System balance for extended logistic systems
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
- Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
- V. Radhamani & B. Sivakumar & G. Arivarignan, 2022. "A Comparative Study on Replenishment Policies for Perishable Inventory System with Service Facility and Multiple Server Vacation," OPSEARCH, Springer;Operational Research Society of India, vol. 59(1), pages 229-265, March.
- Ashayeri, J. & Heuts, R.M.J. & Jansen, A. & Szczerba, B., 1994. "Inventory management of repairable service parts for personal computers : A case study," Other publications TiSEM 28578c62-2e4d-4345-929f-a, Tilburg University, School of Economics and Management.
- Sun, Hao & Yang, Jun & Yang, Chao, 2019. "A robust optimization approach to multi-interval location-inventory and recharging planning for electric vehicles," Omega, Elsevier, vol. 86(C), pages 59-75.
- Andersson, Jonas & Marklund, Johan, 2000. "Decentralized inventory control in a two-level distribution system," European Journal of Operational Research, Elsevier, vol. 127(3), pages 483-506, December.
- Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
- Gabor, A.F. & Guang, Y. & Axsäter, S., 2014. "Comparison of two methods for customer differentiation," ERIM Report Series Research in Management ERS-2014-003-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
- Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
- Kleber, Rainer & Zanoni, Simone & Zavanella, Lucio, 2011. "On how buyback and remanufacturing strategies affect the profitability of spare parts supply chains," International Journal of Production Economics, Elsevier, vol. 133(1), pages 135-142, September.
- Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
- Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
- Moritz Fleischmann & Jo A. E. E. van Nunen & Ben Gräve, 2003.
"Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM,"
Interfaces, INFORMS, vol. 33(6), pages 44-56, December.
- Fleischmann, M. & van Nunen, J.A.E.E. & Graeve, B., 2002. "Integrating Closed-loop Supply Chains and Spare Parts Management at IBM," ERIM Report Series Research in Management ERS-2002-107-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
- Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
- Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
- van Ooijen, Henny & Bertrand, J. Will M. & Buyukkaramikli, Nasuh C., 2019. "Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods," International Journal of Production Economics, Elsevier, vol. 208(C), pages 29-42.
- Guangyuan Yang & Rommert Dekker, 2010.
"Service Parts Inventory Control with Lateral Transshipment that takes Time,"
Tinbergen Institute Discussion Papers
10-025/4, Tinbergen Institute, revised 10 Mar 2010.
- Yang, G. & Dekker, R., 2010. "Service Parts Inventory Control with Lateral Transshipment that Takes Time," Econometric Institute Research Papers EI 2010-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Yu-kun Chen & Qi Gao & Xiao-bo Su & Shun Fang & Chi-ming Guo, 2018. "Research on optimization of spare parts inventory policy considering maintenance priority," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1336-1345, December.
More about this item
Keywords
HD28 .M414 no.1253-; 81;JEL classification:
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:mit:sloanp:2001. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: None (email available below). General contact details of provider: https://edirc.repec.org/data/ssmitus.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.