IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v46-47y1996i1p219-231.html
   My bibliography  Save this article

Responding to customer enquiries in make-to-order companies Problems and solutions

Author

Listed:
  • Kingsman, Brian
  • Hendry, Linda
  • Mercer, Alan
  • de Souza, Antonio

Abstract

No abstract is available for this item.

Suggested Citation

  • Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio, 1996. "Responding to customer enquiries in make-to-order companies Problems and solutions," International Journal of Production Economics, Elsevier, vol. 46(1), pages 219-231, December.
  • Handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:219-231
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00199-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kingsman, B. G. & Tatsiopoulos, I. P. & Hendry, L. C., 1989. "A structural methodology for managing manufacturing lead times in make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(2), pages 196-209, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    2. repec:dgr:rugsom:02a49 is not listed on IDEAS
    3. Linda Zhang & Carman K.M. Lee & Pervaiz Akhtar, 2020. "Towards customization: Evaluation of integrated sales, product, and production configuration," Post-Print hal-03276827, HAL.
    4. Zhang, Linda L. & Lee, Carman K.M. & Akhtar, Pervaiz, 2020. "Towards customization: Evaluation of integrated sales, product, and production configuration," International Journal of Production Economics, Elsevier, vol. 229(C).
    5. Soman, Chetan Anil & Donk, Dirk Pieter van & Gaalman, Gerard, 2002. "Combined make-to-order and make-to-stock in a food production system," Research Report 02A49, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    6. Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
    7. Gosling, Jonathan & Naim, Mohamed M., 2009. "Engineer-to-order supply chain management: A literature review and research agenda," International Journal of Production Economics, Elsevier, vol. 122(2), pages 741-754, December.
    8. Cakravastia, Andi & Toha, Isa S. & Nakamura, Nobuto, 2002. "A two-stage model for the design of supply chain networks," International Journal of Production Economics, Elsevier, vol. 80(3), pages 231-248, December.
    9. Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
    10. Mile Katic & Renu Agarwal, 2018. "The Flexibility Paradox: Achieving Ambidexterity in High-Variety, Low-Volume Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(1), pages 69-86, March.
    11. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
    12. Zorzini, Marta & Stevenson, Mark & Hendry, Linda C., 2012. "Customer Enquiry Management in global supply chains: A comparative multi-case study analysis," European Management Journal, Elsevier, vol. 30(2), pages 121-140.
    13. Federica Costa & Kaustav Kundu & Matteo Rossini & Alberto Portioli-Staudacher, 2023. "Comparative study of bottleneck-based release models and load-based ones in a hybrid MTO-MTS flow shop: an assessment by simulation," Operations Management Research, Springer, vol. 16(1), pages 33-48, March.
    14. Afshin Mansouri, S. & Gallear, David & Askariazad, Mohammad H., 2012. "Decision support for build-to-order supply chain management through multiobjective optimization," International Journal of Production Economics, Elsevier, vol. 135(1), pages 24-36.
    15. Caputo, Antonio C. & Pelagagge, Pacifico M., 2008. "Parametric and neural methods for cost estimation of process vessels," International Journal of Production Economics, Elsevier, vol. 112(2), pages 934-954, April.
    16. Soepenberg, G.D. & Land, Martin & Gaalman, Gerard, 2008. "The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies," International Journal of Production Economics, Elsevier, vol. 112(1), pages 495-503, March.
    17. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    18. Birutė Mikulskienė & Julija Moskvina, 2020. "Peculiar properties of the pricing process in customized furniture manufacturing enterprises," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 19(6), pages 411-420, December.
    19. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
    20. Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
    21. Xiong, M.H. & Tor, S.B. & Bhatnagar, Rohit & Khoo, L.P. & Venkat, S., 2006. "A DSS approach to managing customer enquiries for SMEs at the customer enquiry stage," International Journal of Production Economics, Elsevier, vol. 103(1), pages 332-346, September.
    22. Cheng, Chi-Bin, 2011. "Reverse auction with buyer-supplier negotiation using bi-level distributed programming," European Journal of Operational Research, Elsevier, vol. 211(3), pages 601-611, June.
    23. Yumin He & Kathryn E. Stecke & Milton L. Smith, 2016. "Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6736-6746, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    2. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    3. Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.
    4. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    5. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    6. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    7. Zhai, Yue & Cheng, T.C.E., 2022. "Lead-time quotation and hedging coordination in make-to-order supply chain," European Journal of Operational Research, Elsevier, vol. 300(2), pages 449-460.
    8. Oosterman, Bas & Land, Martin, 1998. "The influence of shop characteristics on workload control," Research Report 98A28, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    9. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
    10. Watanapa, Bunthit & Techanitisawad, Anulark, 2005. "Simultaneous price and due date settings for multiple customer classes," European Journal of Operational Research, Elsevier, vol. 166(2), pages 351-368, October.
    11. Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
    12. Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
    13. repec:dgr:rugsom:95a42 is not listed on IDEAS
    14. Land, Martin J. & Gaalman, Gerard J.C., 1995. "Workload control concepts in job shops: a critical assessment," Research Report 95A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    15. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    16. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    17. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    18. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    19. Ebadian, M. & Rabbani, M. & Jolai, F. & Torabi, S.A. & Tavakkoli-Moghaddam, R., 2008. "A new decision-making structure for the order entry stage in make-to-order environments," International Journal of Production Economics, Elsevier, vol. 111(2), pages 351-367, February.
    20. repec:dgr:rugsom:98a28 is not listed on IDEAS
    21. Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
    22. Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:219-231. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.