Further developments on safety stocks in an MRP system applying Laplace transforms and input-output analysis
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Grubbstrom, Robert W. & Molinder, Anders, 1996. "Safety production plans in MRP-systems using transform methodology," International Journal of Production Economics, Elsevier, vol. 46(1), pages 297-309, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Tang, Ou, 2004. "Simulated annealing in lot sizing problems," International Journal of Production Economics, Elsevier, vol. 88(2), pages 173-181, March.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
- Campuzano-Bolarín, Francisco & Marín-García, Fulgencio & Moreno-Nicolás, José Andrés & Bogataj, Marija & Bogataj, David, 2021. "Impacts of variable interest rates on the market areas of a spatial duopoly in supply chains operating on the finite horizon," International Journal of Production Economics, Elsevier, vol. 236(C).
- Stößlein, Martin & Kanet, John Jack & Gorman, Mike & Minner, Stefan, 2014. "Time-phased safety stocks planning and its financial impacts: Empirical evidence based on European econometric data," International Journal of Production Economics, Elsevier, vol. 149(C), pages 47-55.
- Yazan, Devrim Murat & Claudio Garavelli, A. & Messeni Petruzzelli, Antonio & Albino, Vito, 2011. "The effect of spatial variables on the economic and environmental performance of bioenergy production chains," International Journal of Production Economics, Elsevier, vol. 131(1), pages 224-233, May.
- Tang, Ou & Grubbstrom, Robert W., 2002. "Planning and replanning the master production schedule under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 78(3), pages 323-334, August.
- Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
- Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.
- Grubbström, Robert W., 2022. "On the net present value distribution affected by a random walk process," International Journal of Production Economics, Elsevier, vol. 250(C).
- Bogataj, David & Battini, Daria & Calzavara, Martina & Persona, Alessandro, 2019. "The ageing workforce challenge: Investments in collaborative robots or contribution to pension schemes, from the multi-echelon perspective," International Journal of Production Economics, Elsevier, vol. 210(C), pages 97-106.
- Sarkar, Biswajit & Guchhait, Rekha & Sarkar, Mitali & Cárdenas-Barrón, Leopoldo Eduardo, 2019. "How does an industry manage the optimum cash flow within a smart production system with the carbon footprint and carbon emission under logistics framework?," International Journal of Production Economics, Elsevier, vol. 213(C), pages 243-257.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Tang, Ou, 2004. "Simulated annealing in lot sizing problems," International Journal of Production Economics, Elsevier, vol. 88(2), pages 173-181, March.
- Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Reprint of “Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 113-125.
- Grubbstrom, Robert W., 1996. "Stochastic properties of a production--inventory process with planned production using transform methodology," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 407-419, August.
- Sagawa, Juliana Keiko & Nagano, Marcelo Seido, 2015. "Modeling the dynamics of a multi-product manufacturing system: A real case application," European Journal of Operational Research, Elsevier, vol. 244(2), pages 624-636.
- Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.
- Grubbstrom, Robert W., 1999. "A net present value approach to safety stocks in a multi-level MRP system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 361-375, March.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Horvat, Liljana & Bogataj, Ludvik, 1999. "A market game with the characteristic function according to the MRP and input-output analysis model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 281-288, March.
- Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model," International Journal of Production Economics, Elsevier, vol. 193(C), pages 51-62.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:381-387. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.