The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Cheng, T. C. E., 1994. "An economic manufacturing quantity model with learning effects," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 257-264, January.
- Kirk R. Karwan & Joseph B. Mazzola & Richard C. Morey, 1988. "Production lot sizing under setup and worker learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 159-175, April.
- Chand, Suresh, 1989. "Lot sizes and setup frequency with learning in setups and process quality," European Journal of Operational Research, Elsevier, vol. 42(2), pages 190-202, September.
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Radosław Rudek, 2017. "Parallel machine scheduling with general sum of processing time based models," Journal of Global Optimization, Springer, vol. 68(4), pages 799-814, August.
- Trappey, Amy J.C. & Trappey, Charles V. & Liu, Penny H.Y. & Lin, Lee-Cheng & Ou, Jerry J.R., 2013. "A hierarchical cost learning model for developing wind energy infrastructures," International Journal of Production Economics, Elsevier, vol. 146(2), pages 386-391.
- Ji-Bo Wang & Ming-Zheng Wang, 2011. "Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects," Annals of Operations Research, Springer, vol. 191(1), pages 155-169, November.
- Jaber, Mohamad Y. & Guiffrida, Alfred L., 2004. "Learning curves for processes generating defects requiring reworks," European Journal of Operational Research, Elsevier, vol. 159(3), pages 663-672, December.
- Marco Trost & Thorsten Claus & Frank Herrmann, 2022. "Social Sustainability in Production Planning: A Systematic Literature Review," Sustainability, MDPI, vol. 14(13), pages 1-31, July.
- Jaber, Mohamad Y. & Bonney, Maurice & Guiffrida, Alfred L., 2010. "Coordinating a three-level supply chain with learning-based continuous improvement," International Journal of Production Economics, Elsevier, vol. 127(1), pages 27-38, September.
- Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
- Radosław Rudek, 2012. "Scheduling problems with position dependent job processing times: computational complexity results," Annals of Operations Research, Springer, vol. 196(1), pages 491-516, July.
- Chiu, Huan Neng & Chen, Hsin Min, 2005. "An optimal algorithm for solving the dynamic lot-sizing model with learning and forgetting in setups and production," International Journal of Production Economics, Elsevier, vol. 95(2), pages 179-193, February.
- Vandana & Shiv Raj Singh & Mitali Sarkar & Biswajit Sarkar, 2023. "Effect of Learning and Forgetting on Inventory Model under Carbon Emission and Agile Manufacturing," Mathematics, MDPI, vol. 11(2), pages 1-20, January.
- M. Jaber & Z. Givi, 2015. "Imperfect production process with learning and forgetting effects," Computational Management Science, Springer, vol. 12(1), pages 129-152, January.
- Zanoni, Simone & Jaber, Mohamad Y. & Zavanella, Lucio E., 2012. "Vendor managed inventory (VMI) with consignment considering learning and forgetting effects," International Journal of Production Economics, Elsevier, vol. 140(2), pages 721-730.
- Tsionas, Mike G., 2023. "Bayesian learning in performance. Is there any?," European Journal of Operational Research, Elsevier, vol. 311(1), pages 263-282.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2011. "An economic production and remanufacturing model with learning effects," International Journal of Production Economics, Elsevier, vol. 131(1), pages 115-127, May.
- Chen, Tsung-Hui & Tsao, Yu-Chung, 2014. "Optimal lot-sizing integration policy under learning and rework effects in a manufacturer–retailer chain," International Journal of Production Economics, Elsevier, vol. 155(C), pages 239-248.
- Corominas, Albert & Olivella, Jordi & Pastor, Rafael, 2010. "A model for the assignment of a set of tasks when work performance depends on experience of all tasks involved," International Journal of Production Economics, Elsevier, vol. 126(2), pages 335-340, August.
- Jaber, M.Y. & Bonney, M. & Moualek, I., 2009. "Lot sizing with learning, forgetting and entropy cost," International Journal of Production Economics, Elsevier, vol. 118(1), pages 19-25, March.
- Jaber, M.Y. & Peltokorpi, J. & Glock, C.H. & Grosse, E.H. & Pusic, M., 2021. "Adjustment for cognitive interference enhances the predictability of the power learning curve," International Journal of Production Economics, Elsevier, vol. 234(C).
- Khan, M. & Jaber, M.Y. & Wahab, M.I.M., 2010. "Economic order quantity model for items with imperfect quality with learning in inspection," International Journal of Production Economics, Elsevier, vol. 124(1), pages 87-96, March.
- Lee, Sunghee & Kim, Daeki, 2014. "An optimal policy for a single-vendor single-buyer integrated production–distribution model with both deteriorating and defective items," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 161-170.
- Jaber, Mohamad Y. & Bonney, Maurice, 2007. "Economic manufacture quantity (EMQ) model with lot-size dependent learning and forgetting rates," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 359-367, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jaber, Mohamad Y. & Bonney, Maurice, 2003. "Lot sizing with learning and forgetting in set-ups and in product quality," International Journal of Production Economics, Elsevier, vol. 83(1), pages 95-111, January.
- Kavindra Malik & Yufei Wang, 1993. "An improved algorithm for the dynamic lot‐sizing problem with learning effect in setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 925-931, December.
- Sunantha Teyarachakul & Suresh Chand & Michal Tzur, 2016. "Lot sizing with learning and forgetting in setups: Analytical results and insights," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(2), pages 93-108, March.
- Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
- Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
- Ayd{i}n Alptekinou{g}lu & Charles J. Corbett, 2008. "Mass Customization vs. Mass Production: Variety and Price Competition," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 204-217, August.
- Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
- Suárez, Freddy F. & Cusumano, Michael A., 1954- & Fine, Charles H., 1991. "Flexibility and performance : a literature critique and strategic framework," Working papers 3298-91., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
- Jaber, M.Y. & Bonney, M. & Moualek, I., 2009. "An economic order quantity model for an imperfect production process with entropy cost," International Journal of Production Economics, Elsevier, vol. 118(1), pages 26-33, March.
- S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
- Transchel, Sandra & Minner, Stefan, 2009. "The impact of dynamic pricing on the economic order decision," European Journal of Operational Research, Elsevier, vol. 198(3), pages 773-789, November.
- Mitali Sarkar & Li Pan & Bikash Koli Dey & Biswajit Sarkar, 2020. "Does the Autonomation Policy Really Help in a Smart Production System for Controlling Defective Production?," Mathematics, MDPI, vol. 8(7), pages 1-21, July.
- Kirk R. Karwan & Joseph B. Mazzola & Richard C. Morey, 1988. "Production lot sizing under setup and worker learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 159-175, April.
- Fehmi Tanrısever & S. Sinan Erzurumlu & Nitin Joglekar, 2012. "Production, Process Investment, and the Survival of Debt‐Financed Startup Firms," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 637-652, July.
- Bernstein, Fernando & Gürhan Kök, A. & Meca, Ana, 2015. "Cooperation in assembly systems: The role of knowledge sharing networks," European Journal of Operational Research, Elsevier, vol. 240(1), pages 160-171.
- Ananth V. Iyer & Leroy B. Schwarz & Stefanos A. Zenios, 2005. "A Principal-Agent Model for Product Specification and Production," Management Science, INFORMS, vol. 51(1), pages 106-119, January.
- Bintong Chen & Charles L. Munson, 2004. "Resource allocation with lumpy demand: To speed or not to speed?," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 363-385, April.
- Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
- Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:59:y:1999:i:1-3:p:93-102. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.