IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v46-47y1996i1p127-136.html
   My bibliography  Save this article

Formulas of MRP

Author

Listed:
  • Segerstedt, Anders

Abstract

No abstract is available for this item.

Suggested Citation

  • Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
  • Handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:127-136
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00163-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    2. Andrew Vazsonyi, 1955. "The Use of Mathematics in Production and Inventory Control--II (Theory of Scheduling)," Management Science, INFORMS, vol. 1(3-4), pages 207-223, 04-07.
    3. Grubbstrom, Robert W & Molinder, Anders, 1994. "Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory systems," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 299-311, June.
    4. V. Sridharan & William L. Berry & V. Udayabhanu, 1987. "Freezing the Master Production Schedule Under Rolling Planning Horizons," Management Science, INFORMS, vol. 33(9), pages 1137-1149, September.
    5. Grubbstrom, Robert W. & Ovrin, Peter, 1992. "Intertemporal generalization of the relationship between material requirements planning and input-output analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 311-318, February.
    6. Robin Roundy, 1986. "A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System," Mathematics of Operations Research, INFORMS, vol. 11(4), pages 699-727, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Hui & Gong, Qiguo & Wang, Shouyang, 2017. "Information processing structures and decision making delays in MRP and JIT," International Journal of Production Economics, Elsevier, vol. 188(C), pages 41-49.
    2. Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.
    3. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
    4. Gong, Qiguo & Yang, Yuru & Wang, Shouyang, 2014. "Information and decision-making delays in MRP, KANBAN, and CONWIP," International Journal of Production Economics, Elsevier, vol. 156(C), pages 208-213.
    5. Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Grubbstrom, Robert W., 1995. "Modelling production opportunities -- an historical overview," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 1-14, October.
    2. Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.
    3. Bogataj, Ludvik & Horvat, Liljana, 1996. "Stochastic considerations of Grubbstrom--Molinder model of MRP, input-output and multi-echelon inventory systems," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 329-336, August.
    4. Grubbstrom, Robert W., 1998. "A net present value approach to safety stocks in planned production," International Journal of Production Economics, Elsevier, vol. 56(1), pages 213-229, September.
    5. Grubbstrom, Robert W., 1999. "A net present value approach to safety stocks in a multi-level MRP system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 361-375, March.
    6. Grubbstrom, Robert W. & Molinder, Anders, 1996. "Safety production plans in MRP-systems using transform methodology," International Journal of Production Economics, Elsevier, vol. 46(1), pages 297-309, December.
    7. Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Reprint of “Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 113-125.
    8. Grubbstrom, Robert W., 1996. "Stochastic properties of a production--inventory process with planned production using transform methodology," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 407-419, August.
    9. Grubbström, Robert W. & Tang, Ou, 2012. "The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 765-777.
    10. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
    11. Horvat, Liljana & Bogataj, Ludvik, 1999. "A market game with the characteristic function according to the MRP and input-output analysis model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 281-288, March.
    12. Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model," International Journal of Production Economics, Elsevier, vol. 193(C), pages 51-62.
    13. Boissiere, J. & Frein, Y. & Rapine, C., 2008. "Optimal stationary policies in a 3-stage serial production-distribution logistic chain facing constant and continuous demand," European Journal of Operational Research, Elsevier, vol. 186(2), pages 608-619, April.
    14. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    15. Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
    16. J. F. Chen & W. E. Wilhelm, 1994. "Optimizing the allocation of components to kits in small‐lot, multiechelon assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(2), pages 229-256, March.
    17. J. Drechsel & A. Kimms, 2010. "The subcoalition-perfect core of cooperative games," Annals of Operations Research, Springer, vol. 181(1), pages 591-601, December.
    18. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    19. Bogataj, Ludvik & Bogataj, Marija, 2007. "The study of optimal additional investments in capacities for reduction of delays in value chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 281-290, July.
    20. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:127-136. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.