IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v42y1995i2p161-174.html
   My bibliography  Save this article

An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system

Author

Listed:
  • Hoque, M. A.
  • Kingsman, B. G.

Abstract

No abstract is available for this item.

Suggested Citation

  • Hoque, M. A. & Kingsman, B. G., 1995. "An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system," International Journal of Production Economics, Elsevier, vol. 42(2), pages 161-174, December.
  • Handle: RePEc:eee:proeco:v:42:y:1995:i:2:p:161-174
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00188-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Narro Lopez, Miguel A. & Kingsman, Brian G., 1991. "The economic lot scheduling problem: theory and practice," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 147-164, October.
    2. Iftekhar A. Karimi, 1992. "Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs," Management Science, INFORMS, vol. 38(10), pages 1467-1481, October.
    3. Szendrovits, Andrew Z & Drezner, ZVI, 1980. "Optimizing multi-stage production with constant lot size and varying numbers of batches," Omega, Elsevier, vol. 8(6), pages 623-629.
    4. Goyal, S. K. & Szendrovits, A. Z., 1986. "A constant lot size model with equal and unequal sized batch shipments between production stages," Engineering Costs and Production Economics, Elsevier, vol. 10(3), pages 203-210, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
    2. Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
    3. Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
    4. Hoque, M.A. & Kingsman, B.G., 2006. "Synchronization in common cycle lot size scheduling for a multi-product serial supply chain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 316-331, September.
    5. Hoque, M. A. & Goyal, S. K., 2005. "On lot streaming in multistage production systems," International Journal of Production Economics, Elsevier, vol. 95(2), pages 195-202, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hoque, M.A. & Kingsman, B.G., 2006. "Synchronization in common cycle lot size scheduling for a multi-product serial supply chain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 316-331, September.
    2. Bogaschewsky, Ronald W. & Buscher, Udo D. & Lindner, Gerd, 2001. "Optimizing multi-stage production with constant lot size and varying number of unequal sized batches," Omega, Elsevier, vol. 29(2), pages 183-191, April.
    3. Hsiao, Yu-Cheng & Lin, Yi & Huang, Yun-Kuei, 2010. "Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 408-413, April.
    4. Kim, DaeSoo, 1999. "Optimal two-stage lot sizing and inventory batching policies," International Journal of Production Economics, Elsevier, vol. 58(3), pages 221-234, January.
    5. Wen-Tsung Ho & Jason Chao-Hsien Pan & Yu-Cheng Hsiao, 2012. "Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments," Journal of Optimization Theory and Applications, Springer, vol. 153(2), pages 513-531, May.
    6. Hsiao, Yu-Cheng, 2008. "Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information," International Journal of Production Economics, Elsevier, vol. 115(1), pages 229-235, September.
    7. Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
    8. Wen-Tsung Ho & Yu-Cheng Hsiao, 2014. "Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System," Journal of Optimization Theory and Applications, Springer, vol. 161(2), pages 648-663, May.
    9. Hoai Le Thi & Duc Tran, 2014. "Optimizing a multi-stage production/inventory system by DC programming based approaches," Computational Optimization and Applications, Springer, vol. 57(2), pages 441-468, March.
    10. Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
    11. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
    12. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
    13. Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
    14. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
    15. Kirschstein, Thomas, 2018. "Planning of multi-product pipelines by economic lot scheduling models," European Journal of Operational Research, Elsevier, vol. 264(1), pages 327-339.
    16. G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
    17. Zhou, Yong-Wu & Wang, Sheng-Dong, 2007. "Optimal production and shipment models for a single-vendor-single-buyer integrated system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 309-328, July.
    18. Hoque, M. A. & Goyal, S. K., 2005. "On lot streaming in multistage production systems," International Journal of Production Economics, Elsevier, vol. 95(2), pages 195-202, February.
    19. Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
    20. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:42:y:1995:i:2:p:161-174. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.