A method for the design of flexible assembly systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- אסתר טולידנו, 1993. "מקבלי דמי אבטלה בשנת 1992," Working Papers 475, National Insurance Institute of Israel.
- שרית בייץ מוראי & תמר הרון ורבקה ורטמן, 1993. "ביצוע חוק סיעוד במרכזי יום," Working Papers 456, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Battini, Daria & Faccio, Maurizio & Persona, Alessandro & Sgarbossa, Fabio, 2009. "Design of the optimal feeding policy in an assembly system," International Journal of Production Economics, Elsevier, vol. 121(1), pages 233-254, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Vastag, Gyula & Montabon, Frank, 2001. "Linkages among manufacturing concepts, inventories, delivery service and competitiveness," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 195-204, May.
- Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
- Bo, Hong, 2001. "Volatility of sales, expectation errors, and inventory investment: Firm level evidence," International Journal of Production Economics, Elsevier, vol. 72(3), pages 273-283, August.
- Tarantilis, C. D. & Kiranoudis, C. T., 2002. "A list-based threshold accepting method for job shop scheduling problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 159-171, May.
- Kengpol, Athakorn & O'Brien, Christopher, 2001. "The development of a decision support tool for the selection of advanced technology to achieve rapid product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 177-191, January.
- Pennings, Enrico & Natter, Martin, 2001. "Strategic diversification and capacity utilization," International Journal of Production Economics, Elsevier, vol. 72(3), pages 261-272, August.
- Baker, Rose D., 2000. "Calculating the expected failure rate of complex equipment subject to hazardous repair," International Journal of Production Economics, Elsevier, vol. 67(1), pages 53-61, August.
- Zulch, Gert & Braun, Wolfgang J. & Schiller, Emmerich F., 1997. "Analytical approach of determining job division in manual assembly systems," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 123-134, August.
- Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
- Ki Ching, Wai, 2001. "Machine repairing models for production systems," International Journal of Production Economics, Elsevier, vol. 70(3), pages 257-266, April.
- Puig-Junoy, Jaume, 2000. "Partitioning input cost efficiency into its allocative and technical components: an empirical DEA application to hospitals," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 199-218, September.
- Raab, Raymond & Kotamraju, Pradeep & Haag, Stephen, 2000. "Efficient provision of child quality of life in less developed countries: conventional development indexes versus a programming approach to development indexes," Socio-Economic Planning Sciences, Elsevier, vol. 34(1), pages 51-67, March.
- Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
- Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
- Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo, 2001. "Optimal multiple delivery schedule for demand in logistic model," International Journal of Production Economics, Elsevier, vol. 73(3), pages 241-249, October.
- Kim, Soung-Hie & Jang, Ki-Jin, 2002. "Designing performance analysis and IDEF0 for enterprise modelling in BPR," International Journal of Production Economics, Elsevier, vol. 76(2), pages 121-133, March.
- Hung, Yi-Feng & Chang, Ching-Bin, 1999. "Determining safety stocks for production planning in uncertain manufacturing," International Journal of Production Economics, Elsevier, vol. 58(2), pages 199-208, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:93-102. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.