IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v41y1995i1-3p1-14.html
   My bibliography  Save this article

Modelling production opportunities -- an historical overview

Author

Listed:
  • Grubbstrom, Robert W.

Abstract

No abstract is available for this item.

Suggested Citation

  • Grubbstrom, Robert W., 1995. "Modelling production opportunities -- an historical overview," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 1-14, October.
  • Handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:1-14
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00109-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    2. Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
    3. Arthur F. Veinott, 1969. "Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems," Operations Research, INFORMS, vol. 17(2), pages 262-291, April.
    4. Leroy B. Schwarz & Linus Schrage, 1975. "Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems," Management Science, INFORMS, vol. 21(11), pages 1285-1294, July.
    5. Andrew Z. Szendrovits, 1981. "Note---Comments on the Optimality in "Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems"," Management Science, INFORMS, vol. 27(9), pages 1081-1087, September.
    6. Wallace B. Crowston & Michael Wagner & Jack F. Williams, 1973. "Economic Lot Size Determination in Multi-Stage Assembly Systems," Management Science, INFORMS, vol. 19(5), pages 517-527, January.
    7. Andrew Vazsonyi, 1955. "The Use of Mathematics in Production and Inventory Control--II (Theory of Scheduling)," Management Science, INFORMS, vol. 1(3-4), pages 207-223, 04-07.
    8. Grubbstrom, Robert W & Molinder, Anders, 1994. "Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory systems," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 299-311, June.
    9. G. Hadley, 1964. "A Comparison of Order Quantities Computed Using the Average Annual Cost and the Discounted Cost," Management Science, INFORMS, vol. 10(3), pages 472-476, April.
    10. Andrew J. Clark & Herbert Scarf, 2004. "Optimal Policies for a Multi-Echelon Inventory Problem," Management Science, INFORMS, vol. 50(12_supple), pages 1782-1790, December.
    11. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    12. Jack F. Williams, 1982. "Note---On the Optimality of Integer Lot Size Ratios in "Economic Lot Size Determination in Multi-Stage Assembly Systems"," Management Science, INFORMS, vol. 28(11), pages 1341-1349, November.
    13. Grubbstrom, Robert W. & Ovrin, Peter, 1992. "Intertemporal generalization of the relationship between material requirements planning and input-output analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 311-318, February.
    14. Hirofumi Uzawa, 1962. "Production Functions with Constant Elasticities of Substitution," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 29(4), pages 291-299.
    15. Taylor, Frederick Winslow, 1911. "The Principles of Scientific Management," History of Economic Thought Books, McMaster University Archive for the History of Economic Thought, number taylor1911.
    16. Robin Roundy, 1986. "A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System," Mathematics of Operations Research, INFORMS, vol. 11(4), pages 699-727, November.
    17. Herbert J. Vassian, 1955. "Application of Discrete Variable Servo Theory to Inventory Control," Operations Research, INFORMS, vol. 3(3), pages 272-282, August.
    18. Donald Erlenkotter, 1990. "Ford Whitman Harris and the Economic Order Quantity Model," Operations Research, INFORMS, vol. 38(6), pages 937-946, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Forsund, Finn R. & Sarafoglou, Nikias, 2005. "The tale of two research communities: The diffusion of research on productive efficiency," International Journal of Production Economics, Elsevier, vol. 98(1), pages 17-40, October.
    2. Vojtek Martin & Kendra Martin & Široký Jaromír & Magdechová Katarína & Šipuš Denis, 2019. "Supply Chain Simulation in Educational Process," LOGI – Scientific Journal on Transport and Logistics, Sciendo, vol. 10(1), pages 72-78, May.
    3. Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
    4. Sphicas, Georghios P., 2014. "Generalized EOQ formula using a new parameter: Coefficient of backorder attractiveness," International Journal of Production Economics, Elsevier, vol. 155(C), pages 143-147.
    5. Paul Metzemakers & Erik Louw, 2005. "Land as production factor," ERSA conference papers ersa05p220, European Regional Science Association.
    6. Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Beullens, Patrick, 2014. "Revisiting foundations in lot sizing—Connections between Harris, Crowther, Monahan, and Clark," International Journal of Production Economics, Elsevier, vol. 155(C), pages 68-81.
    3. Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.
    4. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
    5. Grubbström, Robert W. & Tang, Ou, 2012. "The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 765-777.
    6. Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
    7. Bogataj, Ludvik & Horvat, Liljana, 1996. "Stochastic considerations of Grubbstrom--Molinder model of MRP, input-output and multi-echelon inventory systems," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 329-336, August.
    8. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
    9. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    10. Abdul-Jalbar, B. & Gutierrez, J. & Puerto, J. & Sicilia, J., 2003. "Policies for inventory/distribution systems: The effect of centralization vs. decentralization," International Journal of Production Economics, Elsevier, vol. 81(1), pages 281-293, January.
    11. Kim, DaeSoo, 1999. "Optimal two-stage lot sizing and inventory batching policies," International Journal of Production Economics, Elsevier, vol. 58(3), pages 221-234, January.
    12. Grubbstrom, Robert W., 1998. "A net present value approach to safety stocks in planned production," International Journal of Production Economics, Elsevier, vol. 56(1), pages 213-229, September.
    13. Boissière, J. & Frein, Y. & Rapine, C., 2008. "Lot-sizing in a serial distribution system with capacitated in-system production flow," International Journal of Production Economics, Elsevier, vol. 112(1), pages 483-494, March.
    14. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    15. Grubbstrom, Robert W., 1999. "A net present value approach to safety stocks in a multi-level MRP system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 361-375, March.
    16. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Mendoza, Abraham & Ventura, José A., 2010. "A serial inventory system with supplier selection and order quantity allocation," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1304-1315, December.
    18. Sampath Rajagopalan & Jayashankar M. Swaminathan, 2001. "A Coordinated Production Planning Model with Capacity Expansion and Inventory Management," Management Science, INFORMS, vol. 47(11), pages 1562-1580, November.
    19. Horvat, Liljana & Bogataj, Ludvik, 1999. "A market game with the characteristic function according to the MRP and input-output analysis model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 281-288, March.
    20. Boissiere, J. & Frein, Y. & Rapine, C., 2008. "Optimal stationary policies in a 3-stage serial production-distribution logistic chain facing constant and continuous demand," European Journal of Operational Research, Elsevier, vol. 186(2), pages 608-619, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:1-14. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.