Disposal of excess stock at the end of a project when facing on-going operational usage
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- G. Hadley, 1964. "A Comparison of Order Quantities Computed Using the Average Annual Cost and the Discounted Cost," Management Science, INFORMS, vol. 10(3), pages 472-476, April.
- אסתר טולידנו, 1988. "מקבלי דמי אבטלה בשנת 1987," Working Papers 374, National Insurance Institute of Israel.
- Donald B. Rosenfield, 1989. "Disposal of Excess Inventory," Operations Research, INFORMS, vol. 37(3), pages 404-409, June.
- Anthony Hart, 1973. "Determination of Excess Stock Quantities," Management Science, INFORMS, vol. 19(12), pages 1444-1451, August.
- Silver, Edward A., 1989. "Materials management in large-scale construction projects: Some concerns and research issues," Engineering Costs and Production Economics, Elsevier, vol. 15(1), pages 223-229, May.
- C. Mohan & R. C. Garg, 1961. "Decision on Retention of Excess Stock," Operations Research, INFORMS, vol. 9(4), pages 496-499, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Minner, Stefan & Silver, Edward A. & Robb, David J., 2003. "An improved heuristic for deciding on emergency transshipments," European Journal of Operational Research, Elsevier, vol. 148(2), pages 384-400, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Pinçe, Çerag & Dekker, Rommert, 2011.
"An inventory model for slow moving items subject to obsolescence,"
European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
- Pinçe, C. & Dekker, R., 2009. "An Inventory Model for Slow Moving Items Subject to Obsolescence," ERIM Report Series Research in Management ERS-2009-053-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Luciano, Elisa & Peccati, Lorenzo, 1999. "Capital structure and inventory management:: The temporary sale price problem," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 169-178, March.
- Pinçe, C. & Dekker, R., 2010. "A Continuous Review Inventory Model with Advance Policy Change and Obsolescence," Econometric Institute Research Papers EI 2009-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Willoughby, Keith A., 2001. "Project procurement and disposal decisions: An inventory management model," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 467-472, May.
- Portnov, B. A. & Etzion, Y., 2000. "Investigating the effects of public policy on the interregional patterns of population growth: the case of Israel," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 239-269, December.
- Antunes, Antonio & Peeters, Dominique, 2000.
"A dynamic optimization model for school network planning,"
Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 101-120, June.
- ANTUNES, Antonio & PEETERS, Dominique, 2000. "A dynamic optimization model for school network planning," LIDAM Reprints CORE 1440, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Corbacioglu, Umut & van der Laan, Erwin A., 2007. "Setting the holding cost rates in a two-product system with remanufacturing," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 185-194, September.
- Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
- Luciano, Elisa & Peccati, Lorenzo, 1999. "Some basic problems in inventory theory: The financial perspective," European Journal of Operational Research, Elsevier, vol. 114(2), pages 294-303, April.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Malczewski, Jacek & Jackson, Marlene, 2000. "Multicriteria spatial allocation of educational resources: an overview," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 219-235, September.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Ramasesh, Ranga V., 2010. "Lot-sizing decisions under limited-time price incentives: A review," Omega, Elsevier, vol. 38(3-4), pages 118-135, June.
- van der Laan, Erwin, 2003.
"An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing,"
International Journal of Production Economics, Elsevier, vol. 81(1), pages 317-331, January.
- van der Laan, E.A., 2000. "An NPV and AC Analysis of a Stochastic Inventory System with Joint Manufacturing and Remanufacturing," ERIM Report Series Research in Management ERS-2000-38-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Berden, Thijs P. J. & Brombacher, Aarnout C. & Sander, Peter C., 2000. "The building bricks of product quality: An overview of some basic concepts and principles," International Journal of Production Economics, Elsevier, vol. 67(1), pages 3-15, August.
- Singh, Sachin & McAllister, Charles D. & Rinks, Dan & Jiang, Xiaoyue, 2010. "Implication of risk adjusted discount rates on cycle stock and safety stock in a multi-period inventory model," International Journal of Production Economics, Elsevier, vol. 123(1), pages 187-195, January.
- Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
- Jensen, Hector A. & Maturana, Sergio, 2002. "A possibilistic decision support system for imprecise mathematical programming problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 145-158, May.
- Tayles, Mike & Walley, Paul, 1997. "Integrating manufacturing and management accounting strategy: case study insights," International Journal of Production Economics, Elsevier, vol. 53(1), pages 43-55, November.
- Johansen, Soren Glud & Thorstenson, Anders, 1996. "Optimal (r, Q) inventory policies with Poisson demands and lost sales: discounted and undiscounted cases," International Journal of Production Economics, Elsevier, vol. 46(1), pages 359-371, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:59:y:1999:i:1-3:p:189-194. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.