An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- John Miltenburg, 1989. "Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems," Management Science, INFORMS, vol. 35(2), pages 192-207, February.
- Wieslaw Kubiak & Suresh Sethi, 1991. "A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems"," Management Science, INFORMS, vol. 37(1), pages 121-122, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yao, Andrew C. & Carlson, John G. H., 2003. "Agility and mixed-model furniture production," International Journal of Production Economics, Elsevier, vol. 81(1), pages 95-102, January.
- Carlson, John G.H. & Yao, Andrew C., 2008. "Simulating an agile, synchronized manufacturing system," International Journal of Production Economics, Elsevier, vol. 112(2), pages 714-722, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- N. Brauner & Y. Crama & A. Grigoriev & J. Klundert, 2005. "A Framework for the Complexity of High-Multiplicity Scheduling Problems," Journal of Combinatorial Optimization, Springer, vol. 9(3), pages 313-323, May.
- Giard, Vincent & Jeunet, Jully, 2010. "Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line," International Journal of Production Economics, Elsevier, vol. 123(2), pages 290-300, February.
- Yavuz, Mesut & Tufekci, Suleyman, 2006. "A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 841-862, October.
- Bollapragada, Srinivas & Bussieck, Michael & Mallik, Suman, 2002. "Scheduling Commercial Videotapes in Broadcast Television," Working Papers 02-0127, University of Illinois at Urbana-Champaign, College of Business.
- Sourd, Francis, 2005. "Punctuality and idleness in just-in-time scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 739-751, December.
- Drexl, Andreas & Jordan, Carsten, 1994. "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 362, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Wieslaw Kubiak & Mesut Yavuz, 2008. "Just-in-Time Smoothing Through Batching," Manufacturing & Service Operations Management, INFORMS, vol. 10(3), pages 506-518, June.
- Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.
- Korkmazel, Tugrul & Meral, Sedef, 2001. "Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 188-207, May.
- Nils Boysen & Christian Ringle, 2008. "Über die Wirkung der Optionsbündelung auf die Ablaufplanung einer Variantenfließfertigung," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 18(3), pages 301-321, February.
- Bautista, Joaquin & Companys, Ramon & Corominas, Albert, 2000. "Note on cyclic sequences in the product rate variation problem," European Journal of Operational Research, Elsevier, vol. 124(3), pages 468-477, August.
- Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
- Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009.
"Sequencing mixed-model assembly lines: Survey, classification and model critique,"
European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2007. "Sequencing mixed-model assembly lines: Survey, classification and model critique," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 02/2007, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "The product rate variation problem and its relevance in real world mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 197(2), pages 818-824, September.
- Zhu, Jin & Ding, Fong-Yuen, 2000. "A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 127(1), pages 203-216, November.
- Mansouri, S. Afshin, 2005. "A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines," European Journal of Operational Research, Elsevier, vol. 167(3), pages 696-716, December.
- Aigbedo, Henry, 2007. "An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain," European Journal of Operational Research, Elsevier, vol. 181(2), pages 704-715, September.
- Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:575-585. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.