IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v59y1999i1-3p85-92.html
   My bibliography  Save this article

The choice of replenishment policies in an MRP environment

Author

Listed:
  • Hautaniemi, Petri
  • Pirttila, Timo

Abstract

No abstract is available for this item.

Suggested Citation

  • Hautaniemi, Petri & Pirttila, Timo, 1999. "The choice of replenishment policies in an MRP environment," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 85-92, March.
  • Handle: RePEc:eee:proeco:v:59:y:1999:i:1-3:p:85-92
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00026-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Prasad, S. & Shah, V. & Hasan, J., 1996. "A prototype intelligent model management system for inventory decision support," Omega, Elsevier, vol. 24(2), pages 153-166, April.
    2. Olhager, Jan & Ostlund, Bjorn, 1990. "An integrated push-pull manufacturing strategy," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 135-142, April.
    3. Axsater, Sven & Rosling, Kaj, 1994. "Multi-level production-inventory control: Material requirements planning or reorder point policies?," European Journal of Operational Research, Elsevier, vol. 75(2), pages 405-412, June.
    4. Takahashi, Katsuhiko & Hiraki, Shusaku & Soshiroda, Michio, 1994. "Pull-Push integration in production ordering systems," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 155-161, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. W Y Hung & S Kucherenko & N J Samsatli & N Shah, 2004. "A flexible and generic approach to dynamic modelling of supply chains," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(8), pages 801-813, August.
    2. Xu, Haoxuan & Gong, Yeming (Yale) & Chu, Chengbin & Zhang, Jinlong, 2017. "Dynamic lot-sizing models for retailers with online channels," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 171-184.
    3. Mohammaditabar, Davood & Hassan Ghodsypour, Seyed & O'Brien, Chris, 2012. "Inventory control system design by integrating inventory classification and policy selection," International Journal of Production Economics, Elsevier, vol. 140(2), pages 655-659.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Takahashi, Katsuhiko & Soshiroda, Michio, 1996. "Comparing integration strategies in production ordering systems," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 83-89, June.
    2. Bettina Freitag & Lukas Häfner & Verena Pfeuffer & Jochen Übelhör, 2020. "Evaluating investments in flexible on-demand production capacity: a real options approach," Business Research, Springer;German Academic Association for Business Research, vol. 13(1), pages 133-161, April.
    3. Ke Ma & Lichuan Wang & Yan Chen, 2017. "A Collaborative Cloud Service Platform for Realizing Sustainable Make-To-Order Apparel Supply Chain," Sustainability, MDPI, vol. 10(1), pages 1-21, December.
    4. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
    5. repec:dau:papers:123456789/487 is not listed on IDEAS
    6. Gunasekaran, Angappa & Ngai, Eric W.T., 2009. "Modeling and analysis of build-to-order supply chains," European Journal of Operational Research, Elsevier, vol. 195(2), pages 319-334, June.
    7. Monthatipkul, Chumpol & Yenradee, Pisal, 2008. "Inventory/distribution control system in a one-warehouse/multi-retailer supply chain," International Journal of Production Economics, Elsevier, vol. 114(1), pages 119-133, July.
    8. Carole Camisullis & Vincent Giard & Gisele Mendy-Bilek, 2011. "Information to share in supply chains dedicated to the mass production of customized products for decentralized management," Working Papers hal-00876865, HAL.
    9. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    10. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    11. Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
    12. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Discussion Paper 1998-117, Tilburg University, Center for Economic Research.
    13. Axsater, Sven & Rosling, Kaj, 1999. "Ranking of generalised multi-stage KANBAN policies," European Journal of Operational Research, Elsevier, vol. 113(3), pages 560-567, March.
    14. Carole Camisullis & Vincent Giard & Gisele Mendy-Bilek, 2010. "The information to share in upstream supply chains dedicated to mass production of customized products for allowing a decentralized management," Working Papers hal-00876993, HAL.
    15. Golini, Ruggero & Kalchschmidt, Matteo, 2015. "Managing inventories in global sourcing contexts: A contingency perspective," International Journal of Production Economics, Elsevier, vol. 165(C), pages 64-78.
    16. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    17. Olhager, Jan, 2003. "Strategic positioning of the order penetration point," International Journal of Production Economics, Elsevier, vol. 85(3), pages 319-329, September.
    18. Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
    19. Iman Ghalehkhondabi & Ehsan Ardjmand & Gary Weckman, 2017. "Integrated decision making model for pricing and locating the customer order decoupling point of a newsvendor supply chain," OPSEARCH, Springer;Operational Research Society of India, vol. 54(2), pages 417-439, June.
    20. Savsar, Mehmet, 1997. "Simulation analysis of a pull-push system for an electronic assembly line," International Journal of Production Economics, Elsevier, vol. 51(3), pages 205-214, September.
    21. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:59:y:1999:i:1-3:p:85-92. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.