IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v189y2019icp445-460.html
   My bibliography  Save this article

Emergency supply contracts for a service provider with limited local resources

Author

Listed:
  • Rahimi-Ghahroodi, S.
  • Al Hanbali, A.
  • Zijm, W.H.M.
  • Timmer, J.B.

Abstract

We study a problem faced by a service provider, who is responsible for the repair of a group of assets subject to random failures. In case of a failure, both an engineer and a spare part of the right kind need to be available to carry out the repair. A limited number of engineers are employed while also stocks of the various spare parts are limited. In case any resource (engineer or spare part) is not immediately available, the service provider may follow a full backlogging policy. Alternatively, in case of spare parts stock out, he has the option to revert to an emergency supplier with ample capacity of resources. We present an original model to analyze the problem dynamics between this service provider and the emergency supplier. Especially, we determine the optimal emergency shipment cost and the optimal multi-resource level of the service provider. To this end, we propose a computationally efficient algorithm to find the Stackelberg equilibrium. Furthermore, we design a revenue-sharing cooperative contract between these players which always results in coordination. Finally, we examine the risk of uncertainties in such a contract and find the optimal contract parameters by considering the utility functions of the players.

Suggested Citation

  • Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2019. "Emergency supply contracts for a service provider with limited local resources," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 445-460.
  • Handle: RePEc:eee:reensy:v:189:y:2019:i:c:p:445-460
    DOI: 10.1016/j.ress.2019.04.027
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832018308883
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2019.04.027?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Defever, Fabrice & Imbruno, Michele & Kneller, Richard, 2020. "Trade liberalization, input intermediaries and firm productivity: Evidence from China," Journal of International Economics, Elsevier, vol. 126(C).
    2. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    3. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    4. Wang, Wenbin, 2010. "A model for maintenance service contract design, negotiation and optimization," European Journal of Operational Research, Elsevier, vol. 201(1), pages 239-246, February.
    5. Jackson, Canek & Pascual, Rodrigo, 2008. "Optimal maintenance service contract negotiation with aging equipment," European Journal of Operational Research, Elsevier, vol. 189(2), pages 387-398, September.
    6. Jose A. Guajardo & Morris A. Cohen & Sang-Hyun Kim & Serguei Netessine, 2012. "Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis," Management Science, INFORMS, vol. 58(5), pages 961-979, May.
    7. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
    8. Esmaeili, M. & Shamsi Gamchi, N. & Asgharizadeh, E., 2014. "Three-level warranty service contract among manufacturer, agent and customer: A game-theoretical approach," European Journal of Operational Research, Elsevier, vol. 239(1), pages 177-186.
    9. Liangpeng Chen & Zhi-Sheng Ye & Min Xie, 2013. "JOINT MAINTENANCE AND SPARE COMPONENT PROVISIONING POLICY FOR k-OUT-OF-n SYSTEMS," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 30(06), pages 1-21.
    10. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    11. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    12. Spyros Galanis, 2021. "Speculative trade and the value of public information," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 23(1), pages 53-68, February.
    13. Chun-Hung Chiu & Tsan-Ming Choi, 2016. "Supply chain risk analysis with mean-variance models: a technical review," Annals of Operations Research, Springer, vol. 240(2), pages 489-507, May.
    14. Murthy, D. N. P. & Asgharizadeh, E., 1999. "Optimal decision making in a maintenance service operation," European Journal of Operational Research, Elsevier, vol. 116(2), pages 259-273, July.
    15. Kashi R. Balachandran & Suresh Radhakrishnan, 2005. "Quality Implications of Warranties in a Supply Chain," Management Science, INFORMS, vol. 51(8), pages 1266-1277, August.
    16. Rodrigo Pascual & Gabriel Santelices & Haitao Liao & Sergio Maturana, 2016. "Channel coordination on fixed-term maintenance outsourcing contracts," IISE Transactions, Taylor & Francis Journals, vol. 48(7), pages 651-660, July.
    17. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    18. Wang, Ling & Chu, Jian & Mao, Weijie, 2009. "A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure," European Journal of Operational Research, Elsevier, vol. 194(1), pages 184-205, April.
    19. Galanis, S. & Ioannou, C. & Kotronis, S., 2019. "Information Aggregation Under Ambiguity: Theory and Experimental Evidence," Working Papers 20/05, Department of Economics, City University London.
    20. Paul Levine & Joseph Pearlman & Stephen Wright & Bo Yang, 2019. "Information, VARs and DSGE Models," School of Economics Discussion Papers 1619, School of Economics, University of Surrey.
    21. Moura, Márcio das Chagas & Santana, João Mateus & Droguett, Enrique López & Lins, Isis Didier & Guedes, Bruno Nunes, 2017. "Analysis of extended warranties for medical equipment: A Stackelberg game model using priority queues," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 338-354.
    22. Frank Karsten & Marco Slikker & Geert‐Jan van Houtum, 2012. "Inventory pooling games for expensive, low‐demand spare parts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(5), pages 311-324, August.
    23. Darghouth, M.N. & Ait-kadi, D. & Chelbi, A., 2017. "Joint optimization of design, warranty and price for products sold with maintenance service contracts," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 197-208.
    24. Godoy, David R. & Pascual, Rodrigo & Knights, Peter, 2014. "A decision-making framework to integrate maintenance contract conditions with critical spares management," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 102-108.
    25. Tsan-Ming Choi & Stein W Wallace & Yulan Wang, 2016. "Risk management and coordination in service supply chains: information, logistics and outsourcing," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(2), pages 159-164, February.
    26. William Karush, 1957. "A Queuing Model for an Inventory Problem," Operations Research, INFORMS, vol. 5(5), pages 693-703, October.
    27. Kostas Selviaridis & Finn Wynstra, 2015. "Performance-based contracting: a literature review and future research directions," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3505-3540, June.
    28. Mamageishvili, A. & Schlegel, J. C., 2019. "Optimal Smart Contracts with Costly Verification," Working Papers 19/13, Department of Economics, City University London.
    29. Kunter, Marcus, 2012. "Coordination via cost and revenue sharing in manufacturer–retailer channels," European Journal of Operational Research, Elsevier, vol. 216(2), pages 477-486.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2020. "Multi-resource emergency supply contracts with asymmetric information in the after-sales services," International Journal of Production Economics, Elsevier, vol. 229(C).
    2. Yonit Barron & Chananel Benshimol, 2024. "Emergency Supply Alternatives for a Storage Facility of a Repairable Multi-Component System," Mathematics, MDPI, vol. 12(17), pages 1-37, August.
    3. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    4. Zhu, Sha & van Jaarsveld, Willem & Dekker, Rommert, 2022. "Critical project planning and spare parts inventory management in shutdown maintenance," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    5. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    6. Wang, Qingwei & Zheng, Meimei & Lee, Ka-Man & Shi, Xiaoqian & Shen, Yichi & Pan, Ershun, 2024. "Optimal product and after-sales service decisions considering risk attitudes under price-dependent uncertain demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 182(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    2. Jackson, Canek & Pascual, Rodrigo & Mac Cawley, Alejandro & Godoy, Sergio, 2023. "Product–service system negotiation in aircraft lease contracts with option of disagreement," Journal of Air Transport Management, Elsevier, vol. 107(C).
    3. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    4. Liu, Changqing & He, Yigang & Peng, Guanghan, 2019. "The stabilization effect of self-delayed flux integral for two-lane lattice hydrodynamic model," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 535(C).
    5. Torres-Vargas, G. & Fossion, R. & Méndez-Bermúdez, J.A., 2020. "Normal mode analysis of spectra of random networks," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 545(C).
    6. Aldakheel, F. & Ismail, M.S. & Hughes, K.J. & Ingham, D.B. & Ma, L. & Pourkashanian, M. & Cumming, D. & Smith, R., 2020. "Gas permeability, wettability and morphology of gas diffusion layers before and after performing a realistic ex-situ compression test," Renewable Energy, Elsevier, vol. 151(C), pages 1082-1091.
    7. Zhu, Wen-Xing & Zhang, Jing-Yu & Song, Ze-Rui, 2019. "Study on braking process of vehicles at the signalized intersection based on car-following theory," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 523(C), pages 1306-1314.
    8. Borjas, George J. & Cassidy, Hugh, 2019. "The wage penalty to undocumented immigration," Labour Economics, Elsevier, vol. 61(C).
    9. Birol, Fatih & Okogu, Bright E., 1997. "Purchasing-Power-Parity (PPP) approach to energy-efficiency measurement: Implications for energy and environmental policy," Energy, Elsevier, vol. 22(1), pages 7-16.
    10. Sen, Parongama, 2020. "Scaling and crossover behaviour in a truncated long range quantum walk," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 545(C).
    11. Gargiulo, Nicola & Peluso, Antonio & Aprea, Paolo & Marino, Ottavio & Cioffi, Raffaele & Jannelli, Elio & Cimino, Stefano & Lisi, Luciana & Caputo, Domenico, 2019. "Chromium-based MIL-101 metal organic framework as a fully regenerable D4 adsorbent for biogas purification," Renewable Energy, Elsevier, vol. 138(C), pages 230-235.
    12. Vilela, André L.M. & Wang, Chao & Nelson, Kenric P. & Stanley, H. Eugene, 2019. "Majority-vote model for financial markets," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 515(C), pages 762-770.
    13. Dutton, Hilary & Deane, Kelsey L. & Bullen, Pat, 2020. "Opening up: An exploration of youth mentor self-disclosure using laboratory-based direct observation," Children and Youth Services Review, Elsevier, vol. 108(C).
    14. Charness, Gary & List, John A. & Rustichini, Aldo & Samek, Anya & Van De Ven, Jeroen, 2019. "Theory of mind among disadvantaged children: Evidence from a field experiment," Journal of Economic Behavior & Organization, Elsevier, vol. 166(C), pages 174-194.
    15. Wu, Jing Cynthia & Zhang, Ji, 2019. "A shadow rate New Keynesian model," Journal of Economic Dynamics and Control, Elsevier, vol. 107(C), pages 1-1.
    16. Murray, Jean P. & Steinfeld, Aldo & Fletcher, Edward A., 1995. "Metals, nitrides, and carbides via solar carbothermal reduction of metal oxides," Energy, Elsevier, vol. 20(7), pages 695-704.
    17. Li, Zhiyu & Xu, Xiwei & Jiang, Enchen & Han, Ping & Sun, Yan & Zhou, Ling & Zhong, Peidong & Fan, Xudong, 2020. "Alkane from hydrodeoxygenation (HDO) combined with in-situ multistage condensation of biomass continuous pyrolysis bio-oil via mixed supports catalyst Ni/HZSM-5-γ-Al2O3," Renewable Energy, Elsevier, vol. 149(C), pages 535-548.
    18. Bistline, John & Santen, Nidhi & Young, David, 2019. "The economic geography of variable renewable energy and impacts of trade formulations for renewable mandates," Renewable and Sustainable Energy Reviews, Elsevier, vol. 106(C), pages 79-96.
    19. Mershon, Carol, 2020. "What effect do local political elites have on infant and child death? Elected and chiefly authority in South Africa," Social Science & Medicine, Elsevier, vol. 251(C).
    20. Salo, Sonja & Jokisalo, Juha & Syri, Sanna & Kosonen, Risto, 2019. "Individual temperature control on demand response in a district heated office building in Finland," Energy, Elsevier, vol. 180(C), pages 946-954.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:189:y:2019:i:c:p:445-460. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.