IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v41y1995i1-3p51-58.html
   My bibliography  Save this article

Variable priority dispatching rules: An analytical approach

Author

Listed:
  • Agliari, Anna
  • Diligenti, Mauro
  • Zavanella, Lucio

Abstract

No abstract is available for this item.

Suggested Citation

  • Agliari, Anna & Diligenti, Mauro & Zavanella, Lucio, 1995. "Variable priority dispatching rules: An analytical approach," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 51-58, October.
  • Handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:51-58
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00058-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Stephen C. Graves, 1981. "A Review of Production Scheduling," Operations Research, INFORMS, vol. 29(4), pages 646-675, August.
    2. James C. Hershauer & Ronald J. Ebert, 1975. "Search and Simulation Selection of a Job-Shop Sequencing Rule," Management Science, INFORMS, vol. 21(7), pages 833-843, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. El Mehdi, Er Raqabi & Ilyas, Himmich & Nizar, El Hachemi & Issmaïl, El Hallaoui & François, Soumis, 2023. "Incremental LNS framework for integrated production, inventory, and vessel scheduling: Application to a global supply chain," Omega, Elsevier, vol. 116(C).
    2. Ilkyeong Moon & Sanghyup Lee & Moonsoo Shin & Kwangyeol Ryu, 2016. "Evolutionary resource assignment for workload-based production scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(2), pages 375-388, April.
    3. Lindau, Roger A., 1997. "Automatic data capture and its impact on productivity," International Journal of Production Economics, Elsevier, vol. 52(1-2), pages 91-103, October.
    4. Pflughoeft, K. A. & Hutchinson, G. K. & Nazareth, D. L., 1996. "Intelligent decision support for flexible manufacturing: Design and implementation of a knowledge-based simulator," Omega, Elsevier, vol. 24(3), pages 347-360, June.
    5. Young-Chae Hong & Amy Cohn & Stephen Gorga & Edmond O’Brien & William Pozehl & Jennifer Zank, 2019. "Using Optimization Techniques and Multidisciplinary Collaboration to Solve a Challenging Real-World Residency Scheduling Problem," Interfaces, INFORMS, vol. 49(3), pages 201-212, May.
    6. Ersin Körpeoğlu & Zachary Kurtz & Fatma Kılınç-Karzan & Sunder Kekre & Pat A. Basu, 2014. "Business Analytics Assists Transitioning Traditional Medicine to Telemedicine at Virtual Radiologic," Interfaces, INFORMS, vol. 44(4), pages 393-410, August.
    7. Fátima Pilar & Eliana Costa e Silva & Ana Borges, 2023. "Optimizing Vehicle Repairs Scheduling Using Mixed Integer Linear Programming: A Case Study in the Portuguese Automobile Sector," Mathematics, MDPI, vol. 11(11), pages 1-23, June.
    8. Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
    9. Nicolás Álvarez-Gil & Rafael Rosillo & David de la Fuente & Raúl Pino, 2021. "A discrete firefly algorithm for solving the flexible job-shop scheduling problem in a make-to-order manufacturing system," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1353-1374, December.
    10. Torres, Nelson & Greivel, Gus & Betz, Joshua & Moreno, Eduardo & Newman, Alexandra & Thomas, Brian, 2024. "Optimizing steel coil production schedules under continuous casting and hot rolling," European Journal of Operational Research, Elsevier, vol. 314(2), pages 496-508.
    11. Lagodimos, A. G. & Leopoulos, V., 2000. "Greedy heuristic algorithms for manpower shift planning," International Journal of Production Economics, Elsevier, vol. 68(1), pages 95-106, October.
    12. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
    13. Lagodimos, A. G. & Mihiotis, A. N. & Kosmidis, V. C., 2004. "Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations," International Journal of Production Economics, Elsevier, vol. 90(3), pages 345-359, August.
    14. Miguel A. González & Juan José Palacios & Camino R. Vela & Alejandro Hernández-Arauzo, 2017. "Scatter search for minimizing weighted tardiness in a single machine scheduling with setups," Journal of Heuristics, Springer, vol. 23(2), pages 81-110, June.
    15. Khalil Tliba & Thierno M. L. Diallo & Olivia Penas & Romdhane Ben Khalifa & Noureddine Ben Yahia & Jean-Yves Choley, 2023. "Digital twin-driven dynamic scheduling of a hybrid flow shop," Journal of Intelligent Manufacturing, Springer, vol. 34(5), pages 2281-2306, June.
    16. Tang, Christopher S., 2010. "A review of marketing-operations interface models: From co-existence to coordination and collaboration," International Journal of Production Economics, Elsevier, vol. 125(1), pages 22-40, May.
    17. Seifert, Ralf W. & Morito, Susumu, 2001. "Cooperative dispatching - exploiting the flexibility of an FMS by means of incremental optimization," European Journal of Operational Research, Elsevier, vol. 129(1), pages 116-133, February.
    18. Mili Mehrotra & William Schmidt, 2021. "The Value of Supply Chain Disruption Duration Information," Production and Operations Management, Production and Operations Management Society, vol. 30(9), pages 3015-3035, September.
    19. Maglaras, Constantinos & Van Mieghem, Jan A., 2005. "Queueing systems with leadtime constraints: A fluid-model approach for admission and sequencing control," European Journal of Operational Research, Elsevier, vol. 167(1), pages 179-207, November.
    20. Jayashankar M. Swaminathan & Thomas R. Nitsch, 2007. "Managing Product Variety in Automobile Assembly: The Importance of the Sequencing Point," Interfaces, INFORMS, vol. 37(4), pages 324-333, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:51-58. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.