Continuous review inventory control when capacity is variable
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Gerchak, Yigal, 1992. "Order point/order quantity models with random yield," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 297-298, February.
- Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Frank W. Ciarallo & Ramakrishna Akella & Thomas E. Morton, 1994. "A Periodic Review, Production Planning Model with Uncertain Capacity and Uncertain Demand---Optimality of Extended Myopic Policies," Management Science, INFORMS, vol. 40(3), pages 320-332, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Erdem, Asli Sencer & Ozekici, Suleyman, 2002. "Inventory models with random yield in a random environment," International Journal of Production Economics, Elsevier, vol. 78(3), pages 239-253, August.
- Wang, Daqin & Tang, Ou & Zhang, Lihua, 2014. "A periodic review lot sizing problem with random yields, disruptions and inventory capacity," International Journal of Production Economics, Elsevier, vol. 155(C), pages 330-339.
- Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
- Li, Jing-An & Wu, Yue & Lai, Kin Keung & Liu, Ke, 2006. "Optimal ordering policy in a distribution system," International Journal of Production Economics, Elsevier, vol. 103(2), pages 527-534, October.
- Mohammad Ebrahim Arbabian & Hossein Rikhtehgar Berenji, 2023. "Inventory systems with uncertain supplier capacity: an application to covid-19 testing," Operations Management Research, Springer, vol. 16(1), pages 324-344, March.
- Mohammed Alnahhal & Batin Latif Aylak & Muataz Al Hazza & Ahmad Sakhrieh, 2024. "Economic Order Quantity: A State-of-the-Art in the Era of Uncertain Supply Chains," Sustainability, MDPI, vol. 16(14), pages 1-19, July.
- Ilkyeong Moon & Byung-Hyun Ha & Jongchul Kim, 2012. "Inventory systems with variable capacity," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 6(1), pages 68-86.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Mohammad Ebrahim Arbabian & Hossein Rikhtehgar Berenji, 2023. "Inventory systems with uncertain supplier capacity: an application to covid-19 testing," Operations Management Research, Springer, vol. 16(1), pages 324-344, March.
- Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
- Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
- Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
- Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
- Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
- Ilkyeong Moon & Byung-Hyun Ha & Jongchul Kim, 2012. "Inventory systems with variable capacity," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 6(1), pages 68-86.
- Joann F. de Zegher & Dan A. Iancu & Hau L. Lee, 2019. "Designing Contracts and Sourcing Channels to Create Shared Value," Manufacturing & Service Operations Management, INFORMS, vol. 21(2), pages 271-289, May.
- Burak Kazaz, 2004. "Production Planning Under Yield and Demand Uncertainty with Yield-Dependent Cost and Price," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 209-224, October.
- Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici, 2006. "An EOQ model with multiple suppliers and random capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 101-114, February.
- Baruah, Pundarikaksha, 2006. "Supply Chains Facing Atypical Demand: Optimal Operational Policies And Benefits Under Information Sharing," MPRA Paper 16101, University Library of Munich, Germany.
- Yi Yang & Youhua (Frank) Chen & Yun Zhou, 2014. "Coordinating Inventory Control and Pricing Strategies Under Batch Ordering," Operations Research, INFORMS, vol. 62(1), pages 25-37, February.
- Jain, Tarun & Hazra, Jishnu, 2017. "Sourcing strategies under agglomeration economies, capacity risks and retail competition," International Journal of Production Economics, Elsevier, vol. 191(C), pages 311-322.
- Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
- Arifoglu, Kenan & Özekici, Süleyman, 2011. "Inventory management with random supply and imperfect information: A hidden Markov model," International Journal of Production Economics, Elsevier, vol. 134(1), pages 123-137, November.
- Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
- Maqbool Dada & Nicholas C. Petruzzi & Leroy B. Schwarz, 2007. "A Newsvendor's Procurement Problem when Suppliers Are Unreliable," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 9-32, August.
- Arifoglu, Kenan & Özekici, Süleyman, 2010. "Optimal policies for inventory systems with finite capacity and partially observed Markov-modulated demand and supply processes," European Journal of Operational Research, Elsevier, vol. 204(3), pages 421-438, August.
- Maddah, Bacel & Moussawi, Lama & Jaber, Mohamad Y., 2010. "Lot sizing with a Markov production process and imperfect items scrapped," International Journal of Production Economics, Elsevier, vol. 124(2), pages 340-347, April.
- Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:381-388. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.