Consolidating spare parts for asset maintenance with additive manufacturing
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2018.11.007
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Geert-Jan van Houtum & Bram Kranenburg, 2015. "Spare Parts Inventory Control under System Availability Constraints," International Series in Operations Research and Management Science, Springer, edition 127, number 978-1-4899-7609-3, December.
- Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
- Jan Holmström & Matthias Holweg & Siavash H. Khajavi & Jouni Partanen, 2016. "The direct digital manufacturing (r)evolution: definition of a research agenda," Operations Management Research, Springer, vol. 9(1), pages 1-10, June.
- G. J. Van Houtum & W. H. M. Zijm, 2000. "On the relationship between cost and service models for general inventory systems," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 54(2), pages 127-147, July.
- Rainer Kleber & Tobias Schulz & Guido Voigt, 2009. "Dynamic buy-back for product recovery in end-of-life spare parts procurement," FEMM Working Papers 09026, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
- Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
- Johnson, Michael & Kirchain, Randolph, 2009. "Quantifying the effects of parts consolidation and development costs on material selection decisions: A process-based costing approach," International Journal of Production Economics, Elsevier, vol. 119(1), pages 174-186, May.
- Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
- John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
- David Elmakis & Anatoly Lisnianski, 2006. "Life cycle cost analysis: Actual problem in industrial management," Journal of Business Economics and Management, Taylor & Francis Journals, vol. 7(1), pages 5-8.
- Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
- Craig C. Sherbrooke, 1971. "An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System," Operations Research, INFORMS, vol. 19(3), pages 618-635, June.
- Weller, Christian & Kleer, Robin & Piller, Frank T., 2015. "Economic implications of 3D printing: Market structure models in light of additive manufacturing revisited," International Journal of Production Economics, Elsevier, vol. 164(C), pages 43-56.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Naghshineh, Bardia & Carvalho, Helena, 2022. "The implications of additive manufacturing technology adoption for supply chain resilience: A systematic search and review," International Journal of Production Economics, Elsevier, vol. 247(C).
- Li, Wei & Sun, Hui & Tong, Meng & Mustafee, Navonil & Koh, Lenny, 2024. "Customizing customization in a 3D printing-enabled hybrid manufacturing supply chain," International Journal of Production Economics, Elsevier, vol. 268(C).
- Sgarbossa, Fabio & Peron, Mirco & Lolli, Francesco & Balugani, Elia, 2021. "Conventional or additive manufacturing for spare parts management: An extensive comparison for Poisson demand," International Journal of Production Economics, Elsevier, vol. 233(C).
- Jimo, Ajeseun & Braziotis, Christos & Rogers, Helen & Pawar, Kulwant, 2022. "Additive manufacturing: A framework for supply chain configuration," International Journal of Production Economics, Elsevier, vol. 253(C).
- Kunovjanek, Maximilian & Wankmüller, Christian, 2021. "Containing the COVID-19 pandemic with drones - Feasibility of a drone enabled back-up transport system," Transport Policy, Elsevier, vol. 106(C), pages 141-152.
- Tava Lennon Olsen & Brian Tomlin, 2020. "Industry 4.0: Opportunities and Challenges for Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 22(1), pages 113-122, January.
- Marić, Josip & Opazo-Basáez, Marco & Vlačić, Božidar & Dabić, Marina, 2023.
"Innovation management of three-dimensional printing (3DP) technology: Disclosing insights from existing literature and determining future research streams,"
Technological Forecasting and Social Change, Elsevier, vol. 193(C).
- Josip Marić & M. Opazo-Basáez & B. Vlačić & M. Dabić, 2023. "Innovation Management of Three-Dimensional Printing (3DP) Technology: Disclosing Insights from Existing Literature and Determining Future Research Streams," Post-Print hal-04435561, HAL.
- Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
- Nazanin Hosseini Arian & Alireza Pooya & Fariborz Rahimnia & Ali Sibevei, 2021. "Assessment the effect of rapid prototyping implementation on supply chain sustainability: a system dynamics approach," Operations Management Research, Springer, vol. 14(3), pages 467-493, December.
- Alma van Oudheusden & Jeremy Faludi & Ruud Balkenende, 2024. "Facilitating the Production of 3D-Printed Spare Parts in the Design of Plastic Parts: A Design Requirement Review," Sustainability, MDPI, vol. 16(21), pages 1-32, October.
- Beltagui, Ahmad & Kunz, Nathan & Gold, Stefan, 2020. "The role of 3D printing and open design on adoption of socially sustainable supply chain innovation," International Journal of Production Economics, Elsevier, vol. 221(C).
- Areej Althabatah & Mohammed Yaqot & Brenno Menezes & Laoucine Kerbache, 2023. "Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes," Logistics, MDPI, vol. 7(3), pages 1-40, September.
- Foshammer, Jeppe & Søberg, Peder Veng & Helo, Petri & Ituarte, Iñigo Flores, 2022. "Identification of aftermarket and legacy parts suitable for additive manufacturing: A knowledge management-based approach," International Journal of Production Economics, Elsevier, vol. 253(C).
- Robert B. Handfield & James Aitken & Neil Turner & Tillmann Boehme & Cecil Bozarth, 2022. "Assessing Adoption Factors for Additive Manufacturing: Insights from Case Studies," Logistics, MDPI, vol. 6(2), pages 1-22, June.
- Sun, Luoyi & Hua, Guowei & Cheng, T.C.E. & Wang, Yixiao, 2020. "How to price 3D-printed products? Pricing strategy for 3D printing platforms," International Journal of Production Economics, Elsevier, vol. 226(C).
- Sheng Yang & Thomas Page & Ying Zhang & Yaoyao Fiona Zhao, 2020. "Towards an automated decision support system for the identification of additive manufacturing part candidates," Journal of Intelligent Manufacturing, Springer, vol. 31(8), pages 1917-1933, December.
- Beltagui, Ahmad & Gold, Stefan & Kunz, Nathan & Reiner, Gerald, 2023. "Special Issue: Rethinking operations and supply chain management in light of the 3D printing revolution," International Journal of Production Economics, Elsevier, vol. 255(C).
- Sun, Mingyao & Ng, Chi To & Yang, Liu & Zhang, Tianhua, 2024. "Optimal after-sales service offering strategy: Additive manufacturing, traditional manufacturing, or hybrid?," International Journal of Production Economics, Elsevier, vol. 268(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
- Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
- Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
- Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
- Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
- Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
- Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
- Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
- Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
- Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
- R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
- Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
- Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
- Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
- David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
- Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
- Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
More about this item
Keywords
Consolidation; Capital goods; Spare parts; Digital manufacturing; 3D printing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:269-280. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.