Workload control concepts in job shops A critical assessment
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Lawrence M. Wein & Philippe B. Chevalier, 1992. "A Broader View of the Job-Shop Scheduling Problem," Management Science, INFORMS, vol. 38(7), pages 1018-1033, July.
- Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
- S. S. Panwalkar & Wafik Iskander, 1977. "A Survey of Scheduling Rules," Operations Research, INFORMS, vol. 25(1), pages 45-61, February.
- Lawrence M. Wein, 1992. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Network with Controllable Inputs," Operations Research, INFORMS, vol. 40(3-supplem), pages 312-334, June.
- Tatsiopoulos, I. P. & Kingsman, B. G., 1983. "Lead time management," European Journal of Operational Research, Elsevier, vol. 14(4), pages 351-358, December.
- Ramasesh, R, 1990. "Dynamic job shop scheduling: A survey of simulation research," Omega, Elsevier, vol. 18(1), pages 43-57.
- Zapfel, G. & Missbauer, H., 1993. "Production Planning and Control (PPC) systems including load-oriented order release -- Problems and research perspectives," International Journal of Production Economics, Elsevier, vol. 30(1), pages 107-122, July.
- Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
- Lawrence M. Wein, 1990. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs," Operations Research, INFORMS, vol. 38(6), pages 1065-1078, December.
- Kingsman, B. G. & Tatsiopoulos, I. P. & Hendry, L. C., 1989. "A structural methodology for managing manufacturing lead times in make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(2), pages 196-209, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- repec:dgr:rugsom:95a42 is not listed on IDEAS
- Land, Martin J. & Gaalman, Gerard J.C., 1995. "Workload control concepts in job shops: a critical assessment," Research Report 95A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
- Bonfatti, M. & Caridi, M. & Schiavina, L., 2006. "A fuzzy model for load-oriented manufacturing control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 502-513, December.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
- Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
- Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
- Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
- Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
- Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
- Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
- Tanja Mlinar & Philippe Chevalier, 2016.
"Pooling heterogeneous products for manufacturing environments,"
4OR, Springer, vol. 14(2), pages 173-200, June.
- MLINAR, Tanja & CHEVALIER, Philippe, 2016. "Pooling Heterogeneous Products for Manufacturing Environments," LIDAM Reprints CORE 2744, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
- Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
- Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.
- Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
- Branke, Juergen & Pickardt, Christoph W., 2011. "Evolutionary search for difficult problem instances to support the design of job shop dispatching rules," European Journal of Operational Research, Elsevier, vol. 212(1), pages 22-32, July.
- Vinod, V. & Sridharan, R., 2011. "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 127-146, January.
- Reményi, Christoph & Staudacher, Stephan, 2014. "Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 94-107.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:535-548. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.