A capacity-constrained multi-level inventory and production control problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
- Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
- Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
- Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
- Tempelmeier, Horst & Helber, Stefan, 1994. "A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures," European Journal of Operational Research, Elsevier, vol. 75(2), pages 296-311, June.
- Grubbstrom, Robert W. & Ovrin, Peter, 1992. "Intertemporal generalization of the relationship between material requirements planning and input-output analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 311-318, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rom, Walter O. & Tukel, Oya Icmeli & Muscatello, Joseph R., 2002. "MRP in a job shop environment using a resource constrained project scheduling model," Omega, Elsevier, vol. 30(4), pages 275-286, August.
- Jean Respen & Nicolas Zufferey & Philippe Wieser, 2017. "Three-level inventory deployment for a luxury watch company facing various perturbations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1195-1210, October.
- Byrne, M.D. & Hossain, M.M., 2005. "Production planning: An improved hybrid approach," International Journal of Production Economics, Elsevier, vol. 93(1), pages 225-229, January.
- Dellaert, N. & Jeunet, J. & Jonard, N., 2000. "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs," International Journal of Production Economics, Elsevier, vol. 68(3), pages 241-257, December.
- D. Debels & M. Vanhoucke, 2006.
"A finite capacity production scheduling procedure for a Belgian steel company,"
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium
06/418, Ghent University, Faculty of Economics and Business Administration.
- Debels, D. & Vanhoucke, M., 2006. "A finite capacity production scheduling procedure for a belgian steel company," Vlerick Leuven Gent Management School Working Paper Series 2006-41, Vlerick Leuven Gent Management School.
- Ozdamar, Linet & Barbarosoglu, Gulay, 2000. "An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 68(3), pages 319-331, December.
- Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
- Guinet, Alain, 2001. "Multi-site planning: A transshipment problem," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 21-32, December.
- Bogataj, Marija & Bogataj, Ludvik, 2004. "On the compact presentation of the lead times perturbations in distribution networks," International Journal of Production Economics, Elsevier, vol. 88(2), pages 145-155, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
- Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
- Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
- Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
- Helber, Stefan & Sahling, Florian, 2010.
"A fix-and-optimize approach for the multi-level capacitated lot sizing problem,"
International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
- Helber, Stefan & Sahling, Florian, 2008. "A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems," Hannover Economic Papers (HEP) dp-393, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
- Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
- Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
- Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
- Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
- Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
- Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Grubbstrom, Robert W., 1995. "Modelling production opportunities -- an historical overview," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 1-14, October.
- Sampath Rajagopalan & Jayashankar M. Swaminathan, 2001. "A Coordinated Production Planning Model with Capacity Expansion and Inventory Management," Management Science, INFORMS, vol. 47(11), pages 1562-1580, November.
- Hartmut Stadtler, 2003. "Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows," Operations Research, INFORMS, vol. 51(3), pages 487-502, June.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Shah, Purvi, 2020. "Managing customer reactions to brand deletion in B2B and B2C contexts," Journal of Retailing and Consumer Services, Elsevier, vol. 57(C).
- Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
- Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:449-461. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.