A semi-open decomposition approach for an open queueing network in a general configuration with a kanban blocking mechanism
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
- Zhuang, Li & Hindi, Khalil S., 1993. "Approximate decomposition for closed queueing network models of FMSs with a block-and-wait and state-dependent routing mechanism," European Journal of Operational Research, Elsevier, vol. 67(3), pages 373-386, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
- Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Kumar Satyam & Ananth Krishnamurthy, 2013. "Performance analysis of CONWIP systems with batch size constraints," Annals of Operations Research, Springer, vol. 209(1), pages 85-114, October.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Lauren Xiaoyuan Lu & Jan A. Van Mieghem & R. Canan Savaskan, 2009. "Incentives for Quality Through Endogenous Routing," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 254-273, July.
- Wanzhu Wang & Qazi Salman Khalid & Muhammad Abas & Hao Li & Shakir Azim & Abdur Rehman Babar & Waqas Saleem & Razaullah Khan, 2021. "Implementation of POLCA Integrated QRM Framework for Optimized Production Performance—A Case Study," Sustainability, MDPI, vol. 13(6), pages 1-22, March.
- Johansen, Soren Glud, 1996. "Transfer pricing of a service department facing random demand," International Journal of Production Economics, Elsevier, vol. 46(1), pages 351-358, December.
- Lin, Yu-Hsin & Lee, Ching-En, 2001. "A total standard WIP estimation method for wafer fabrication," European Journal of Operational Research, Elsevier, vol. 131(1), pages 78-94, May.
- Segerstedt, Anders, 1995. "Cover-Time Planning, a method for calculation of material requirements," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 355-368, October.
- Xiaobo, Zhao & Xu, Deju & Zhang, Hanqin & He, Qi-Ming, 2007. "Modeling and analysis of a supply-assembly-store chain," European Journal of Operational Research, Elsevier, vol. 176(1), pages 275-294, January.
- Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
- Nha-Nghi Cruz & Hans Daduna, 2019. "Optimal capacity allocation in a production–inventory system with base stock," Annals of Operations Research, Springer, vol. 277(2), pages 329-344, June.
- Fernandes, Nuno Octavio & do Carmo-Silva, Silvio, 2006. "Generic POLCA--A production and materials flow control mechanism for quick response manufacturing," International Journal of Production Economics, Elsevier, vol. 104(1), pages 74-84, November.
- Tappia, Elena & Roy, Debjit & Melacini, Marco & De Koster, René, 2019. "Integrated storage-order picking systems: Technology, performance models, and design insights," European Journal of Operational Research, Elsevier, vol. 274(3), pages 947-965.
- Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
- João Dias-Ferreira & Luis Ribeiro & Hakan Akillioglu & Pedro Neves & Mauro Onori, 2018. "BIOSOARM: a bio-inspired self-organising architecture for manufacturing cyber-physical shopfloors," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1659-1682, October.
- John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
- Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:375-380. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.