IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v44y1996i1-2p7-15.html
   My bibliography  Save this article

Lot scheduling problem for continuous demand

Author

Listed:
  • Seki, Yoichi
  • Kogure, Keiji

Abstract

No abstract is available for this item.

Suggested Citation

  • Seki, Yoichi & Kogure, Keiji, 1996. "Lot scheduling problem for continuous demand," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 7-15, June.
  • Handle: RePEc:eee:proeco:v:44:y:1996:i:1-2:p:7-15
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00087-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Christian M. Delporte & L. Joseph Thomas, 1977. "Lot Sizing and Sequencing for N Products on One Facility," Management Science, INFORMS, vol. 23(10), pages 1070-1079, June.
    2. Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
    3. Fayez Fouad Boctor, 1982. "The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem," Management Science, INFORMS, vol. 28(7), pages 798-807, July.
    4. Glass, Celia A., 1994. "Feasibility of scheduling lot sizes of two frequencies on one machine," European Journal of Operational Research, Elsevier, vol. 75(2), pages 354-364, June.
    5. Thom J. Hodgson, 1972. "An Analytical Model of a Two-Product, One-Machine, Production-Inventory System," Management Science, INFORMS, vol. 19(4-Part-1), pages 391-405, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Other publications TiSEM 533d6bbb-e61a-4e4b-a44e-1, Tilburg University, School of Economics and Management.
    2. Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Research Memorandum FEW 544, Tilburg University, School of Economics and Management.
    3. Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
    4. P. C. Geng & R. G. Vickson, 1988. "Two heuristics for the economic lot scheduling problem: An experimental study," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(4), pages 605-617, August.
    5. Goncalves, JoseF. & Leachman, Robert C., 1998. "A hybrid heuristic and linear programming approach to multi-product machine scheduling," European Journal of Operational Research, Elsevier, vol. 110(3), pages 548-563, November.
    6. Archibald, Thomas W. & Bokkers, Menno B. & Dekker, Rommert & Vliet, Andre van, 1999. "Minimising bins in transmission systems," European Journal of Operational Research, Elsevier, vol. 115(2), pages 380-391, June.
    7. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
    8. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    9. Nascimento, Mariá C.V. & Resende, Mauricio G.C. & Toledo, Franklina M.B., 2010. "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal of Operational Research, Elsevier, vol. 200(3), pages 747-754, February.
    10. Gaetan Belvaux & Laurence A. Wolsey, 2000. "bc --- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems," Management Science, INFORMS, vol. 46(5), pages 724-738, May.
    11. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    12. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    13. Micha Kahlen & Karsten Schroer & Wolfgang Ketter & Alok Gupta, 2024. "Smart Markets for Real-Time Allocation of Multiproduct Resources: The Case of Shared Electric Vehicles," Information Systems Research, INFORMS, vol. 35(2), pages 871-889, June.
    14. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    15. Yves Pochet & Mathieu Van Vyve, 2004. "A General Heuristic for Production Planning Problems," INFORMS Journal on Computing, INFORMS, vol. 16(3), pages 316-327, August.
    16. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    17. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
    18. Yunxia Zhu & Milind Dawande & Chelliah Sriskandarajah, 2011. "Value of Local Cash Reuse: Inventory Models for Medium-Size Depository Institutions Under the New Federal Reserve Policy," Manufacturing & Service Operations Management, INFORMS, vol. 13(4), pages 508-524, October.
    19. Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
    20. Doostmohammadi, Mahdi & Akartunalı, Kerem, 2018. "Valid inequalities for two-period relaxations of big-bucket lot-sizing problems: Zero setup case," European Journal of Operational Research, Elsevier, vol. 267(1), pages 86-95.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:44:y:1996:i:1-2:p:7-15. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.