IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v60-61y1999i1p369-374.html
   My bibliography  Save this article

Transient behavior of a single-stage kanban system based on the queueing model

Author

Listed:
  • Seki, Yoichi
  • Hoshino, Naoto

Abstract

No abstract is available for this item.

Suggested Citation

  • Seki, Yoichi & Hoshino, Naoto, 1999. "Transient behavior of a single-stage kanban system based on the queueing model," International Journal of Production Economics, Elsevier, vol. 60(1), pages 369-374, April.
  • Handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:369-374
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00177-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Don Towsley, 1987. "An application of the reflection principle to the transient analysis of the M/M/1 queue," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 451-456, June.
    2. Mark L. Spearman, 1992. "Customer Service in Pull Production Systems," Operations Research, INFORMS, vol. 40(5), pages 948-958, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Broyles, James R. & Cochran, Jeffery K. & Montgomery, Douglas C., 2010. "A statistical Markov chain approximation of transient hospital inpatient inventory," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1645-1657, December.
    2. Gibson, Glenn A. & Alawneh, John Y., 2006. "Time-bounds for production networks," International Journal of Production Economics, Elsevier, vol. 102(1), pages 149-166, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Arabatzis, Garyfallos & Petridis, Konstantinos & Galatsidas, Spyros & Ioannou, Konstantinos, 2013. "A demand scenario based fuelwood supply chain: A conceptual model," Renewable and Sustainable Energy Reviews, Elsevier, vol. 25(C), pages 687-697.
    2. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    3. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    4. Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.
    5. John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
    6. Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
    7. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    8. Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
    9. Huang, Min & Wang, Dingwei & Ip, W. H., 1998. "Simulation study of CONWIP for a cold rolling plant," International Journal of Production Economics, Elsevier, vol. 54(3), pages 257-266, May.
    10. Cao, Dong & Chen, Mingyuan, 2005. "A mixed integer programming model for a two line CONWIP-based production and assembly system," International Journal of Production Economics, Elsevier, vol. 95(3), pages 317-326, March.
    11. Sarker, Bhaba R. & Balan, Chidambaram V., 1999. "Operations planning for a multi-stage kanban system," European Journal of Operational Research, Elsevier, vol. 112(2), pages 284-303, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:369-374. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.