A dynamic game model for distribution problems with non-stochastic uncertainty
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Willard I. Zangwill, 1969. "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System--A Network Approach," Management Science, INFORMS, vol. 15(9), pages 506-527, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Baita, Flavio & Ukovich, Walter & Pesenti, Raffaele & Favaretto, Daniela, 1998. "Dynamic routing-and-inventory problems: a review," Transportation Research Part A: Policy and Practice, Elsevier, vol. 32(8), pages 585-598, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
- S. Selcuk Erenguc, 1988. "Multiproduct dynamic lot‐sizing model with coordinated replenishments," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(1), pages 1-22, February.
- Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
- Tempelmeier, Horst, 2007. "On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints," European Journal of Operational Research, Elsevier, vol. 181(1), pages 184-194, August.
- Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
- Kajjoune, Oussama & Aouam, Tarik & Zouadi, Tarik & Ranjan, Ravi Prakash, 2023. "Dynamic lot-sizing in a two-stage supply chain with liquidity constraints and financing options," International Journal of Production Economics, Elsevier, vol. 258(C).
- Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2019.
"Two-echelon lot-sizing with asymmetric information and continuous type space,"
Omega, Elsevier, vol. 87(C), pages 158-176.
- Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2018. "Two-Echelon Lot-Sizing with Asymmetric Information and Continuous Type Space," Econometric Institute Research Papers EI2018-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
- Romeijn, H.E. & van den Heuvel, W.J. & Geunes, J., 2012. "Mitigating the Cost of Anarchy in Supply Chain Systems," Econometric Institute Research Papers EI 2012-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
- Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
- V S Tonaki & F M B Toledo, 2010. "An approach for solving the lot-sizing problem of a market-driven foundry," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 108-114, January.
- Luis A. Guardiola & Ana Meca & Justo Puerto, 2022. "The effect of consolidated periods in heterogeneous lot-sizing games," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 30(2), pages 380-404, July.
- Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
- Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.
- Yale T. Herer & Michal Tzur, 2001. "The dynamic transshipment problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 386-408, August.
- Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
- Luis A. Guardiola & Ana Meca & Justo Puerto, 2021. "Unitary Owen Points in Cooperative Lot-Sizing Models with Backlogging," Mathematics, MDPI, vol. 9(8), pages 1-19, April.
- Azaron, Amir & Tang, Ou & Tavakkoli-Moghaddam, Reza, 2009. "Dynamic lot sizing problem with continuous-time Markovian production cost," International Journal of Production Economics, Elsevier, vol. 120(2), pages 607-612, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:479-487. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.