Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
June 1994, Volume 35, Issue 1-3
- 271-275 Multi-echelon inventory theory -- A retrospective
by Clark, Andrew J.
- 277-284 Initial order quantities in multistage serial production systems
by Ding, Huiping
- 285-292 Multi-item inventory systems with joint ordering and transportation decisions
by Van Eijs, M. J. G.
- 293-297 Criticality analysis of spare parts using the analytic hierarchy process
by Gajpal, Prem Prakash & Ganesh, L. S. & Rajendran, Chandrasekharan
- 299-311 Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory systems
by Grubbstrom, Robert W & Molinder, Anders
- 313-319 Continuous review lost sales inventory models where two orders may be outstanding
by Hill, Roger M.
- 321-329 Safety stocks in multistage divergent inventory systems: A survey
by Inderfurth, Karl
- 331-335 A decision-making policy for capital investment concerning the size of a production unit
by Kalfakakou, Ria
- 337-342 Economic lot scheduling heuristic for random demands
by Kelle, P. & Clendenen, G. & Dardeau, P.
- 343-349 On (s, S)-control in a manufacturing system
by Kochel, Peter
- 351-357 Storage opportunity loss with a Pearson demand distribution
by Pastijn, H. & Schaffers, M.
- 359-363 Sequential stability of the constant cost dynamic lot size model
by Richter, Knut
- 365-372 Inventory control with variation in lead times, especially when demand is intermittent
by Segerstedt, Anders
- 373-377 Supply centers allocation under budget restrictions minimizing the longest delivery time
by Tsouros, C. & Satratzemi, M.
- 379-389 An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers
by Vereecke, Ann & Verstraeten, Peter
- 391-400 On multi-stage production/inventory systems under stochastic demand
by Zijm, Henk & Van Houtum, Geert-Jan
- 401-404 A stochastic model for forecast consumption in master scheduling
by Weeda, P. J.
- 405-406 Managing innovative projects : Edited by Alan Webb, Chapman and Hall, London, 1994
by Kiss, Janos
June 1994, Volume 34, Issue 3
- 237-251 Towards total integrated manufacturing
by Bessant, John
- 253-265 Deconstructing car assembler productivity
by Williams, Karel & Haslam, Colln & Williams, John & Johal, Sukhdev
- 267-281 Development of a knowledge-based manufacturing modelling system based on IDEFO for the metal-cutting industry
by Ang, C. L. & Luo, M. & Gay, R. K. L.
- 283-292 Manufacturing planning and control decision model: A design methodology
by Banerjee, S. K. & Kourouklis, A. P. & Penman, J.
- 293-304 Linking strategy to production management structures and systems
by Carrie, A. S. & Macintosh, R. & Scott, A. & Peoples, G. A.
- 305-312 Computer-integrated manufacturing, supervisory management, and human intervention in the production process
by Clark, Jon
- 313-327 The design of computer-integrated manufacturing systems
by Gunasekaran, A. & Virtanen, I. & Martikainen, T. & Yli-Olli, P.
- 329-345 Achieving integration through managing concurrent engineering
by Pawar, Kulwant S. & Riedel, Johann C. K. H.
- 347-357 Shortening the new product introduction cycle through electronic data transfer
by Standish, Richard & Jones, Roy & Sumpter, Chris & Sharp, John
- 359-369 CIM and the process of innovation: Integrating the organization of production
by Rowlinson, Michael & Procter, Stephen & Hassard, John
- 371-381 Gaining the benefits of integrated manufacturing technology -- just who benefits and how?
by Thomas, Pete & Wainwright, David
March 1994, Volume 34, Issue 2
- 129-138 Application of an interactive method for MOILP in project selection decision - a case from an Indian coal mining industry
by Mukherjee, Kampan
- 139-149 The growth and convergence of manufacturing productivity in industrial and newly industrialising countries
by Lowe, Paul & Fernandes, Elton
- 151-155 Credit financing in economic ordering policies of deteriorating items
by Jaggi, C. K. & Aggarwal, S. P.
- 157-165 On the transient behaviour of a merge production system with an end buffer
by Gopalan, M. N. & Kumar, U. Dinesh
- 167-178 An integrated approach to solving the master aggregate scheduling problem
by Das, Sanchoy K. & Sarin, Subhash C.
- 179-185 Solving a generalized model for CON due date assignment and sequencing
by De, Prabuddha & Ghosh, Jay B. & Wells, Charles E.
- 187-200 Estimating the effects of parameter variability on learning curve model predictions
by Vigil, Dimas P. & Sarper, Huseyin
- 201-207 On the total productivity management of a maintenance float system through AHP applications
by Madu, Christian N.
- 209-222 Classification of inventory models and systems
by Prasad, Sameer
- 223-229 Minimizing maximum tardiness for unrelated parallel machines
by Suresh, V. & Chaudhuri, Dipak
February 1994, Volume 34, Issue 1
- 1-15 Lagrangian heuristics for the capacitated multi-item lot-sizing problem with backordering
by Millar, Harvey H. & Yang, Minzhu
- 17-33 Product-line selection, production decisions and allocation of common fixed costs
by Karmarkar, Uday & Pitbladdo, Richard
- 35-45 MRP II company profile and implementation problems: A Singapore experience
by Ang, J. S. K. & Sum, C. C. & Yang, K. K.
- 47-55 Mathematical model for estimating the economic effectiveness of production process in coal panels and an example of its practical application
by Magda, Roman
- 57-64 Market vulnerability in the process industries
by Zaidman, B.
- 65-72 Effects of inflation and the time value of money on order quantity and allowable shortage
by Sarker, Bhaba R. & Pan, Haixu
- 73-82 A formulation and solution methodology for part movement minimization and workload balancing at loading decisions in FMS
by Modi, Bimal K. & Shanker, Kripa
- 83-89 Investment and production costs analysis in food processing plants
by Parin, Maria A. & Zugarramurdi, Aurora
- 91-97 The relationship between speed and productivity in industry networks: A study of industrial statistics
by Holmstrom, Jan
- 99-113 A multicriteria approach to concurrent engineering
by Agrell, Per J.
- 115-117 Determining economic replenishment intervals for linear trend in demand
by Goyal, S. K.
- 119-119 Global manufacturing practices : Edited by D. Clay Whybark and Gyula Vastag, Elsevier, Amsterdam, 1993, 482 p., ISBN: 0 444 899782
by Demeter, Krisztina
January 1994, Volume 33, Issue 1-3
- 1-3 Pacific manufacturing
by Tabucanon, Mario T.
- 5-15 An expert system for choosing demand forecasting techniques
by Lo, Tammy
- 17-30 Facilities layout: A knowledge-based approach for converting a dual graph into a block layout
by Welgama, P. S. & Gibson, P. R. & Al-Hakim, L. A. R.
- 31-43 Expert system for AGV managing in bidirectional networks: KADS methodology based approach
by Dhouib, Karem & Kadi, Daoud Ait
- 45-52 The usefulness of possibilistic programming in production planning problems
by Inuiguchi, Masahiro & Sakawa, Masatoshi & Kume, Yasufumi
- 53-66 Local search algorithms for flow shop scheduling with fuzzy due-dates
by Ishibuchi, Hisao & Yamamoto, Naohisa & Misaki, Shinta & Tanaka, Hideo
- 67-74 Neural network approach for minimizing the makespan of the general job-shop
by Satake, Tsuyoshi & Morikawa, Katsumi & Nakamura, Nobuto
- 75-79 Adaptive diagnostic procedure for failures in a series system
by Jinsheng, Gao & Ait-Kadi, Daoud
- 81-88 Some practical issues in the assessment of nonconforming rates in a manufacturing process
by Goh, T. N.
- 89-95 Sensitivity analysis on the CUSUM method
by Radharamanan, R. & Galelli, A. & Alex, D. T. & Perez, L. L.
- 97-107 Quality control through lot sizing for items sold with warranty
by Djamaludin, I. & Murthy, D. N. P. & Wilson, R. J.
- 109-119 Optimal sequence of partial inspections subject to errors
by Liou, Ming-Jong & Tseng, Sheng-Tsaing & Lin, Tsong-Ming
- 121-131 A multiple-criteria approach to machine selection for flexible manufacturing systems
by Myint, San & Tabucanon, Mario T.
- 133-142 Group technology concepts as applied to flexible manufacturing systems
by Radharamanan, R.
- 143-153 Designing of a components-oriented ordering system
by Hiraki, Shusaku & Takahashi, Katsuhiko & Watanabe, Norio
- 155-161 Pull-Push integration in production ordering systems
by Takahashi, Katsuhiko & Hiraki, Shusaku & Soshiroda, Michio
- 163-168 An optimal operation planning for the fixed quantity withdrawal Kanban system with variable leadtimes
by Yanagawa, Yoshinari & Miyazaki, Shigeji & Ohta, Hiroshi
- 169-183 A branch and bound algorithm for scheduling just-in-time mixed-model assembly lines
by Ng, W. C. & Mak, K. L.
- 185-194 Batch-scheduling problems to minimize inventory cost in the shop with both receiving and delivery just-in-times
by Hakim Halim, Abdul & Ohta, Hiroshi
- 195-205 Just-in-time shipments in a truck-traffic-coordination system
by Pleschberger, Thomas E. & Hitomi, Katsundo
- 207-214 A study of heuristics for bidirectional multi-hoist production scheduling systems
by Sun, T. C. & Lai, K. K. & Lam, Kokin & So, K. P.
- 215-223 Optimal input control for job-shop type production systems using inverse queueing network analysis
by Kuroda, M. & Kawada, A.
- 225-236 A simulation study of unit exchange spares management of diesel locomotives in the Indian railways
by Kumar, Narendra & Vrat, Prem & Sushil
- 237-245 An integration approach to process design and parts-layout planning
by Ohashi, Kazumasa
- 247-255 A method of flexible scheduling for flexible manufacturing systems
by Choi, Junghee & Hitomi, Katsundo & Econ, P. E. & Econ, P.
- 257-264 An economic manufacturing quantity model with learning effects
by Cheng, T. C. E.
- 265-270 Production scheduling to satisfy worker's preferences for days off and overtime under due-date constraints
by Yura, Kenji
November 1993, Volume 32, Issue 3
- 269-276 Analysis of correlated risky cash flow
by Hui, Y. V. & Leung, L. C. & Huang, J. S.
- 277-283 Modeling in-house vs. contract maintenance, with fixed costs and learning effects
by Kennedy, W. J.
- 285-290 Heuristic algorithms for scheduling in the no-wait flowshop
by Gangadharan, Rajesh & Rajendran, Chandrasekharan
- 291-299 A deterministic inventory model for deteriorating items with stock-dependent demand rate
by Pal, S. & Goswami, A. & Chaudhuri, K. S.
- 301-313 An efficient dynamic dispatching rule for scheduling in a job shop
by Raghu, T. S. & Rajendran, Chandrasekharan
- 315-326 Unquality-costing sampling plans by variables and their implications on supply relationships
by D'Amours, Sophie & Lefrancois, Pierre & Montreuil, Benoit & Ramudhin, Amar
- 327-334 Optimal target values for a filling process when inspection is based on a correlated variable
by Bai, Do Sun & Lee, Min Koo
- 335-354 Comparison of depreciation and corporate tax policies between the countries of the North American free trade area (NAFTA) and the European Community (EC)
by Remer, Donald S. & Nieto, Armando P.
- 355-364 A comparison of manufacturing management in JIT and non-JIT firms
by Ebrahimpour, Maling & Withers, Barbara E.
- 365-381 Technological progress and optimal supply price
by Dompere, Kofi Kissi
September 1993, Volume 32, Issue 2
- 133-154 Classification and coding of components for implementing a computerized inventory control system for a television assembling industry
by Rajamani, Divakar
- 155-168 Linear programming optimization of a network for an aluminum plant: A case study
by Farkas, Andras & Koltai, Tamas & Szendrovits, Andrew
- 169-183 Comparing performance measures in dynamic job shops: economics vs. time
by Rohleder, Thomas R. & Scudder, Gary D.
- 185-187 A note on "minimizing a quadratic function of job lateness on a single machine"
by Tadei, Roberto
- 189-207 A neural-network-based approach for estimating the cost of assembly systems
by Shtub, Avraham & Zimerman, Yoav
- 209-228 A fuzzy upgrading of integrated vague managerial and engineering knowledge
by Dohnal, M. & Starzak, M. & Kerkovsky, M. & Dohnalova, J. & Vystrcil, J. & Koivisto, R. & Pokorny, M. & Vanis, M. & Parsons, S.
- 229-237 Outage costs caused by various outage depths
by Hsu, George J. Y. & Chang, Pao-long & Chen, Tser-yieth
- 239-254 Multiobjective facility layout using simulated annealing
by Suresh, G. & Sahu, S.
- 255-260 An optimal batch size for a production system operating under a just-in-time delivery system
by Jamal, A. M. M. & Sarker, Bhaba R.
- 261-266 An analytic eclectic heuristic for replenishment with linear increasing demand
by Yang, J. & Rand, G. K.
August 1993, Volume 32, Issue 1
- 1-11 Industrial benchmarking: A case study of performance analysis techniques
by Schefczyk, Michael
- 13-21 A new method for the analysis of operating costs of construction equipment
by Manatakis, Emmanuel K. & Drakatos, Panagiotis A.
- 23-37 Modelling and analysis of just-in-time manufacturing systems
by Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P.
- 39-51 Predicting inventory record-keeping errors with discriminant analysis: A field experiment
by Sheppard, George M. & Brown, Karen A.
- 53-63 Dynamic scheduling--a survey of research
by Suresh, V. & Chaudhuri, Dipak
- 65-76 A multidimensional scaling algorithm for group layout in cellular manufacturing
by Chandrasekharan, M. P. & Rajagopalan, R.
- 77-82 Probabilistic time-scheduling model for an exponentially decaying inventory when delays in payments are permissible
by Shah, Nita. H.
- 83-90 Supply delays and the inventory stocking policy
by Sulem, Agnes & Tapiero, Charles S.
- 91-97 A note on ordering policies with cost of observation and lead times
by Sridharan, V.
- 99-101 An inventory model for non-deteriorating items
by Sridharan, V.
- 103-115 Survey of project evaluation techniques currently used in industry
by Remer, Donald S. & Stokdyk, Scott B. & Van Driel, Mike
- 117-127 A two-level decision-making model for controlling stochastic projects
by Golenko-Ginzburg, Dimitri
- 129-130 Computer integrated manufacturing (in four volumes) : Edited by R.U. Ayres, Chapmann & Hall, 1993
by Demeter, Krisztina & Mucsi, Baranabas
July 1993, Volume 30-31, Issue 1
- 1-2 Strategic and operational issues in production economics
by Grubbstrom, Robert W. & Hinterhuber, Hans H.
- 3-22 Production control in engineer-to-order firms
by Bertrand, J. W. M. & Muntslag, D. R.
- 23-30 The influence of central government's policy on production and the inventory in a spatial oligopoly
by Bogataj, Marija & Bogataj, Ludvik
- 31-42 Capacity smoothing and sequencing for mixed-model lines
by Decker, Maria
- 43-52 Simulation of pull type manufacturing system for evaluating maintenance planning
by Durmusoglu, Semra
- 53-66 Integrating marketing and production planning in make-to-order companies
by Kingsman, Brian & Worden, Lee & Hendry, Linda & Mercer, Alan & Wilson, Elaine
- 67-78 Manufacturing flexibility and profitability
by Olhager, Jan
- 79-93 Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results
by Sethi, Suresh & Yan, Houmin & Zhang, Qing & Zhou, Xun Yu
- 95-106 Manpower capacity planning -- A hierarchical approach
by Wild, Bernhard & Schneewei, Christoph
- 107-122 Production Planning and Control (PPC) systems including load-oriented order release -- Problems and research perspectives
by Zapfel, G. & Missbauer, H.
- 123-135 Process planning for a modular component placement system
by Zijm, W. H. M. & van Harten, A.
- 137-152 Capacitated lot-sizing with minimum batch sizes and setup times
by Anderson, Edward J. & Cheah, Boon Soon
- 153-166 Initial order quantities in a multistage production system with backlogging
by Grubbstrom, Robert W. & Ding, Huiping
- 167-178 Measuring and improving planning stability of reorder-point lot-sizing policies
by Jensen, Thomas
- 179-194 Optimal and approximate (Q, r) inventory policies with lost sales and gamma-distributed lead time
by Johansen, Soren Glud & Thorstenson, Anders
- 195-204 A theoretical framework for understanding why JIT reduces cost and cycle time and improves quality
by Miltenburg, John
- 205-212 Different evaluations of `criticity' in production processes
by Poiaga, Luigi
- 213-219 A capacitated single-item lot-size model
by Rosling, Kaj
- 221-227 Heterogeneous batch structures in throughput scheduling
by Weeda, P. J.
- 229-242 Industrial conversion to natural gas--An efficient and risk neutral strategy?
by Andersson, Berndt & Lindblom, Ted
- 243-264 The challenges of capacity planning
by Bakke, Nils Arne & Hellberg, Roland
- 265-272 Engineering design and product development and its relationship to manufacturing: A programme of case study research in British companies
by Braiden, P. M. & Alderman, N. & Thwaites, A. T.
- 273-280 Manufacturing practice in a transition economy
by Chikan, Attila & Demeter, Krisztina
- 281-296 Integrated performance measurement: A review of current practice and emerging trends
by Gregory, M. J.
- 297-307 What makes a strategist out of a manager? What engineers should know about strategic management
by Hinterhuber, Hans H. & Popp, Wolfgang
- 309-322 Design of the decision process for strategic investment in advanced manufacturing systems
by O'Brien, C. & Smith, S. J. E.
- 323-330 Operational technology transfer: Can we calculate the behavior costs?
by Palaniswami, Shanthakumar & Bishop, Ronald C.
- 331-343 The analytic hierarchy process based expert analysis of strategies and critical success factors of forest industries in Finland
by Tuominen, Markku & Sierila, Pentti
- 345-353 Progress on developing a framework for computer aided production management
by Bonney, M. C. & Head, M. A.
- 355-364 Architectural framework for the design of a simulation environment for decentralized production management
by Kruse, Chr. & Zell, M. & Scheer, A. -W.
- 365-383 Decentralized production planning and design of a production management system based on an object-oriented architecture
by Rohloff, M.
- 385-397 Quality of services "applicable to production?"
by Govers, C. P. M.
- 399-413 Improving service quality: Learning from manufacturing
by Mefford, Robert N.
- 415-425 Inventory control and quality system requirements--a case study
by Moisio, Urpo & Virolainen, Veli-Matti
- 427-436 Analysis of the conversion from a job shop system to a cellular manufacturing system
by Durmusoglu, M. Bulent
- 437-451 Using a knowledge-based decision support system development environment to implement a scheduling system for a workshop
by Klein, Michel & Lecomte, Catherine & Dejax, Pierre
- 453-464 An expert system for a local planning environment
by Meester, G. J.
- 465-476 The appraisal of industrial investments: A new method and a case study
by Gallo, Paolo & Peccati, Lorenzo
- 477-488 Post-implementation reviews of investment: Evidence from a two-stage study
by Morgan, Eleanor J. & Tang, Yan Ling
- 489-499 An integrated approach to the layout of flexible transfer lines (FTLs): Buffer stocks allocation
by Abdel-Malek, Layek & Tang, Chi
- 501-518 Determining the number of spares in an inventory/repair system which supports equipment with scheduled usage
by Bridgman, Michael S. & Mount-Campbell, Clark A.
- 519-530 The economic lot size and relevant costs
by Corbey, Michael & Jansen, Rutger
- 531-542 Determining economic inventory policies in a multi-stage just-in-time production system
by Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P.
- 543-550 Inventory control of repairable tools with incomplete information
by Hamann, Thomas & Proth, Jean-Marie
- 551-562 Reducing system nervousness in multi-product inventory systems
by van der Sluis, Erik
- 563-569 Global relations between inventory, manufacturing lead time and delivery date promises
by Vastag, Gyula & Whybark, D. Clay
- 571-577 Freight rates for small shipments
by Arcelus, F. J. & Rowcroft, J. E.
- 579-589 Scheduling of packaging lines in the process industry: An empirical investigation
by van Dam, Peter & Gaalman, Gerard & Sierksma, Gerard
- 591-599 A practical solution to a newspaper distribution problem
by Mantel, R. J. & Fontein, M.
May 1993, Volume 29, Issue 3
- 237-247 Economy of scope, added value chain and cost dynamics: A tentative optimization model
by Durand, Thomas
- 249-257 Multilocation plant sizing and timing problem: Analysis of spatial decomposition procedure
by Kulkarni, R. V. & Mohanty, R. P.
- 259-269 An investigation of a simple logistic model
by Mehrez, A. & Kaspi, M. & Gitlitz, O.
- 271-289 Activity-based cost tables to support wire harness design
by Ong, N. S.
- 291-302 A comparison of allocation policies in a two-echelon repairable-item inventory model
by Buyukkurt, M. Demirbag & Parlar, M.
- 303-312 Estimation of the installed cost of heat exchanger networks
by Suaysompol, K. & Wood, R. M.
- 313-321 A microeconomic analysis of investment in just-in-time manufacturing
by Jewkes, E. & Power, M.
March 1993, Volume 29, Issue 2
- 125-138 A production planning and scheduling system at a chemical testing laboratory
by Chase, Richard B. & Rajagopalan, S.
- 139-148 Method of production smoothing for two-stage production and inventory system
by Ishii, Kazuyoshi & Minaki, Terumi & Hiraki, Shusaku
- 149-157 Simulation analyses of a maintenance float shop
by Madu, Christian N. & Kuei, Chu-Hua
- 159-166 Replacement policy under partially observed Markov process
by Sinuany-Stern, Zilla
- 167-174 Maintenance project management in the process industries: A look at the realities
by Pruett, James M. & Rinks, Dan B.
- 175-186 Heuristic approach to task scheduling: `weight' and `improve' algorithms
by Rafaeli, Dolev & Mahalel, David & Prashker, Joseph N.
- 187-201 Adapting traditional breakeven analysis to modern production economics: Simultaneously modeling economies of scale and scope
by Hanna, Mark D. & Newman, W. Rocky & Sridharan, Sri V.
- 203-210 Determining input parameters under process uncertainties
by `Nat' Natarajan, R.
- 211-222 Estimating the reduction in labor hours due to a new technology under uncertain demand
by Jang, Jaejin & Liu, C. Richard
- 223-231 A heuristic methodology to evaluate price discount structures from the buyer's perspective
by Madan, Manu & Bramorski, Tom & Gnanendran, Kingsley
February 1993, Volume 29, Issue 1
- 1-10 Cyclic machine loading, product allocation and lot sizing in an asbestos cement sheet factory
by Awate, Prakash G. & Tabucanon, Mario T.
- 11-25 Optimal buffer space for a periodic review production/inventory system with inventory-dependent production rate
by Sung, C. S. & Han, Y. H.
- 27-41 Methodology for converting a functional manufacturing system into a cellular manufacturing system
by Logendran, Rasaratnam
- 43-48 Scrap minimization in production processes with stochastic outputs
by Sounderpandian, Jayavel & Dhavale, Dileep G.
- 49-64 Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system
by Egbelu, Pius J.
- 65-73 Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
by Rajendran, Chandrasekharan
- 75-88 Sequencing picking operations and travel time models for man-on-board storage and retrieval warehousing system
by Hwang, Hark & Song, Jin Young
- 89-101 An investigation of due-date assignment using workload information of a dynamic shop
by Udo, Godwin
- 103-110 Failure predictions in repairable multi-component systems
by Roberts, W. Jr. & Mann, L. Jr.
- 111-122 Horizon extension for rolling production schedules: Length and accuracy requirements
by Russell, R. A. & Urban, T. L.
December 1992, Volume 28, Issue 3
- 255-263 Incentives for overhead cost reduction: Setup time and lot size considerations
by Hegde, G. G. & Nagarajan, Nandu J.
- 265-282 Impact of electronic data interchange technology on quality improvement and inventory reduction programs: A field study
by Kekre, Sunder & Mukhopadhyay, Tridas
- 283-288 Improved lot sizing heuristics for multi-stage inventory models with backlogging
by Voros, Jozsef & Chand, Suresh
- 289-297 Expectation-variance analyss of job sequences under processing time uncertainty
by De, Prabuddha & Ghosh, Jay B. & Wells, Charles E.
- 299-307 Timing the control point under the exponential stationary process
by Friedman, Lea
- 309-319 The optimal mix of flexible and dedicated manufacturing capacities: Hedging against demand uncertainty
by Gupta, Diwakar & Gerchak, Yigal & Buzacott, John A.
- 321-339 Impact of external factors on organizational performance
by Kolay, M. K. & Sahu, K. C.
- 341-352 Engineering changes and time delays: A field investigation
by Hegde, G. G. & Kekre, Sham & Kekre, Sunder
November 1992, Volume 28, Issue 2