IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v16y1968i1p122-141.html
   My bibliography  Save this item

Metric: A Multi-Echelon Technique for Recoverable Item Control

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
  2. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
  3. Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
  4. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
  5. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
  6. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
  7. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
  8. Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
  9. Guangyuan Yang & Rommert Dekker, 2010. "Service Parts Inventory Control with Lateral Transshipment that takes Time," Tinbergen Institute Discussion Papers 10-025/4, Tinbergen Institute, revised 10 Mar 2010.
  10. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Spare parts stock control for redundant systems using reliability centered maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1576-1586.
  11. Zhang, Shuguang & Dan, Bin & Zhou, Maosen, 2019. "After-sale service deployment and information sharing in a supply chain under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 279(2), pages 351-363.
  12. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
  13. Forsberg, Rolf, 1995. "Optimization of order-up-to-S policies for two-level inventory systems with compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 81(1), pages 143-153, February.
  14. Ahire, Sanjay L. & Schmidt, Charles P., 1996. "A model for a Mixed Continuous-Periodic Review One-Warehouse, N-Retailer inventory system," European Journal of Operational Research, Elsevier, vol. 92(1), pages 69-82, July.
  15. Yu-kun Chen & Qi Gao & Xiao-bo Su & Shun Fang & Chi-ming Guo, 2018. "Research on optimization of spare parts inventory policy considering maintenance priority," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1336-1345, December.
  16. Kevin Chiang, Wei-yu & Monahan, George E., 2005. "Managing inventories in a two-echelon dual-channel supply chain," European Journal of Operational Research, Elsevier, vol. 162(2), pages 325-341, April.
  17. Patrik Alfredsson & Jos Verrijdt, 1999. "Modeling Emergency Supply Flexibility in a Two-Echelon Inventory System," Management Science, INFORMS, vol. 45(10), pages 1416-1431, October.
  18. Mehran Ullah & Biswajit Sarkar & Iqra Asghar, 2019. "Effects of Preservation Technology Investment on Waste Generation in a Two-Echelon Supply Chain Model," Mathematics, MDPI, vol. 7(2), pages 1-20, February.
  19. Buket Avci & Karan Girotra & Serguei Netessine, 2015. "Electric Vehicles with a Battery Switching Station: Adoption and Environmental Impact," Management Science, INFORMS, vol. 61(4), pages 772-794, April.
  20. Kouki, Chaaben & Arts, Joachim & Babai, M. Zied, 2024. "Performance evaluation of a two-echelon inventory system with network lost sales," European Journal of Operational Research, Elsevier, vol. 314(2), pages 647-664.
  21. Lau, Hoong Chuin & Song, Huawei & See, Chuen Teck & Cheng, Siew Yen, 2006. "Evaluation of time-varying availability in multi-echelon spare parts systems with passivation," European Journal of Operational Research, Elsevier, vol. 170(1), pages 91-105, April.
  22. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
  23. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
  24. Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
  25. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.
  26. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2019. "Emergency supply contracts for a service provider with limited local resources," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 445-460.
  27. Michael Lefew & Anh Ninh & Vladimir Anisimov, 2021. "End-to-End Drug Supply Management in Multicenter Trials," Methodology and Computing in Applied Probability, Springer, vol. 23(3), pages 695-709, September.
  28. Jérémie Gallien & Stephen C. Graves & Alan Scheller-Wolf, 2016. "OM Forum—Practice-Based Research in Operations Management: What It Is, Why Do It, Related Challenges, and How to Overcome Them," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 5-14, February.
  29. Graves, Stephen C. & Keilson, Julian., 1981. "System balance for extended logistic systems," Working papers 1253-81., Massachusetts Institute of Technology (MIT), Sloan School of Management.
  30. Morris A. Cohen & Yu-Sheng Zheng & Yunzeng Wang, 1999. "Identifying Opportunities for Improving Teradyne's Service-Parts Logistics System," Interfaces, INFORMS, vol. 29(4), pages 1-18, August.
  31. Dreyfuss, Michael & Giat, Yahel, 2017. "Optimal spares allocation to an exchangeable-item repair system with tolerable wait," European Journal of Operational Research, Elsevier, vol. 261(2), pages 584-594.
  32. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
  33. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
  34. Yazdekhasti, Amin & sharifzadeh, Shila & Ma, Junfeng, 2022. "A two-echelon two-indenture warranty distribution network development and optimization under batch-ordering inventory policy," International Journal of Production Economics, Elsevier, vol. 249(C).
  35. V. Radhamani & B. Sivakumar & G. Arivarignan, 2022. "A Comparative Study on Replenishment Policies for Perishable Inventory System with Service Facility and Multiple Server Vacation," OPSEARCH, Springer;Operational Research Society of India, vol. 59(1), pages 229-265, March.
  36. Gumus, Alev Taskin & Guneri, Ali Fuat & Ulengin, Fusun, 2010. "A new methodology for multi-echelon inventory management in stochastic and neuro-fuzzy environments," International Journal of Production Economics, Elsevier, vol. 128(1), pages 248-260, November.
  37. Jovan Grahovac & Amiya Chakravarty, 2001. "Sharing and Lateral Transshipment of Inventory in a Supply Chain with Expensive Low-Demand Items," Management Science, INFORMS, vol. 47(4), pages 579-594, April.
  38. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
  39. van Jaarsveld, W.L. & Dekker, R., 2010. "Integrating Reliability Centered Maintenance and Spare Parts Stock Control," Econometric Institute Research Papers EI 2010-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  40. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
  41. Moritz Fleischmann & Jo A. E. E. van Nunen & Ben Gräve, 2003. "Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM," Interfaces, INFORMS, vol. 33(6), pages 44-56, December.
  42. Yunzeng Wang & Morris A. Cohen & Yu-Sheng Zheng, 2000. "A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times," Management Science, INFORMS, vol. 46(11), pages 1441-1453, November.
  43. Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
  44. R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
  45. Yahel Giat, 2024. "Stock Levels and Repair Sourcing in a Periodic Review Exchangeable Item Repair System," Logistics, MDPI, vol. 8(2), pages 1-19, March.
  46. van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
  47. Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
  48. Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
  49. Girlich, Hans-Joachim, 1996. "Some comments on normal approximation for stochastic demand processes," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 389-395, August.
  50. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
  51. Hossein Abouee-Mehrizi & Opher Baron & Oded Berman, 2014. "Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities," Manufacturing & Service Operations Management, INFORMS, vol. 16(4), pages 561-577, October.
  52. de Haas, Harrie F. M. & Verrijdt, Jos H. C. M., 1997. "Target setting for the departments in an aircraft repairable item system," European Journal of Operational Research, Elsevier, vol. 99(3), pages 596-602, June.
  53. Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
  54. Olsson, Ralph J. & Hill, Roger M., 2007. "A two-echelon base-stock inventory model with Poisson demand and the sequential processing of orders at the upper echelon," European Journal of Operational Research, Elsevier, vol. 177(1), pages 310-324, February.
  55. Kleber, Rainer & Zanoni, Simone & Zavanella, Lucio, 2011. "On how buyback and remanufacturing strategies affect the profitability of spare parts supply chains," International Journal of Production Economics, Elsevier, vol. 133(1), pages 135-142, September.
  56. Araceli Zavala & David Nowicki & Jose Emmanuel Ramirez-Marquez, 2019. "Quantitative metrics to analyze supply chain resilience and associated costs," Journal of Risk and Reliability, , vol. 233(2), pages 186-199, April.
  57. Lode Li & Martin Shubik & Matthew J. Sobel, 2013. "Control of Dividends, Capital Subscriptions, and Physical Inventories," Management Science, INFORMS, vol. 59(5), pages 1107-1124, May.
  58. Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
  59. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
  60. Axsater, Sven & Juntti, Lars, 1996. "Comparison of echelon stock and installation stock policies for two-level inventory systems," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 303-310, August.
  61. Prak, Derk & Teunter, Rudolf & Babai, M. Z. & Syntetos, A. A. & Boylan, D, 2018. "Forecasting and Inventory Control with Compound Poisson Demand Using Periodic Demand Data," Research Report 2018010, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  62. Toptal, Ayşegül, 2012. "Integration of shipment scheduling decisions for forward and reverse channels in a recoverable item system," International Journal of Production Economics, Elsevier, vol. 140(1), pages 129-137.
  63. Kathryn E. Caggiano & Peter L. Jackson & John A. Muckstadt & James A. Rappold, 2007. "Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements," Operations Research, INFORMS, vol. 55(2), pages 303-318, April.
  64. Riccardo Patriarca & Tianya Hu & Francesco Costantino & Giulio Di Gravio & Massimo Tronci, 2019. "A System-Approach for Recoverable Spare Parts Management Using the Discrete Weibull Distribution," Sustainability, MDPI, vol. 11(19), pages 1-15, September.
  65. Tiacci, Lorenzo & Saetta, Stefano, 2011. "A heuristic for balancing the inventory level of different locations through lateral shipments," International Journal of Production Economics, Elsevier, vol. 131(1), pages 87-95, May.
  66. Klein Haneveld, Willem K. & Teunter, Ruud H., 1998. "Effects of discounting and demand rate variability on the EOQ," International Journal of Production Economics, Elsevier, vol. 54(2), pages 173-192, January.
  67. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
  68. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
  69. John Khawam & Warren H. Hausman & Dinah W. Cheng, 2007. "Warranty Inventory Optimization for Hitachi Global Storage Technologies, Inc," Interfaces, INFORMS, vol. 37(5), pages 455-471, October.
  70. Ashayeri, J. & Heuts, R.M.J. & Jansen, A. & Szczerba, B., 1994. "Inventory management of repairable service parts for personal computers : A case study," Other publications TiSEM 28578c62-2e4d-4345-929f-a, Tilburg University, School of Economics and Management.
  71. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
  72. K Sahyouni & R C Savaskan & M S Daskin, 2010. "The effect of lifetime buys on warranty repair operations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 790-803, May.
  73. Ganeshan, Ram, 1999. "Managing supply chain inventories: A multiple retailer, one warehouse, multiple supplier model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 341-354, March.
  74. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
  75. van Jaarsveld, W.L. & Dekker, R., 2009. "Risk-based stock decisions for projects," Econometric Institute Research Papers EI 2009-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  76. Kutanoglu, Erhan & Mahajan, Mohit, 2009. "An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels," European Journal of Operational Research, Elsevier, vol. 194(3), pages 728-742, May.
  77. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
  78. Usman Ali & Bashir Salah & Khawar Naeem & Abdul Salam Khan & Razaullah Khan & Catalin Iulian Pruncu & Muhammad Abas & Saadat Khan, 2020. "Improved MRO Inventory Management System in Oil and Gas Company: Increased Service Level and Reduced Average Inventory Investment," Sustainability, MDPI, vol. 12(19), pages 1-19, September.
  79. Chiang, Wei-yu Kevin, 2010. "Product availability in competitive and cooperative dual-channel distribution with stock-out based substitution," European Journal of Operational Research, Elsevier, vol. 200(1), pages 111-126, January.
  80. Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
  81. Erhun Özkan & Geert-Jan Houtum & Yasemin Serin, 2015. "A new approximate evaluation method for two-echelon inventory systems with emergency shipments," Annals of Operations Research, Springer, vol. 224(1), pages 147-169, January.
  82. Mustafa K. Doğru & Ulaş Özen, 2015. "Tactical Inventory Planning at Alcatel-Lucent’s Repair and Exchange Services," Interfaces, INFORMS, vol. 45(3), pages 228-242, June.
  83. T W Archibald, 2007. "Modelling replenishment and transshipment decisions in periodic review multilocation inventory systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 948-956, July.
  84. Fangruo Chen, 1999. "94%-Effective Policies for a Two-Stage Serial Inventory System with Stochastic Demand," Management Science, INFORMS, vol. 45(12), pages 1679-1696, December.
  85. van den Berg, D. & van der Heijden, M.C. & Schuur, P.C., 2016. "Allocating service parts in two-echelon networks at a utility company," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 58-67.
  86. Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.
  87. Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
  88. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
  89. Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
  90. Sheikh-Zadeh, Alireza & Rossetti, Manuel D., 2020. "Classification methods for problem size reduction in spare part provisioning," International Journal of Production Economics, Elsevier, vol. 219(C), pages 99-114.
  91. Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
  92. Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
  93. Sun, Bo & Sun, Xu & Tsang, Danny H.K. & Whitt, Ward, 2019. "Optimal battery purchasing and charging strategy at electric vehicle battery swap stations," European Journal of Operational Research, Elsevier, vol. 279(2), pages 524-539.
  94. Guillermo Gallego & Özalp Özer & Paul Zipkin, 2007. "Bounds, Heuristics, and Approximations for Distribution Systems," Operations Research, INFORMS, vol. 55(3), pages 503-517, June.
  95. Regattieri, A. & Giazzi, A. & Gamberi, M. & Gamberini, R., 2015. "An innovative method to optimize the maintenance policies in an aircraft: General framework and case study," Journal of Air Transport Management, Elsevier, vol. 44, pages 8-20.
  96. Olsson, Fredrik, 2010. "An inventory model with unidirectional lateral transshipments," European Journal of Operational Research, Elsevier, vol. 200(3), pages 725-732, February.
  97. Nitin Bakshi & Sang-Hyun Kim & Nicos Savva, 2015. "Signaling New Product Reliability with After-Sales Service Contracts," Management Science, INFORMS, vol. 61(8), pages 1812-1829, August.
  98. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
  99. Graves, Stephen C., 1989. "A multi-echelon inventory model with fixed reorder intervals," Working papers 3045-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
  100. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
  101. Joachim Arts & Rob Basten & Geert-Jan Van Houtum, 2016. "Repairable Stocking and Expediting in a Fluctuating Demand Environment: Optimal Policy and Heuristics," Operations Research, INFORMS, vol. 64(6), pages 1285-1301, December.
  102. Sun, Hao & Yang, Jun & Yang, Chao, 2019. "A robust optimization approach to multi-interval location-inventory and recharging planning for electric vehicles," Omega, Elsevier, vol. 86(C), pages 59-75.
  103. Wong, Hartanto & Cattrysse, Dirk & Van Oudheusden, Dirk, 2005. "Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments," European Journal of Operational Research, Elsevier, vol. 165(1), pages 207-218, August.
  104. Mauricio Varas & Franco Basso & Armin Lüer-Villagra & Alejandro Mac Cawley & Sergio Maturana, 2019. "Managing premium wines using an $$(s - 1,s)$$ ( s - 1 , s ) inventory policy: a heuristic solution approach," Annals of Operations Research, Springer, vol. 280(1), pages 351-376, September.
  105. Pourya Pourhejazy, 2020. "Destruction Decisions for Managing Excess Inventory in E-Commerce Logistics," Sustainability, MDPI, vol. 12(20), pages 1-12, October.
  106. Bazsa-Oldenkamp, E.M. & den Iseger, P., 2003. "A two level decentralized distribution system with compound renewal demand," Econometric Institute Research Papers EI 2002-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  107. Kent Everingham & Gary Polaski & Frederick Riedlin & Michael Shirk & Vinayak Deshpande & Ananth V. Iyer, 2008. "Operations Research Enhances Supply Chain Management at the US Coast Guard Aircraft Repair and Supply Center," Interfaces, INFORMS, vol. 38(1), pages 61-75, February.
  108. Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.
  109. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
  110. Mahadevan, B. & Pyke, David F. & Fleischmann, Moritz, 2003. "Periodic review, push inventory policies for remanufacturing," European Journal of Operational Research, Elsevier, vol. 151(3), pages 536-551, December.
  111. Thangam, A. & Uthayakumar, R., 2008. "A two-level supply chain with partial backordering and approximated Poisson demand," European Journal of Operational Research, Elsevier, vol. 187(1), pages 228-242, May.
  112. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
  113. Gérard P. Cachon, 2001. "Exact Evaluation of Batch-Ordering Inventory Policies in Two-Echelon Supply Chains with Periodic Review," Operations Research, INFORMS, vol. 49(1), pages 79-98, February.
  114. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
  115. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.
  116. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
  117. Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
  118. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine & Senthil Veeraraghavan, 2010. "Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems," Management Science, INFORMS, vol. 56(9), pages 1551-1567, September.
  119. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
  120. Wu, Yang & Wang, Ziyang & Yao, Jianming & Guo, Haixiang, 2023. "Joint decision of order allocation and lending in the multi-supplier scenario purchase order financing," International Journal of Production Economics, Elsevier, vol. 255(C).
  121. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
  122. Amin Yazdekhasti & Yahia Zare Mehrjardi, 2020. "Two-echelon three-indenture warranty distribution network: a hybrid branch and bound, Monte-Carlo approach," Operational Research, Springer, vol. 20(2), pages 1113-1158, June.
  123. Vinayak Deshpande & Morris A. Cohen & Karen Donohue, 2003. "An Empirical Study of Service Differentiation for Weapon System Service Parts," Operations Research, INFORMS, vol. 51(4), pages 518-530, August.
  124. Andersson, Jonas & Marklund, Johan, 2000. "Decentralized inventory control in a two-level distribution system," European Journal of Operational Research, Elsevier, vol. 127(3), pages 483-506, December.
  125. Liming Liu & Xiaoming Liu & David D. Yao, 2004. "Analysis and Optimization of a Multistage Inventory-Queue System," Management Science, INFORMS, vol. 50(3), pages 365-380, March.
  126. Andersson, Jonas & Melchiors, Philip, 2001. "A two-echelon inventory model with lost sales," International Journal of Production Economics, Elsevier, vol. 69(3), pages 307-315, February.
  127. Berling, Peter & Johansson, Lina & Marklund, Johan, 2023. "Controlling inventories in omni/multi-channel distribution systems with variable customer order-sizes," Omega, Elsevier, vol. 114(C).
  128. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
  129. Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
  130. Gabor, A.F. & Guang, Y. & Axsäter, S., 2014. "Comparison of two methods for customer differentiation," ERIM Report Series Research in Management ERS-2014-003-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  131. Hayya, Jack C. & Bagchi, Uttarayan & Ramasesh, Ranga, 2011. "Cost relationships in stochastic inventory systems: A simulation study of the (S, S-1, t=1) model," International Journal of Production Economics, Elsevier, vol. 130(2), pages 196-202, April.
  132. Yoon, Kyung Bok & Sohn, So Young, 2007. "Finding the optimal CSP inventory level for multi-echelon system in Air Force using random effects regression model," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1076-1085, August.
  133. Guillermo Gallego & Paul Zipkin, 1999. "Stock Positioning and Performance Estimation in Serial Production-Transportation Systems," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 77-88.
  134. Gérard P. Cachon, 2001. "Stock Wars: Inventory Competition in a Two-Echelon Supply Chain with Multiple Retailers," Operations Research, INFORMS, vol. 49(5), pages 658-674, October.
  135. Basten, R.J.I. & van Houtum, G.J., 2013. "Near-optimal heuristics to set base stock levels in a two-echelon distribution network," International Journal of Production Economics, Elsevier, vol. 143(2), pages 546-552.
  136. Alper Şen & Deepak Bhatia & Koray Doğan, 2010. "Applied Materials Uses Operations Research to Design Its Service and Parts Network," Interfaces, INFORMS, vol. 40(4), pages 253-266, August.
  137. Anil Kukreja & Charles P. Schmidt & David M. Miller, 2001. "Stocking Decisions for Low-Usage Items in a Multilocation Inventory System," Management Science, INFORMS, vol. 47(10), pages 1371-1383, October.
  138. Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
  139. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
  140. Al-Rifai, Mohammad H. & Rossetti, Manuel D., 2007. "An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 195-213, September.
  141. Amy Cohn, 2006. "Composite-variable modeling for service parts logistics," Annals of Operations Research, Springer, vol. 144(1), pages 17-32, April.
  142. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
  143. van Ooijen, Henny & Bertrand, J. Will M. & Buyukkaramikli, Nasuh C., 2019. "Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods," International Journal of Production Economics, Elsevier, vol. 208(C), pages 29-42.
  144. Gabor, Adriana F. & van Ommeren, Jan-Kees & Sleptchenko, Andrei, 2022. "An inventory model with discounts for omnichannel retailers of slow moving items," European Journal of Operational Research, Elsevier, vol. 300(1), pages 58-72.
  145. Haji, Rasoul & Neghab, Mohammadali Pirayesh & Baboli, Armand, 2009. "Introducing a new ordering policy in a two-echelon inventory system with Poisson demand," International Journal of Production Economics, Elsevier, vol. 117(1), pages 212-218, January.
  146. Van der Heide, G. & Van Foreest, N.D. & Roodbergen, K.J., 2018. "Optimizing stock levels for rental systems with a support warehouse and partial backordering," European Journal of Operational Research, Elsevier, vol. 265(1), pages 107-118.
  147. Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
  148. Berling, Peter & Marklund, Johan, 2013. "A model for heuristic coordination of real life distribution inventory systems with lumpy demand," European Journal of Operational Research, Elsevier, vol. 230(3), pages 515-526.
  149. Bazsa-Oldenkamp, E.M. & den Iseger, P., 2002. "A two level decentralized distribution system with compound renewal demand," Econometric Institute Research Papers EI 2002-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  150. Vinayak Deshpande & Ananth V. Iyer & Richard Cho, 2006. "Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies," Operations Research, INFORMS, vol. 54(6), pages 1028-1040, December.
  151. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
  152. B Desmet & E-H Aghezzaf & H Vanmaele, 2010. "A normal approximation model for safety stock optimization in a two-echelon distribution system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 156-163, January.
  153. R. Basten & J. Schutten & M. Heijden, 2009. "An efficient model formulation for level of repair analysis," Annals of Operations Research, Springer, vol. 172(1), pages 119-142, November.
  154. Jörg Rambau & Konrad Schade, 2014. "The stochastic guaranteed service model with recourse for multi-echelon warehouse management," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 79(3), pages 293-326, June.
  155. Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
  156. Gabor, A.F. & van Vianen, L.A. & Yang, G. & Axsäter, S., 2016. "Enabling customer satisfaction and stock reduction through service differentiation with response time guarantees," Econometric Institute Research Papers EI2016-13, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  157. Lina Johansson & Fredrik Olsson, 2017. "Quantifying sustainable control of inventory systems with non-linear backorder costs," Annals of Operations Research, Springer, vol. 259(1), pages 217-239, December.
  158. Dreyfuss, Michael & Giat, Yahel, 2019. "Allocating spares to maximize the window fill rate in a periodic review inventory system," International Journal of Production Economics, Elsevier, vol. 214(C), pages 151-162.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.