Production lot sizing with variable production rate and explicit idle capacity cost
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- ראובן שטיינר, 1973. "הגבייה ממעבידים - 1971/72," Working Papers 516, National Insurance Institute of Israel.
- חנה וייל, 1995. "סיעוד במגזר הערבי," Working Papers 397, National Insurance Institute of Israel.
- אסתר טולידנו, 1995. "מקבלי דמי אבטלה בשנת 1994," Working Papers 444, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
- Gajpal, Yuvraj & Nourelfath, Mustapha, 2015. "Two efficient heuristics to solve the integrated load distribution and production planning problem," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 204-214.
- Wakhid Ahmad Jauhari & I Nyoman Pujawan & Mokh Suef, 2023. "Sustainable inventory management with hybrid production system and investment to reduce defects," Annals of Operations Research, Springer, vol. 324(1), pages 543-572, May.
- Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
- Berk, Emre & Toy, Ayhan Ozgur & Hazir, Oncu, 2008. "Single item lot-sizing problem for a warm/cold process with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1251-1267, June.
- Raj Kumar Bachar & Shaktipada Bhuniya & Santanu Kumar Ghosh & Biswajit Sarkar, 2022. "Controllable Energy Consumption in a Sustainable Smart Manufacturing Model Considering Superior Service, Flexible Demand, and Partial Outsourcing," Mathematics, MDPI, vol. 10(23), pages 1-29, November.
- Nourelfath, Mustapha & Yalaoui, Farouk, 2012. "Integrated load distribution and production planning in series-parallel multi-state systems with failure rate depending on load," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 138-145.
- Mitali Sarkar & Li Pan & Bikash Koli Dey & Biswajit Sarkar, 2020. "Does the Autonomation Policy Really Help in a Smart Production System for Controlling Defective Production?," Mathematics, MDPI, vol. 8(7), pages 1-21, July.
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
- Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
- Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Ginn, Martin E., 1998. "Underpinning professional career development through a systems analysis methodology," Socio-Economic Planning Sciences, Elsevier, vol. 32(1), pages 67-81, March.
- Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
- James E. Anderson, 2002.
"Trade Reform Diagnostics with Many Households, Quotas, and Tariffs,"
Review of International Economics, Wiley Blackwell, vol. 10(2), pages 215-236, May.
- James E. Anderson, 1999. "Trade Reform Diagnostics with Many Households, Quotas, and Tariffs," Boston College Working Papers in Economics 417, Boston College Department of Economics, revised 03 May 2000.
- Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2014.
"Network DEA II,"
International Series in Operations Research & Management Science, in: Wade D. Cook & Joe Zhu (ed.), Data Envelopment Analysis, edition 127, chapter 0, pages 307-327,
Springer.
- Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2007. "Network DEA," Springer Books, in: Joe Zhu & Wade D. Cook (ed.), Modeling Data Irregularities and Structural Complexities in Data Envelopment Analysis, chapter 0, pages 209-240, Springer.
- Fare, Rolf & Grosskopf, Shawna, 2000. "Network DEA," Socio-Economic Planning Sciences, Elsevier, vol. 34(1), pages 35-49, March.
- Ekins, Paul & Simon, Sandrine, 2003. "An illustrative application of the CRITINC framework to the UK," Ecological Economics, Elsevier, vol. 44(2-3), pages 255-275, March.
- Saydam, Cem & Aytug, Haldun, 2003. "Accurate estimation of expected coverage: revisited," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 69-80, March.
- Kangasharju, Aki & Nijkamp, Peter, 2001.
"Innovation dynamics in space: local actors and local factors,"
Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 31-56, March.
- Aki Kangasharju & Peter Nijkamp, 1997. "Innovation Dynamics in Space: Local Actors and Local Factors," Tinbergen Institute Discussion Papers 97-062/3, Tinbergen Institute.
- Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
- Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
- Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
- Robalo Marques, Carlos & Duarte Neves, Pedro & Morais Sarmento, Luis, 2003.
"Evaluating core inflation indicators,"
Economic Modelling, Elsevier, vol. 20(4), pages 765-775, July.
- Pedro Duarte Neves, 2000. "Evaluating Core Inflation Indicators," Working Papers w200003, Banco de Portugal, Economics and Research Department.
- Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
- Hong, Sung-Chul & Park, Yang-Byung, 1999. "A heuristic for bi-objective vehicle routing with time window constraints," International Journal of Production Economics, Elsevier, vol. 62(3), pages 249-258, September.
- Labelle, A. & Langevin, A. & Campbell, J. F., 2002. "Sector design for snow removal and disposal in urban areas," Socio-Economic Planning Sciences, Elsevier, vol. 36(3), pages 183-202, September.
- Cook, Wade D. & Green, Rodney H., 2000. "Project prioritization: a resource-constrained data envelopment analysis approach," Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 85-99, June.
- de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:59:y:1999:i:1-3:p:251-259. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.