IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v184y2017icp131-140.html
   My bibliography  Save this article

A heuristic stock allocation rule for repairable service parts

Author

Listed:
  • Rezaei Somarin, Aghil
  • Chen, Songlin
  • Asian, Sobhan
  • Wang, David Z.W.

Abstract

In the present work, we investigate a repairable service parts inventory system that has a central repair facility and several locations storing inventory called bases. If a part fails, then the failed part is identified and replaced with a ready-to-use part from the base. Afterwards, the failed part is sent to the repair facility, where it is repaired and allocated to one of the bases, with the objective being to identify the base with the most urgent need of a service part to minimize the expected backorder cost. To achieve this, we examine the initial base-stock provisioning problem in conjunction with real time stock allocation decision making. By modeling the problem as a Markov decision process, we characterize the optimal solution for each decision and prove that identifying the optimal policy for one of the decisions leads to the optimal solution for the other. Considering the computational intensity of the multi-base problem, we propose a heuristic technique for the stock allocation problem based on relative value function and average backorder cost at a single base. Further, we compare the performance of the heuristic model with the myopic policy, which is widely applied in the literature, to validate the efficiency of our proposed heuristic. A sensitivity analysis is carried out to illustrate the effects of important problem parameters on the performance of the presented heuristic. Results reveal that the proposed stock allocation policy outperforms the myopic policy.

Suggested Citation

  • Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
  • Handle: RePEc:eee:proeco:v:184:y:2017:i:c:p:131-140
    DOI: 10.1016/j.ijpe.2016.11.013
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731630336X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2016.11.013?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. Seifert, Ralf W. & Tancrez, Jean-Sébastien & Biçer, Işık, 2016. "Dynamic product portfolio management with life cycle considerations," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 71-83.
    3. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    4. Tai, Allen H. & Ching, Wai-Ki, 2014. "Optimal inventory policy for a Markovian two-echelon system with returns and lateral transshipment," International Journal of Production Economics, Elsevier, vol. 151(C), pages 48-55.
    5. Agnes Peña Perez & Paul Zipkin, 1997. "Dynamic Scheduling Rules for a Multiproduct Make-to-Stock Queue," Operations Research, INFORMS, vol. 45(6), pages 919-930, December.
    6. Zhu, Han & Liu, Xing & Chen, Youhua (Frank), 2015. "Effective inventory control policies with a minimum order quantity and batch ordering," International Journal of Production Economics, Elsevier, vol. 168(C), pages 21-30.
    7. Hahn, G.J. & Leucht, A., 2015. "Managing inventory systems of slow-moving items," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 543-550.
    8. Francis De Vericourt & Fikri Karaesmen & Yves Dallery, 2000. "Dynamic Scheduling in a Make-to-Stock System: A Partial Characterization of Optimal Policies," Operations Research, INFORMS, vol. 48(5), pages 811-819, October.
    9. Han, Guanghua & Dong, Ming & Liu, Shaoxuan, 2014. "Yield and allocation management in a continuous make-to-stock system with demand upgrade substitution," International Journal of Production Economics, Elsevier, vol. 156(C), pages 124-131.
    10. Michael H. Veatch & Lawrence M. Wein, 1996. "Scheduling a Make-To-Stock Queue: Index Policies and Hedging Points," Operations Research, INFORMS, vol. 44(4), pages 634-647, August.
    11. Albert Y. Ha, 1997. "Optimal Dynamic Scheduling Policy for a Make-To-Stock Production System," Operations Research, INFORMS, vol. 45(1), pages 42-53, February.
    12. Rego, José Roberto do & Mesquita, Marco Aurélio de, 2015. "Demand forecasting and inventory control: A simulation study on automotive spare parts," International Journal of Production Economics, Elsevier, vol. 161(C), pages 1-16.
    13. Avishai Mandelbaum & Alexander L. Stolyar, 2004. "Scheduling Flexible Servers with Convex Delay Costs: Heavy-Traffic Optimality of the Generalized cμ-Rule," Operations Research, INFORMS, vol. 52(6), pages 836-855, December.
    14. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    15. R. M. Simon, 1971. "Stationary Properties of a Two-Echelon Inventory Model for Low Demand Items," Operations Research, INFORMS, vol. 19(3), pages 761-773, June.
    16. Lawrence M. Wein, 1992. "Dynamic Scheduling of a Multiclass Make-to-Stock Queue," Operations Research, INFORMS, vol. 40(4), pages 724-735, August.
    17. Calle, Marcos & González-R, Pedro L. & Leon, Jose M. & Pierreval, Henri & Canca, David, 2016. "Integrated management of inventory and production systems based on floating decoupling point and real-time information: A simulation based analysis," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 48-57.
    18. Awi Federgruen & Paul Zipkin, 1984. "Approximations of Dynamic, Multilocation Production and Inventory Problems," Management Science, INFORMS, vol. 30(1), pages 69-84, January.
    19. David F. Pyke, 1990. "Priority repair and dispatch policies for reparable‐item logistics systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(1), pages 1-30, February.
    20. Buyukkurt, M. Demirbag & Parlar, M., 1993. "A comparison of allocation policies in a two-echelon repairable-item inventory model," International Journal of Production Economics, Elsevier, vol. 29(3), pages 291-302, May.
    21. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    22. Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
    23. Antony Svoronos & Paul Zipkin, 1991. "Evaluation of One-for-One Replenishment Policies for Multiechelon Inventory Systems," Management Science, INFORMS, vol. 37(1), pages 68-83, January.
    24. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    25. Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
    26. Bruce L. Miller, 1974. "Dispatching from Depot Repair in a Recoverable Item Inventory System: On the Optimality of a Heuristic Rule," Management Science, INFORMS, vol. 21(3), pages 316-325, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sanjoy Kumar Paul & Sobhan Asian & Mark Goh & S. Ali Torabi, 2019. "Managing sudden transportation disruptions in supply chains under delivery delay and quantity loss," Annals of Operations Research, Springer, vol. 273(1), pages 783-814, February.
    2. Choi, Tsan-Ming & Chen, Yue & Chung, Sai Ho, 2019. "Online-offline fashion franchising supply chains without channel conflicts: Choices on postponement and contracts," International Journal of Production Economics, Elsevier, vol. 215(C), pages 174-184.
    3. Somarin, Aghil Rezaei & Sharma, Pankaj & Tiwari, Sunil & Chen, Songlin, 2023. "Stock reallocation policy for repairable service parts in case of supply disruptions due to extreme weather events," International Journal of Production Economics, Elsevier, vol. 256(C).
    4. Tavakoli Kafiabad, Shayan & Zanjani, Masoumeh Kazemi & Nourelfath, Mustapha, 2022. "Robust collaborative maintenance logistics network design and planning," International Journal of Production Economics, Elsevier, vol. 244(C).
    5. Asadi, Amin & Nurre Pinkley, Sarah, 2021. "A stochastic scheduling, allocation, and inventory replenishment problem for battery swap stations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    6. Dawei Lu & Yi Ding & Sobhan Asian & Sanjoy Kumar Paul, 2018. "From Supply Chain Integration to Operational Performance: The Moderating Effect of Market Uncertainty," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(1), pages 3-20, March.
    7. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    8. Mina Rahimi & Ashkan Hafezalkotob & Sobhan Asian & Luis Martínez, 2021. "Environmental Policy Making in Supply Chains under Ambiguity and Competition: A Fuzzy Stackelberg Game Approach," Sustainability, MDPI, vol. 13(4), pages 1-24, February.
    9. Hasti Seraji & Reza Tavakkoli-Moghaddam & Sobhan Asian & Harpreet Kaur, 2022. "An integrative location-allocation model for humanitarian logistics with distributive injustice and dissatisfaction under uncertainty," Annals of Operations Research, Springer, vol. 319(1), pages 211-257, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    3. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    4. Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.
    5. Hossein Abouee-Mehrizi & Opher Baron & Oded Berman, 2014. "Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities," Manufacturing & Service Operations Management, INFORMS, vol. 16(4), pages 561-577, October.
    6. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.
    7. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    8. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    9. Yunzeng Wang & Morris A. Cohen & Yu-Sheng Zheng, 2000. "A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times," Management Science, INFORMS, vol. 46(11), pages 1441-1453, November.
    10. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    11. Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
    12. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    13. Graves, Stephen C., 1989. "A multi-echelon inventory model with fixed reorder intervals," Working papers 3045-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    14. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
    15. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
    16. José Niño-Mora, 2006. "Restless Bandit Marginal Productivity Indices, Diminishing Returns, and Optimal Control of Make-to-Order/Make-to-Stock M/G/1 Queues," Mathematics of Operations Research, INFORMS, vol. 31(1), pages 50-84, February.
    17. Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
    18. Ioannis Ch. Paschalidis & Yong Liu, 2003. "Large Deviations-Based Asymptotics for Inventory Control in Supply Chains," Operations Research, INFORMS, vol. 51(3), pages 437-460, June.
    19. Bora Kat & Zeynep Avṣar, 2011. "Using aggregate fill rate for dynamic scheduling of multi-class systems," Annals of Operations Research, Springer, vol. 182(1), pages 87-117, January.
    20. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:184:y:2017:i:c:p:131-140. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.