IDEAS home Printed from https://ideas.repec.org/a/eee/jaitra/v57y2016icp206-216.html
   My bibliography  Save this article

Inventory optimization for a customer airline in a Performance Based Contract

Author

Listed:
  • Patriarca, Riccardo
  • Costantino, Francesco
  • Di Gravio, Giulio
  • Tronci, Massimo

Abstract

The supply of spare parts has a crucial role in the aviation sector, mainly due to the high costs of spare parts and to the strict availability requirements. In a stand-alone scenario, an airline owns the spare parts and manages the maintenance tasks by itself. A new trend consists of not owning the spare parts and delegate the maintenance tasks to an external company, taking advantage of a specific Performance Based Contract (PBC). The PBCs aim to reduce the ownership cost for the customer airline, while ensuring a target system performance. Spare parts become a variable cost for the customer airline and a business income for the maintenance supplier, which is commonly another airline.

Suggested Citation

  • Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
  • Handle: RePEc:eee:jaitra:v:57:y:2016:i:c:p:206-216
    DOI: 10.1016/j.jairtraman.2016.08.005
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0969699716302356
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.jairtraman.2016.08.005?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
    2. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
    3. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    4. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2011. "A minimum cost flow model for level of repair analysis," International Journal of Production Economics, Elsevier, vol. 133(1), pages 233-242, September.
    5. Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
    6. Zijm, W. Henk & Avsar, Zeynep Muge, 2003. "Capacitated two-indenture models for repairable item systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 573-588, January.
    7. Ghobbar, Adel A. & Friend, Chris H., 2004. "The material requirements planning system for aircraft maintenance and inventory control: a note," Journal of Air Transport Management, Elsevier, vol. 10(3), pages 217-221.
    8. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    9. Alvarez, Elisa & van der Heijden, Matthieu, 2014. "On two-echelon inventory systems with Poisson demand and lost sales," European Journal of Operational Research, Elsevier, vol. 235(1), pages 334-338.
    10. Olsson, Fredrik, 2015. "Emergency lateral transshipments in a two-location inventory system with positive transshipment leadtimes," European Journal of Operational Research, Elsevier, vol. 242(2), pages 424-433.
    11. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2011. "Practical extensions to a minimum cost flow model for level of repair analysis," European Journal of Operational Research, Elsevier, vol. 211(2), pages 333-342, June.
    12. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    13. Kilpi, Jani & Töyli, Juuso & Vepsäläinen, Ari, 2009. "Cooperative strategies for the availability service of repairable aircraft components," International Journal of Production Economics, Elsevier, vol. 117(2), pages 360-370, February.
    14. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    15. Wong, Hartanto & Oudheusden, Dirk Van & Cattrysse, Dirk, 2007. "Cost allocation in spare parts inventory pooling," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 43(4), pages 370-386, July.
    16. Caggiano, Kathryn E. & Jackson, Peter L. & Muckstadt, John A. & Rappold, James A., 2009. "Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization," European Journal of Operational Research, Elsevier, vol. 199(3), pages 744-749, December.
    17. Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
    18. Hau L. Lee, 1987. "A Multi-Echelon Inventory Model for Repairable Items with Emergency Lateral Transshipments," Management Science, INFORMS, vol. 33(10), pages 1302-1316, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jackson, Canek & Pascual, Rodrigo & Mac Cawley, Alejandro & Godoy, Sergio, 2023. "Product–service system negotiation in aircraft lease contracts with option of disagreement," Journal of Air Transport Management, Elsevier, vol. 107(C).
    2. Yujie Zhang & Yukun Wang & Xiaopeng Li & Yiliu Liu & Weizheng Gao, 2024. "Condition-based maintenance optimization for deteriorating systems considering performance-based contracting and destructive inspections," Journal of Risk and Reliability, , vol. 238(2), pages 247-259, April.
    3. Ahmed Shaban & Mohamed A. Shalaby & Giulio Di Gravio & Riccardo Patriarca, 2020. "Analysis of Variance Amplification and Service Level in a Supply Chain with Correlated Demand," Sustainability, MDPI, vol. 12(16), pages 1-27, August.
    4. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    5. Riccardo Patriarca & Tianya Hu & Francesco Costantino & Giulio Di Gravio & Massimo Tronci, 2019. "A System-Approach for Recoverable Spare Parts Management Using the Discrete Weibull Distribution," Sustainability, MDPI, vol. 11(19), pages 1-15, September.
    6. Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    2. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
    3. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    4. R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
    5. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    6. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    7. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
    8. Yazdekhasti, Amin & sharifzadeh, Shila & Ma, Junfeng, 2022. "A two-echelon two-indenture warranty distribution network development and optimization under batch-ordering inventory policy," International Journal of Production Economics, Elsevier, vol. 249(C).
    9. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
    10. Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
    11. Yongchang Wei & Fangyu Chen & Feng Xiong, 2018. "Dynamic Complexities in a Supply Chain System with Lateral Transshipments," Complexity, Hindawi, vol. 2018, pages 1-15, June.
    12. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
    13. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
    14. Yu-kun Chen & Qi Gao & Xiao-bo Su & Shun Fang & Chi-ming Guo, 2018. "Research on optimization of spare parts inventory policy considering maintenance priority," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1336-1345, December.
    15. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    16. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    17. Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.
    18. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    19. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    20. Zümbül Atan & Lawrence V. Snyder & George R. Wilson, 2018. "Transshipment policies for systems with multiple retailers and two demand classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(1), pages 159-186, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jaitra:v:57:y:2016:i:c:p:206-216. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/journal-of-air-transport-management/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.