IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v56-57y1998i1p13-19.html
   My bibliography  Save this article

Optimal production run for processes with constant and random drifts

Author

Listed:
  • Al-Sultan, Khaled S.
  • Raouf, A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Al-Sultan, Khaled S. & Raouf, A., 1998. "Optimal production run for processes with constant and random drifts," International Journal of Production Economics, Elsevier, vol. 56(1), pages 13-19, September.
  • Handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:13-19
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(97)00070-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    2. Helmut Schneider & Kwei Tang & Colm O'Cinneide, 1990. "Optimal Control of a Production Process Subject to Random Deterioration," Operations Research, INFORMS, vol. 38(6), pages 1116-1122, December.
    3. Arcelus, F. J. & Banerjee, P. K., 1987. "Optimal production plan in a tool wear process with rewards for acceptable, undersized and oversized parts," Engineering Costs and Production Economics, Elsevier, vol. 11(1), pages 13-19, April.
    4. Rahim, M. A. & Banerjee, P. K., 1988. "Optimal production run for a process with random linear drift," Omega, Elsevier, vol. 16(4), pages 347-351.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Al-Sultan, K. S. & Al-Fawzan, M. A., 1997. "An extension of Rahim and Banerjee's model for a process with upper and lower specification limits," International Journal of Production Economics, Elsevier, vol. 53(3), pages 265-280, December.
    2. Williams, William W. & Tang, Kwei & Gong, Linguo, 2000. "Process improvement for a container-filling process with random shifts," International Journal of Production Economics, Elsevier, vol. 66(1), pages 23-31, June.
    3. Maria R. Ibanez & Michael W. Toffel, 2020. "How Scheduling Can Bias Quality Assessment: Evidence from Food-Safety Inspections," Management Science, INFORMS, vol. 66(6), pages 2396-2416, June.
    4. B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
    5. Yu, Hong-Fwu & Yu, Wen-Ching, 2007. "An optimal mixed policy of inspection and burn-in and the optimal production quantity," International Journal of Production Economics, Elsevier, vol. 105(2), pages 483-491, February.
    6. Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
    7. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    8. Tang, Kwei & Gong, Linguo & Chang, Dong-Shang, 2003. "Optimal process control policies under a time-varying cost structure," European Journal of Operational Research, Elsevier, vol. 149(1), pages 197-210, August.
    9. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    10. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    11. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2015. "Uncertainty propagation in a supply chain or supply network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 73(C), pages 185-206.
    12. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    13. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    14. Tai, Allen H. & Xie, Yue & Ching, Wai-Ki, 2016. "Inspection policy for inventory system with deteriorating products," International Journal of Production Economics, Elsevier, vol. 173(C), pages 22-29.
    15. Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
    16. Mohammad A. M. Abdel-Aal & Shokri Z. Selim, 2019. "A Generalized Process Targeting Model and an Application Involving a Production Process with Multiple Products," Mathematics, MDPI, vol. 7(8), pages 1-17, August.
    17. Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
    18. Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
    19. Darwish, M.A. & Abdulmalek, F. & Alkhedher, M., 2013. "Optimal selection of process mean for a stochastic inventory model," European Journal of Operational Research, Elsevier, vol. 226(3), pages 481-490.
    20. Chih-Hsiung Wang & Ruey Huei Yeh & Peitsang Wu, 2006. "Optimal production time and number of maintenance actions for an imperfect production system under equal-interval maintenance policy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 262-270, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:13-19. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.