IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v45y1996i1-3p321-327.html
   My bibliography  Save this article

Investment policy for multiple product setup reduction under budgetary and capacity constraints

Author

Listed:
  • Banerjee, Avijit
  • Pyreddy, Vijay R.
  • Kim, Seung Lae

Abstract

No abstract is available for this item.

Suggested Citation

  • Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
  • Handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:321-327
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00122-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    2. Gregory Dobson, 1987. "The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes," Operations Research, INFORMS, vol. 35(5), pages 764-771, October.
    3. Willard I. Zangwill, 1987. "From EOQ Towards ZI," Management Science, INFORMS, vol. 33(10), pages 1209-1223, October.
    4. Samuel G. Davis, 1990. "Scheduling Economic Lot Size Production Runs," Management Science, INFORMS, vol. 36(8), pages 985-998, August.
    5. C. Loren Doll & D. Clay Whybark, 1973. "An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem," Management Science, INFORMS, vol. 20(1), pages 50-55, September.
    6. Wen-Lian Hsu, 1983. "On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine," Management Science, INFORMS, vol. 29(1), pages 93-105, January.
    7. P. C. Geng & R. G. Vickson, 1988. "Two heuristics for the economic lot scheduling problem: An experimental study," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(4), pages 605-617, August.
    8. Earl E. Bomberger, 1966. "A Dynamic Programming Approach to a Lot Size Scheduling Problem," Management Science, INFORMS, vol. 12(11), pages 778-784, July.
    9. Anne M. Spence & Evan L. Porteus, 1987. "Setup Reduction and Increased Effective Capacity," Management Science, INFORMS, vol. 33(10), pages 1291-1301, October.
    10. HSU, Wen-Lian, 1983. "On the general feasibility test of scheduling lot sizes for several products on one machine," LIDAM Reprints CORE 515, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
    2. Hsu, P.H. & Wee, H.M. & Teng, H.M., 2010. "Preservation technology investment for deteriorating inventory," International Journal of Production Economics, Elsevier, vol. 124(2), pages 388-394, April.
    3. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
    4. Diaby, Moustapha, 2000. "Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments," International Journal of Production Economics, Elsevier, vol. 67(3), pages 219-233, October.
    5. Giri, B. C. & Moon, I., 2004. "Note on an economic lot scheduling problem under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 91(3), pages 229-234, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
    2. Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
    3. Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
    4. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
    5. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
    6. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    7. Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    8. Grznar, J. & Riggle, C., 1997. "An optimal algorithm for the basic period approach to the economic lot scheduling problem," Omega, Elsevier, vol. 25(3), pages 355-364, June.
    9. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
    10. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
    11. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
    12. Mohammadi, Maryam & Musa, Siti Nurmaya & Bahreininejad, Ardeshir, 2015. "Optimization of economic lot scheduling problem with backordering and shelf-life considerations using calibrated metaheuristic algorithms," Applied Mathematics and Computation, Elsevier, vol. 251(C), pages 404-422.
    13. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
    14. Daniel Adelman & Christiane Barz, 2014. "A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem," Mathematics of Operations Research, INFORMS, vol. 39(2), pages 374-402, May.
    15. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    16. Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
    17. Beck, Fabian G. & Biel, Konstantin & Glock, Christoph H., 2019. "Integration of energy aspects into the economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 209(C), pages 399-410.
    18. Koulamas, Christos P., 1995. "Simultaneous determination of the cutting speed and lot size values in machining systems," European Journal of Operational Research, Elsevier, vol. 84(2), pages 356-370, July.
    19. Robert R. Inman & Philip C. Jones & Guillermo M. Gallego, 1991. "Economic lot scheduling of fully loaded processes with external setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 699-713, October.
    20. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:321-327. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.