Dynamic process planning system for a machining center in an FMS environment
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Sheldon B. Akers & Joyce Friedman, 1955. "A Non-Numerical Approach to Production Scheduling Problems," Operations Research, INFORMS, vol. 3(4), pages 429-442, November.
- M. Florian & P. Trepant & G. McMahon, 1971. "An Implicit Enumeration Algorithm for the Machine Sequencing Problem," Management Science, INFORMS, vol. 17(12), pages 782-792, August.
- John D. C. Little & Katta G. Murty & Dura W. Sweeney & Caroline Karel, 1963. "An Algorithm for the Traveling Salesman Problem," Operations Research, INFORMS, vol. 11(6), pages 972-989, December.
- Ohashi, Kazumasa, 1994. "An integration approach to process design and parts-layout planning," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 237-245, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- José Berenguel & L. Casado & I. García & Eligius Hendrix, 2013. "On estimating workload in interval branch-and-bound global optimization algorithms," Journal of Global Optimization, Springer, vol. 56(3), pages 821-844, July.
- Tao Ren & Yan Zhang & Shuenn-Ren Cheng & Chin-Chia Wu & Meng Zhang & Bo-yu Chang & Xin-yue Wang & Peng Zhao, 2020. "Effective Heuristic Algorithms Solving the Jobshop Scheduling Problem with Release Dates," Mathematics, MDPI, vol. 8(8), pages 1-25, July.
- Agnetis, Alessandro & Kellerer, Hans & Nicosia, Gaia & Pacifici, Andrea, 2012. "Parallel dedicated machines scheduling with chain precedence constraints," European Journal of Operational Research, Elsevier, vol. 221(2), pages 296-305.
- N. Kazazakis & C. S. Adjiman, 2018. "Arbitrarily tight $$\alpha $$ α BB underestimators of general non-linear functions over sub-optimal domains," Journal of Global Optimization, Springer, vol. 71(4), pages 815-844, August.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Joaquín Antonio Pacheco Bonrostro, 1995. "Problemas de rutas con carga y descarga en sistemas lifo: soluciones exactas," Estudios de Economia Aplicada, Estudios de Economia Aplicada, vol. 3, pages 69-86, Junio.
- Zribi, N. & El Kamel, A. & Borne, P., 2008. "Minimizing the makespan for the MPM job-shop with availability constraints," International Journal of Production Economics, Elsevier, vol. 112(1), pages 151-160, March.
- Tomáš Režnar & Jan Martinovič & Kateřina Slaninová & Ekaterina Grakova & Vít Vondrák, 2017. "Probabilistic time-dependent vehicle routing problem," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 25(3), pages 545-560, September.
- Bogna MRÓWCZYŃSKA, 2015. "Multicriteria vehicle routing problem solved by artificial immune system," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 10(3), pages 141-152, September.
- Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
- Michael Windham & J. Hutchinson & Shizuhiko Nishisato & Ludovic Lebart & George Furnas & Richard Dubes & Frank Critchley & A. Gordon & Fionn Murtagh & Ulf Bockenholt & Philip Hopke & Daniel Wartenberg, 1988. "Book reviews," Journal of Classification, Springer;The Classification Society, vol. 5(1), pages 105-154, March.
- Nikolakopoulos, Athanassios & Sarimveis, Haralambos, 2007. "A threshold accepting heuristic with intense local search for the solution of special instances of the traveling salesman problem," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1911-1929, March.
- Gabriel Mauricio Zambrano-Rey & Eliana María González-Neira & Gabriel Fernando Forero-Ortiz & María José Ocampo-Monsalve & Andrea Rivera-Torres, 2024. "Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns," Annals of Operations Research, Springer, vol. 338(1), pages 801-833, July.
- Schulz, Arne & Pfeiffer, Christian, 2024. "Using fixed paths to improve branch-and-cut algorithms for precedence-constrained routing problems," European Journal of Operational Research, Elsevier, vol. 312(2), pages 456-472.
- Zhang Yang & Jiacheng Li & Lei Li, 2020. "Time-Dependent Theme Park Routing Problem by Partheno-Genetic Algorithm," Mathematics, MDPI, vol. 8(12), pages 1-20, December.
- Lawrence Hubert & Frank Baker, 1978. "Applications of combinatorial programming to data analysis: The traveling salesman and related problems," Psychometrika, Springer;The Psychometric Society, vol. 43(1), pages 81-91, March.
- A. S. Santos & A. M. Madureira & M. L. R. Varela, 2018. "The Influence of Problem Specific Neighborhood Structures in Metaheuristics Performance," Journal of Mathematics, Hindawi, vol. 2018, pages 1-14, July.
- Gilbert Laporte, 2009. "Fifty Years of Vehicle Routing," Transportation Science, INFORMS, vol. 43(4), pages 408-416, November.
- Luminiţa Nicolescu & Cristina Galalae & Alexandru Voicu, 2013. "Solving a Supply Chain Management Problem to Near Optimality Using Ant Colony Optimization, in an International Context," The AMFITEATRU ECONOMIC journal, Academy of Economic Studies - Bucharest, Romania, vol. 15(33), pages 8-26, February.
- Y N Sotskov & A Allahverdi & T-C Lai, 2004. "Flowshop scheduling problem to minimize total completion time with random and bounded processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 277-286, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:457-464. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.