 17-29 Statistical dependence in risk analysis for project networks using Monte Carlo methods
by van Dorp, J. R. & Duffey, M. R.
- 31-37 A fuzzy decision model for color reproduction
by Temponi, Cecilia & Derisavi Fard, Farid & Corley, H. W.
- 39-47 An EOQ lot sizing model with random supplier capacity
by Hariga, Moncer & Haouari, Mohamed
- 49-55 Comparison of several heuristics using an analytic procedure for replenishment with non-linear increasing demand
by Yang, J. & Zhao, G. Q. & Rand, G. K.
- 57-61 Consolidating distribution centers can reduce lost sales
by Bordley, Robert & Beltramo, Mark & Blumenfeld, Dennis
- 63-79 Networked manufacturing:: The impact of information sharing
by D'Amours, Sophie & Montreuil, Benoit & Lefrancois, Pierre & Soumis, Francois
- 81-92 An integrated production-distribution model for a multi-national company operating under varying exchange rates
by Mohamed, Zubair M.
- 93-112 A lost-sales continuous-review inventory system with emergency ordering
by Mohebbi, Esmail & Posner, Morton J. M.
September 1998, Volume 56-57, Issue 1
- 1-1 Preface
by Grubbstrom, Robert W. & Hinterhuber, Hans H.
- 1-12 Telemanufacturing: A flexible manufacturing solution
by Abdel-Malek, Layek L. & Wolf, Carl & Guyot, Patrice D.
- 13-19 Optimal production run for processes with constant and random drifts
by Al-Sultan, Khaled S. & Raouf, A.
- 21-27 Costing partial order cycles in the temporary sale price problem
by Arcelus, F. J. & Srinivasan, G.
- 29-35 Ranking of enterprises based on multicriterial analysis
by Babic, Zoran & Plazibat, Neli
- 37-46 A knowledge-based expert system approach for the auditing process of some elements in the quality assurance system
by Bayraktar, Demet
- 47-59 Performance analysis of a flexible manufacturing system: A statistical approach
by D'Angelo, Andrea & Gastaldi, Massimo & Levialdi, Nathan
- 61-68 The break quantity rule's effect on inventory costs in a 1-warehouse, N-retailers distribution system
by Dekker, R. & Kleijn, M. J. & de Kok, A. G.
- 69-77 A spare parts stocking policy based on equipment criticality
by Dekker, R. & Kleijn, M. J. & de Rooij, P. J.
- 79-97 Make-to-order policies for a stochastic lot-sizing problem using overtime
by Dellaert, N. P. & Melo, M. T.
- 99-110 Sustainable production: The ultimate result of a continuous improvement
by de Ron, Ad J.
- 111-122 Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment
by De Smet, Rudi & Gelders, Ludo
- 123-131 Production-inventory control under environmental constraints
by Dobos, Imre
- 133-144 Productivity reconsidered: Critical assessment of investments
by Eloranta, Eero & Holmstrom, Jan
- 145-155 Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study
by Ertay, Tijen
- 157-168 Application of a simulation methodology to the redesign of a logistical control system
by Evans, G. N. & Naim, M. M. & Towill, D. R.
- 169-178 Development of the production using participative simulation games: Two case studies
by Forssen-Nyberg, Minna & Hakamaki, Jussi
- 179-189 Strategic planning for long-distance telecommunications: A symbiotic production system
by Gastaldi, Massimo & Levialdi, Nathan
- 191-197 Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size
by Gerchak, Yigal & Grosfeld-Nir, Abraham
- 199-212 A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming
by Ghodsypour, S. H. & O'Brien, C.
- 213-229 A net present value approach to safety stocks in planned production
by Grubbstrom, Robert W.
- 231-242 Implementation of activity-based costing in manufacturing
by Gunasekaran, A. & Sarhadi, M.
- 243-252 Production planning with multiple objectives in decentralized organizations
by Homburg, Carsten
- 253-260 Sharpening logistics customer service strategy planning by applying Kano's quality element classification
by Huiskonen, Janne & Pirttila, Timo
- 261-273 Price dynamics on the recovered paper market
by Huttunen, Anne & Pirttila, Timo
- 275-289 An inventory model with Poisson demands and emergency orders
by Johansen, Soren Glud & Thorstenson, Anders
- 291-301 An overhaul-replacement model for equipment subject to technological change in an inflation-prone economy
by Karsak, E. Ertugrul & Tolga, Ethem
- 303-318 An analytic hierarchy process-based approach to the strategic management of logistic service: An empirical study in the mechanical forest industry
by Korpela, Jukka & Tuominen, Markku & Valoaho, Matti
- 319-332 Making sense of technology: Towards a synthesis between neoclassical and evolutionary approaches
by Kylaheiko, Kalevi
- 333-345 Embedding the management of evolution into strategic learning
by Laakso, Terho & Kleinhans, Stephane & Smeds, Riitta & Doumeingts, Guy
- 347-364 The performance of workload control concepts in job shops: Improving the release method
by Land, Martin J. & Gaalman, Gerard J. C.
- 365-377 Investigating sensitivity and the impact of information on pricing decisions in an M/M/1/ [infinity] queueing model
by Larsen, Christian
- 379-387 Transport time policy and service level as components in logistics strategy: A case study
by Lehmusvaara, Antti
- 389-396 What prevents companies from improving logistics operations: Some empirical findings
by Lehmusvaara, Antti & Huiskonen, Janne
- 397-405 Strategic networks: The emerging business organization and its impact on production costs
by Levin, Boris M.
- 407-421 Total quality management of a production-maintenance system: A network approach
by Levner, Eugene & Zuckerman, Dror & Meirovich, Gavriel
- 423-432 Strategic moves at the prospect of a deregulated electricity market
by Lindblom, Ted & Andersson, Berndt
- 433-450 Transferring world class production to developing countries: A strategic model
by Mefford, Robert N. & Bruun, Peter
- 451-462 A small business international market selection model
by Minifie, J. Roberta & West, Vicki
- 463-481 A progressive figure-based production planning system for a component manufacturer
by Missbauer, H. & Zapfel, G. & Hauber, W.
- 483-493 Reorganizing for product development: Evidence from Japanese automobile firms
by Muffatto, Moreno
- 495-502 Describing products as executable programs: Variant specification in a customer-oriented environment
by Olsen, Kai A. & Saetre, Per
- 503-509 Subcontract coordination in construction
by Olsson, Richard
- 511-516 A minimax distribution free procedure for mixed inventory model with variable lead time
by Ouyang, Liang-Yuh & Wu, Kun-Shan
- 517-523 Testing manufacturing strategy formulation processes
by Platts, K. W. & Mills, J. F. & Bourne, M. C. & Neely, A. D. & Richards, A. H. & Gregory, M. J
- 525-535 Applicability of statistical process control techniques
by Schippers, Werner A. J.
- 537-546 Case-based reasoning for production scheduling
by Schmidt, Gunter
- 547-556 Hierarchical planning in organizations: Elements of a general theory
by Schneeweiss, Ch.
- 557-574 A methodology for integrating economic criteria in design and production management decisions
by Senechal, O. & Tahon, C.
- 575-585 An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system
by Sianesi, Andrea
- 587-599 The development of a method for determining the efficiency and effectiveness of installed CAPM systems
by Sitoh, P. J. & Braiden, P. M. & Simmons, J. E. L.
- 601-610 Managing capacity in tightly constrained systems
by Sridharan, Sri V.
- 611-619 Exploring the diversity of teams
by Tanskanen, Tiina & Buhanist, Paul & Kostama, Hanna
- 621-640 A cost function of Greek non-ferrous metal industry
by Tsekouras, K. D. & Zagouras, N. G.
- 641-648 Configuration and coordination of virtual production networks
by Tuma, A.
- 649-659 Designing scheduling systems for packaging in process industries: A tobacco company case
by Van Dam, Peter & Gaalman, Gerard J. C. & Sierksma, Gerard
- 661-675 Delivery performance improvement by controlled work-order release and work-center load balancing
by van Ooijen, H. P. G.
- 677-688 A survey of procurement strategy development in industrial companies
by Virolainen, Veli-Matti
- 689-698 Developing material delivery processes in cooperation: An application example of the construction industry
by Wegelius-Lehtonen, Tutu & Pahkala, Samuli
- 699-709 Customer-order-driven production: An economical concept for responding to demand uncertainty?
by Zapfel, Gunther
- 711-722 Simulation of activity costs for the reengineering of production systems
by Zulch, Gert & Brinkmeier, Bernd
August 1998, Volume 55, Issue 3
- 223-240 Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management
by Panizzolo, Roberto
- 241-255 Product costing for complex manufacturing systems
by Boons, Arnick N. A. M.
- 257-271 Optimal continuous review policies for spare part provisioning with random lead times
by Shibuya, Takeshi & Dohi, Tadashi & Osaki, Shunji
- 273-280 Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes
by Jolai Ghazvini, Fariborz & Dupont, Lionel
- 281-294 Supply chain design and analysis:: Models and methods
by Beamon, Benita M.
- 295-307 Advanced manufacturing technology selection:A strategic model for learning and evaluation
by Mohanty, R. P. & Deshmukh, S. G.
- 309-319 The design of quality systems: A contingency approach
by van der Bij, J. D. & Broekhuis, H.
- 321-341 A new pragmatic approach to capital investment appraisal: The financial appraisal profile (FAP) model
by Lefley, Frank & Morgan, Malcolm
July 1998, Volume 55, Issue 2
- 113-119 A quantitative approach to estimate the size of the time buffer in the theory of constraints
by Radovilsky, Zinovy D.
- 121-131 The management and organisational context of new product development: Diagnosis and self-assessment
by McQuater, R. E. & Peters, A. J. & Dale, B. G. & Spring, M. & Rogerson, J. H. & Rooney, E. M.
- 133-142 The impact of parameters setting in load oriented manufacturing control
by Perona, Marco & Portioli, Alberto
- 143-148 A note on the convexity of the objective function for a simple common component inventory problem
by Fu, Haizhen & Fong, Duncan K. H.
- 149-162 A heuristic for network project scheduling with random activity durations depending on the resource allocation
by Golenko-Ginzburg, Dimitri & Gonik, Aharon
- 163-168 Tardiness minimization on parallel machines
by Azizoglu, Meral & Kirca, Omer
- 169-175 A heuristic to minimize a quadratic function of job lateness on a single machine
by Su, Ling-Huey & Chang, Pei-Chann
- 177-189 Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases
by Feyzbakhsh, S. A. & Matsui, M. & Itai, K.
- 191-201 Imperfect maintenance policies for deteriorating production systems
by Sheng-Tsaing Tseng & Ruey Huei Yeh & Wen-Tsung Ho
- 203-212 Simulation modelling and analysis of a JIT production system
by Baykoc, Omer Faruk & Erol, Serpil
- 213-219 One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs
by Guner, Ertan & Erol, Serpil & Tani, Kazuo
June 1998, Volume 55, Issue 1
- 1-20 TQM impact on quality conformance and customer satisfaction: A causal model
by Forza, Cipriano & Filippini, Roberto
- 21-30 An inventory model for deteriorating items with time-proportional demand and shortages under inflation and time discounting
by Chen, Jen-Ming
- 31-38 Demand promotion by upgradation under stock-dependent demand situation - a model
by Datta, T. K. & Paul, K. & Pal, A. K.
- 39-52 Optimal development of production technology when autonomous and induced learning are present
by Kim, Bowon
- 53-56 An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note
by Edwin Cheng, T. C. & Kovalyov, Mikhail Y.
- 57-70 Decision models for single-period products with two ordering opportunities
by Hing-Ling Lau, Amy & Lau, Hon-Shiang
- 71-85 A study on production lines with discrete batch WIP inventory transfer
by Erel, Erdal
- 87-96 Stochastic linear optimisation of an MPMP production planning model
by Akif Bakir, M. & Byrne, Mike D.
- 97-109 Post design modeling for cellular manufacturing system with cost uncertainty
by Shanker, Ravi & Vrat, Prem
May 1998, Volume 54, Issue 3
- 235-245 High performance heuristic algorithm for controlling stochastic network projects
by Golenko-Ginzburg, Dimitri & Gonik, Aharon
- 247-255 Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines
by Chang Sup Sung & Sang Hum Yoon
- 257-266 Simulation study of CONWIP for a cold rolling plant
by Huang, Min & Wang, Dingwei & Ip, W. H.
- 267-276 Inventory investment, product cycles, and the imperfectly competitive firm
by Jones, Philip C. & Moses, Leon N. & Zydiak, James L.
- 277-284 On the applicability of activity based costing as a planning instrument
by Schneeweiss, Ch.
- 285-295 Predictive maintenance: The one-unit replacement model
by Chu, Chengbin & Proth, Jean-Marie & Wolff, Philippe
- 297-305 An approximate method for calculating the mean sojourn time of K-station production lines with no intermediate buffers
by Papadopoulos, H. T.
- 307-320 Computer-aided economic optimization of end-milling operations
by Wang, J.
- 321-332 A genetic algorithm-based planning system for PCB component placement
by Khoo, L. P. & Ng, T. K.
January 1998, Volume 54, Issue 2
- 115-127 A concurrent engineering decision model: Management of the project activities information flows
by Nicoletti, Sergio & Nicolo, Fabio
- 129-141 Using DEA To evaluate 29 Canadian textile companies -- Considering returns to scale
by Chandra, Pankaj & Cooper, William W. & Li, Shanling & Rahman, Atiqur
- 143-161 Manufacturing planning and control practices and their internal correlates: A study of firms in Ghana
by Amoako-Gyampah, Kwasi & Boye, Samuel S.
- 163-171 Computer supported changes in project management
by Karvonen, Sauli
- 173-192 Effects of discounting and demand rate variability on the EOQ
by Klein Haneveld, Willem K. & Teunter, Ruud H.
- 193-206 Investments in modern production technology and the cash flow-oriented EPQ-model
by Hofmann, Christian
- 207-213 A note on the survey of project evaluation techniques in major corporations
by Segelod, Esbjorn
- 215-230 Maximising the benefits per dollar to customers: A new organisational focus
by Samson, Danny & Wacker, John
January 1998, Volume 54, Issue 1
- 1-28 Waiting line model applications in manufacturing
by Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T.
- 29-40 Determination of optimal production rates on a single facility with dependent mold lifespan
by Moon, Dug Hee & Christy, David P.
- 41-55 A compilation of inflation and location indexes
by Remer, Donald S. & Huynh, Leon & Agarwal, Kanishka & Auchard, Brian J. & Heaps-Nelson, Tom
- 57-64 An economic design of variable sampling interval control charts
by Bai, D. S. & Lee, K. T.
- 65-76 Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
by Li, Y. & Ip, W. H. & Wang, D. W.
- 77-86 Optimal pricing for a target profit: Case study on a veterinary diagnostic laboratory
by Kuo, Way & Jain, Gautam
- 87-100 Effects of variability on the due-time performance of a continuous materials flow production system in series
by Tan, Baris
- 101-109 JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs
by Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W.
December 1997, Volume 53, Issue 3
- 227-238 Fuzzy production planning model for fresh tomato packing
by Miller, W. A. & Leung, L. C. & Azhar, T. M. & Sargent, S.
- 239-256 Analysis of cellular and functional manufacturing systems in the presence of machine breakdown
by Logendran, Rasaratnam & Talkington, Diane
- 257-263 A generalised cost-estimation model for job shops
by Aderoba, Adeyemi
- 265-280 An extension of Rahim and Banerjee's model for a process with upper and lower specification limits
by Al-Sultan, K. S. & Al-Fawzan, M. A.
- 281-305 Lot-sizing rules and freezing the master production schedule in material requirements planning systems
by Zhao, Xiande & Lam, Kokin
- 307-321 The impact of process control technology on Turkish chemical industry
by Karaomerlioglu, Dilek Cetindamar
- 323-330 Delivery and trade-offs
by Szwejczewski, Marek & Mapes, John & New, Colin
November 1997, Volume 53, Issue 2
- 119-139 A knowledge-based decision support system for cost estimation and pricing decisions in versatile manufacturing companies
by Kingsman, Brian G. & de Souza, Antonio Artur
- 141-156 Strategic evaluation of advanced manufacturing technology
by Kakati, M.
- 157-170 Production planning and scheduling for injection moulding of pipe fittings A case study
by Nagarur, Nagen & Vrat, Prem & Duongsuwan, Wanchai
- 171-180 An EOQ model with stock-dependent demand, shortage, inflation and time discounting
by Ray, J. & Chaudhuri, K. S.
- 181-190 A heuristic for component switching on SMT placement machines
by Gronalt, M. & Grunow, M. & Gunther, H. O. & Zeller, R.
- 191-207 An empirical study of the relationship between production technology and maintenance management
by Swanson, Laura
- 209-216 An exploration of the impact of TQM and JIT on ISO 9000 registered companies
by Withers, Barbara E. & Ebrahimpour, Maling & Hikmet, Neset
- 217-223 Markov-modulated Poisson processes for multi-location inventory problems
by Ching, Wai Ki
November 1997, Volume 53, Issue 1
- 1-11 The effect of learning and forgetting on the economic manufactured quantity (EMQ) with the consideration of intracycle backorders
by Jaber, Mohamad Y. & Bonney, Maurice
- 13-19 On the cost of using capacity flexibility -- a dynamic programming approach
by Wijngaard, J. & Miltenburg, G. J.
- 21-33 Approaches to risk and uncertainty in the appraisal of new technology capital projects
by Lefley, Frank
- 35-42 Extending the enterprise through multi-level supply control
by van der Vlist, Piet & Hoppenbrouwers, Jurgen J. E. M. & Hegge, Herman M. H.
- 43-55 Integrating manufacturing and management accounting strategy: case study insights
by Tayles, Mike & Walley, Paul
- 57-69 Maintaining optimal inventory level by feedbacks
by Matsuyama, Keisuke
- 71-80 A measurement of the resource utilization efficiency of university libraries
by Chen, Tser-yieth
- 81-90 A deteriorating inventory model with a temporary price discount
by Hui-Ming Wee & Yu, Jonas
- 91-99 Scheduling with bicriteria: total flowtime and number of tardy jobs
by Koksalan Kondakci, Suna & Bekiroglu, Tuncay
- 101-116 Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system
by Daniel, V. & Guide, R. Jr.
October 1997, Volume 52, Issue 3
- 255-255 Editorial
by Agnew, A. & Jones, O.
- 257-268 Automation and organizational performance: The case of electronics manufacturing firms in Singapore
by Wong, Poh-Kam & Ngin, Phyllisis M.
- 269-281 The impact of EDI on interorganizational integration
by Prosser, Alexander & Nickl, Alexander
- 283-290 Physical or virtual team collocation: Does it matter?
by Pawar, Kulwant S. & Sharifi, Sudi
- 291-303 Cellular Green-Teams in global network organisations
by Wright, D. T. & Burns, N. D.
- 305-316 Project management system design: A social and organisational analysis
by Metcalfe, Beverly
- 317-324 Deskilling and reskilling within the labour process: The case of computer integrated manufacturing
by Agnew, Andrew & Forrester, Paul & Hassard, John & Procter, Stephen
October 1997, Volume 52, Issue 1-2
- 1-1 Foreword
by Grubbstrom, Robert W. & R. Nicolin, Curt & Wahlbin, Clas
- 3-3 Opening address on the occasion of the Eighth World Productivity Congress, May 24, 1993
by Carl, H. XVI
- 5-13 What we really need is TPQM!
by Dar-El, Ezey M.
- 15-30 Management for clinicians or the case of bringing the mountain to Mohammed
by Eastman, Creswell J. & Fulop, Liz
- 31-46 Quality in new service development: Key concepts and a frame of reference
by Edvardsson, Bo
- 47-53 A conceptual model for disruption causes: A personnel and organization perspective
by Ericsson, Johan & Dahlen, Per
- 55-71 The effect of a free market price mechanism on total factor productivity: The case of the agricultural crop industry in Greece
by Georganta, Zoe
- 73-82 Productivity and flexibility: Fundamental relations between two major properties and performance measures of the production system
by Grubbstrom, Robert W. & Olhager, Jan
- 83-90 Simultaneous engineering -- correlates of success
by Hauck, Warren C. & Anil Bansal P. E. & Hauck, Allan J.
- 91-103 Automatic data capture and its impact on productivity
by Lindau, Roger A.