Inventory models for fast moving spare parts subject to "sudden death" obsolescence
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Steven Nahmias, 1982. "Perishable Inventory Theory: A Review," Operations Research, INFORMS, vol. 30(4), pages 680-708, August.
- George W. Brown & John Y. Lu & Robert J. Wolfson, 1964. "Dynamic Modeling of Inventories Subject to Obsolescence," Management Science, INFORMS, vol. 11(1), pages 51-63, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Opher Baron & Oded Berman & David Perry, 2010. "Continuous review inventory models for perishable items ordered in batches," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 72(2), pages 217-247, October.
- Song, Yuyue & Lau, Hoong Chuin, 2004. "A periodic-review inventory model with application to the continuous-review obsolescence problem," European Journal of Operational Research, Elsevier, vol. 159(1), pages 110-120, November.
- van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
- Khouja, Moutaz & Goyal, Suresh, 2008. "A review of the joint replenishment problem literature: 1989-2005," European Journal of Operational Research, Elsevier, vol. 186(1), pages 1-16, April.
- Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
- Goyal, S. K. & Giri, B. C., 2001. "Recent trends in modeling of deteriorating inventory," European Journal of Operational Research, Elsevier, vol. 134(1), pages 1-16, October.
- Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Janssen, Larissa & Diabat, Ali & Sauer, Jürgen & Herrmann, Frank, 2018. "A stochastic micro-periodic age-based inventory replenishment policy for perishable goods," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 445-465.
- Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
- Sandun C. Perera & Suresh P. Sethi, 2023. "A survey of stochastic inventory models with fixed costs: Optimality of (s, S) and (s, S)‐type policies—Discrete‐time case," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 131-153, January.
- Bradley R. Staats & Diwas S. KC & Francesca Gino, 2018. "Maintaining Beliefs in the Face of Negative News: The Moderating Role of Experience," Management Science, INFORMS, vol. 64(2), pages 804-824, February.
- Israel David & Eitan Greenshtein & Avraham Mehrez, 1997. "A dynamic‐programming approach to continuous‐review obsolescent inventory problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 757-774, December.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Sarker, Bhaba R. & Mukherjee, Subhasis & Balan, Chidambaram V., 1997. "An order-level lot size inventory model with inventory-level dependent demand and deterioration," International Journal of Production Economics, Elsevier, vol. 48(3), pages 227-236, February.
- Xiong‐zhi Wang & Guo‐qing Wang, 2019. "Integrating dynamic pricing and inventory control for fresh‐agri product under consumer choice," Australian Economic Papers, Wiley Blackwell, vol. 58(1), pages 96-111, March.
- Bourquard, Brian A. & Bereguer, Gemma & Gray, Allan W. & Preckel, Paul, 2017. "Raw Material Variability in Food Manufacturing," 2017 Annual Meeting, July 30-August 1, Chicago, Illinois 258268, Agricultural and Applied Economics Association.
- Z Shen & M Dessouky & F Ordonez, 2011. "Perishable inventory management system with a minimum volume constraint," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2063-2082, December.
- Bhattacharjee, Sudip & Ramesh, R., 2000. "A multi-period profit maximizing model for retail supply chain management: An integration of demand and supply-side mechanisms," European Journal of Operational Research, Elsevier, vol. 122(3), pages 584-601, May.
- Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
- Fleischhacker, Adam J. & Zhao, Yao, 2011. "Planning for demand failure: A dynamic lot size model for clinical trial supply chains," European Journal of Operational Research, Elsevier, vol. 211(3), pages 496-506, June.
- Chiu, Huan Neng, 1995. "A heuristic (R, T) periodic review perishable inventory model with lead times," International Journal of Production Economics, Elsevier, vol. 42(1), pages 1-15, November.
- Meet Patel & Uday Venkatadri & Claver Diallo & Ahsan Habib & Amirsalar Malekahmadi, 2023. "An Adaptive Sequential Decision-Making Approach for Perishable Food Procurement, Storage and Distribution Using Hyperconnected Logistics," Sustainability, MDPI, vol. 16(1), pages 1-29, December.
- Battini, Daria & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A sustainable EOQ model: Theoretical formulation and applications," International Journal of Production Economics, Elsevier, vol. 149(C), pages 145-153.
- Ravichandran, N., 1995. "Stochastic analysis of a continuous review perishable inventory system with positive lead time and Poisson demand," European Journal of Operational Research, Elsevier, vol. 84(2), pages 444-457, July.
- Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
- Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
- Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:44:y:1996:i:3:p:239-248. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.