IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v58y1999i2p199-208.html
   My bibliography  Save this article

Determining safety stocks for production planning in uncertain manufacturing

Author

Listed:
  • Hung, Yi-Feng
  • Chang, Ching-Bin

Abstract

No abstract is available for this item.

Suggested Citation

  • Hung, Yi-Feng & Chang, Ching-Bin, 1999. "Determining safety stocks for production planning in uncertain manufacturing," International Journal of Production Economics, Elsevier, vol. 58(2), pages 199-208, January.
  • Handle: RePEc:eee:proeco:v:58:y:1999:i:2:p:199-208
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00124-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. אסתר טולידנו, 1993. "מקבלי דמי אבטלה בשנת 1992," Working Papers 475, National Insurance Institute of Israel.
    2. חנה וייל, 1995. "סיעוד במגזר הערבי," Working Papers 397, National Insurance Institute of Israel.
    3. אסתר טולידנו, 1995. "מקבלי דמי אבטלה בשנת 1994," Working Papers 444, National Insurance Institute of Israel.
    4. רבקה פריאור, 1984. "נפגעי תאונות עבודה, 1982," Working Papers 382, National Insurance Institute of Israel.
    5. שרית בייץ מוראי & תמר הרון ורבקה ורטמן, 1993. "ביצוע חוק סיעוד במרכזי יום," Working Papers 456, National Insurance Institute of Israel.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    2. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
    3. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    2. Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
    3. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    4. Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
    5. Cook, Wade D. & Green, Rodney H., 2000. "Project prioritization: a resource-constrained data envelopment analysis approach," Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 85-99, June.
    6. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    7. Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
    8. Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
    9. Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo, 2001. "Optimal multiple delivery schedule for demand in logistic model," International Journal of Production Economics, Elsevier, vol. 73(3), pages 241-249, October.
    10. Lillrank, Paul & Holopainen, Sami & Paavola, Teemu, 2002. "Analyzing productivity with the enabler-effect map," International Journal of Production Economics, Elsevier, vol. 78(1), pages 69-78, July.
    11. Cheng, Chun Hung & Cheung, Waiman & Chang, Man Kit, 2002. "The use of the Internet in Hong Kong: Manufacturing vs. service," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 33-45, January.
    12. Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
    13. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    14. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    15. Jensen, Hector A. & Maturana, Sergio, 2002. "A possibilistic decision support system for imprecise mathematical programming problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 145-158, May.
    16. Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
    17. Panizzolo, Roberto, 1998. "Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management," International Journal of Production Economics, Elsevier, vol. 55(3), pages 223-240, August.
    18. Baker, Rose D., 2000. "Calculating the expected failure rate of complex equipment subject to hazardous repair," International Journal of Production Economics, Elsevier, vol. 67(1), pages 53-61, August.
    19. Schniederjans, Marc J. & Cao, Qing, 2000. "A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs," International Journal of Production Economics, Elsevier, vol. 65(3), pages 289-294, May.
    20. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:58:y:1999:i:2:p:199-208. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.