IDEAS home Printed from https://ideas.repec.org/a/eee/jaitra/v44-45y2015ip8-20.html
   My bibliography  Save this article

An innovative method to optimize the maintenance policies in an aircraft: General framework and case study

Author

Listed:
  • Regattieri, A.
  • Giazzi, A.
  • Gamberi, M.
  • Gamberini, R.

Abstract

Maintenance policies applied to aircrafts are governed by a mix of airworthiness authorities’ regulations and choices of suppliers and users. This allows airlines to use different strategies to minimize the total costs of maintenance. In this paper, a new approach that integrates the failure and reparation processes, such as modelling, optimization algorithms, and simulation methods, is proposed to define the best maintenance strategies for complex systems.

Suggested Citation

  • Regattieri, A. & Giazzi, A. & Gamberi, M. & Gamberini, R., 2015. "An innovative method to optimize the maintenance policies in an aircraft: General framework and case study," Journal of Air Transport Management, Elsevier, vol. 44, pages 8-20.
  • Handle: RePEc:eee:jaitra:v:44-45:y:2015:i::p:8-20
    DOI: 10.1016/j.jairtraman.2015.02.001
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0969699715000071
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.jairtraman.2015.02.001?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kutanoglu, Erhan & Mahajan, Mohit, 2009. "An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels," European Journal of Operational Research, Elsevier, vol. 194(3), pages 728-742, May.
    2. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    3. Regattieri, A. & Gamberi, M. & Gamberini, R. & Manzini, R., 2005. "Managing lumpy demand for aircraft spare parts," Journal of Air Transport Management, Elsevier, vol. 11(6), pages 426-431.
    4. Fritzsche, R. & Gupta, J.N.D. & Lasch, R., 2014. "Optimal prognostic distance to minimize total maintenance cost: The case of the airline industry," International Journal of Production Economics, Elsevier, vol. 151(C), pages 76-88.
    5. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    6. Maurizio Faccio & Alessandro Persona & Hoang Pham & Alberto Regattieri, 2010. "Modelling the spare parts stock levels and its applications in industrial systems," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 9(1), pages 39-64.
    7. Wu, Cheng-Lung & Caves, Robert E, 2000. "Aircraft operational costs and turnaround efficiency at airports," Journal of Air Transport Management, Elsevier, vol. 6(4), pages 201-208.
    8. Moudani, Walid El & Mora-Camino, Félix, 2000. "A dynamic approach for aircraft assignment and maintenance scheduling by airlines," Journal of Air Transport Management, Elsevier, vol. 6(4), pages 233-237.
    9. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
    10. Robin P. Nicolai & Rommert Dekker, 2008. "Optimal Maintenance of Multi-component Systems: A Review," Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 11, pages 263-286, Springer.
    11. Ghobbar, Adel A. & Friend, Chris H., 2004. "The material requirements planning system for aircraft maintenance and inventory control: a note," Journal of Air Transport Management, Elsevier, vol. 10(3), pages 217-221.
    12. Gribkovskaia, Irina & Halskau, Oyvind sr. & Laporte, Gilbert & Vlcek, Martin, 2007. "General solutions to the single vehicle routing problem with pickups and deliveries," European Journal of Operational Research, Elsevier, vol. 180(2), pages 568-584, July.
    13. L. W. Clarke & C. A. Hane & E. L. Johnson & G. L. Nemhauser, 1996. "Maintenance and Crew Considerations in Fleet Assignment," Transportation Science, INFORMS, vol. 30(3), pages 249-260, August.
    14. Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
    15. Riccardo Manzini & Alberto Regattieri & Hoang Pham & Emilio Ferrari, 2010. "Maintenance for Industrial Systems," Springer Series in Reliability Engineering, Springer, number 978-1-84882-575-8, March.
    16. ten Wolde, Mike & Ghobbar, Adel A., 2013. "Optimizing inspection intervals—Reliability and availability in terms of a cost model: A case study on railway carriers," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 137-147.
    17. Lee, Loo Hay & Chew, Ek Peng & Teng, Suyan & Chen, Yankai, 2008. "Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem," European Journal of Operational Research, Elsevier, vol. 189(2), pages 476-491, September.
    18. Patrik Alfredsson & Jos Verrijdt, 1999. "Modeling Emergency Supply Flexibility in a Two-Echelon Inventory System," Management Science, INFORMS, vol. 45(10), pages 1416-1431, October.
    19. Sriram, Chellappan & Haghani, Ali, 2003. "An optimization model for aircraft maintenance scheduling and re-assignment," Transportation Research Part A: Policy and Practice, Elsevier, vol. 37(1), pages 29-48, January.
    20. Daria Battini & Maurizio Faccio & Alessandro Persona & Alberto Regattieri, 2013. "Buffer design for availability: a new simulative study in case of infant and random failures," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 14(2), pages 157-174.
    21. Ghobbar, A.A & Friend, C.H, 2002. "Sources of intermittent demand for aircraft spare parts within airline operations," Journal of Air Transport Management, Elsevier, vol. 8(4), pages 221-231.
    22. Cobb, Richard, 1995. "Modeling aircraft repair turntime," Journal of Air Transport Management, Elsevier, vol. 2(1), pages 25-32.
    23. Yang, Ta-Hui & Yan, Shangyao & Chen, Hsuan-Hung, 2003. "An airline maintenance manpower planning model with flexible strategies," Journal of Air Transport Management, Elsevier, vol. 9(4), pages 233-239.
    24. Regattieri, A. & Manzini, R. & Battini, D., 2010. "Estimating reliability characteristics in the presence of censored data: A case study in a light commercial vehicle manufacturing system," Reliability Engineering and System Safety, Elsevier, vol. 95(10), pages 1093-1102.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alam, Muhammad Aftab, 2016. "Techno-stress and productivity: Survey evidence from the aviation industry," Journal of Air Transport Management, Elsevier, vol. 50(C), pages 62-70.
    2. Giacomo Barbieri & Jose Daniel Hernandez, 2024. "Sustainability Indices and RAM Analysis for Maintenance Decision Making Considering Environmental Sustainability," Sustainability, MDPI, vol. 16(3), pages 1-23, January.
    3. Syan, Chanan S. & Ramsoobag, Geeta, 2019. "Maintenance applications of multi-criteria optimization: A review," Reliability Engineering and System Safety, Elsevier, vol. 190(C), pages 1-1.
    4. Ágota Bányai, 2021. "Energy Consumption-Based Maintenance Policy Optimization," Energies, MDPI, vol. 14(18), pages 1-33, September.
    5. Machado, Marcio Cardoso & Gomes Eller Araújo, Michelle Aparecida & Soto Urbina, Ligia Maria & Macau, Flavio Romero, 2016. "A qualitative study of outsourced aeronautical maintenance: The case of Brazilian organizations," Journal of Air Transport Management, Elsevier, vol. 55(C), pages 176-184.
    6. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
    2. Petchrompo, Sanyapong & Parlikad, Ajith Kumar, 2019. "A review of asset management literature on multi-asset systems," Reliability Engineering and System Safety, Elsevier, vol. 181(C), pages 181-201.
    3. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    4. N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.
    5. Sciau, Jean-Baptiste & Goyon, Agathe & Sarazin, Alexandre & Bascans, Jérémy & Prud’homme, Charles & Lorca, Xavier, 2024. "Using constraint programming to address the operational aircraft line maintenance scheduling problem," Journal of Air Transport Management, Elsevier, vol. 115(C).
    6. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    7. van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
    8. Gu, Jingyao & Zhang, Guoqing & Li, Kevin W., 2015. "Efficient aircraft spare parts inventory management under demand uncertainty," Journal of Air Transport Management, Elsevier, vol. 42(C), pages 101-109.
    9. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    10. Nima Safaei & Dragan Banjevic & Andrew Jardine, 2011. "Workforce-constrained maintenance scheduling for military aircraft fleet: a case study," Annals of Operations Research, Springer, vol. 186(1), pages 295-316, June.
    11. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    12. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    13. Safaei, Nima & Jardine, Andrew K.S., 2018. "Aircraft routing with generalized maintenance constraints," Omega, Elsevier, vol. 80(C), pages 111-122.
    14. Deng, Qichen & Santos, Bruno F., 2022. "Lookahead approximate dynamic programming for stochastic aircraft maintenance check scheduling optimization," European Journal of Operational Research, Elsevier, vol. 299(3), pages 814-833.
    15. Oliver Faust & Jochen Gönsch & Robert Klein, 2017. "Demand-Oriented Integrated Scheduling for Point-to-Point Airlines," Transportation Science, INFORMS, vol. 51(1), pages 196-213, February.
    16. Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
    17. Gabor, A.F. & Guang, Y. & Axsäter, S., 2014. "Comparison of two methods for customer differentiation," ERIM Report Series Research in Management ERS-2014-003-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    18. Lu, Biao & Zhou, Xiaojun, 2017. "Opportunistic preventive maintenance scheduling for serial-parallel multistage manufacturing systems with multiple streams of deterioration," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 116-127.
    19. Dilaver, Halit Metehan & Akçay, Alp & van Houtum, Geert-Jan, 2023. "Integrated planning of asset-use and dry-docking for a fleet of maritime assets," International Journal of Production Economics, Elsevier, vol. 256(C).
    20. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jaitra:v:44-45:y:2015:i::p:8-20. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/journal-of-air-transport-management/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.