IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v237y2014i1p164-176.html
   My bibliography  Save this article

Maximizing system availability through joint decision on component redundancy and spares inventory

Author

Listed:
  • Xie, Wei
  • Liao, Haitao
  • Jin, Tongdan

Abstract

For a repairable k-out-of-n:G system consisting of line-replaceable units, its operational availability depends on component reliability, its redundancy level, and spare parts availability. As a result, it is important to consider redundancy allocation and spare parts provisioning simultaneously in maximizing the system’s operational availability. In prior studies, however, these important aspects are often handled separately in the areas of reliability engineering and spare parts logistics. In this paper, we study a collection of operational availability maximization problems, in which the component redundancy and the spares stocking quantities are to be determined simultaneously under economic and physical constraints. To solve this type of problem, continuous-time Markov chain models are developed first for a single repairable k-out-of-n:G system under different shut-off rules, and some important properties of the corresponding operational availability and spare parts availability are derived. Then, we extend the models to series systems consisting of multiple repairable k-out-of-n:G subsystems. The related optimization problems are reformulated as binary integer linear programs and solved using a branch-and-bound method. Numerical examples, including a real-world application of automatic test equipment, are presented to illustrate this integrated product-service solution and to offer valuable managerial insights.

Suggested Citation

  • Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
  • Handle: RePEc:eee:ejores:v:237:y:2014:i:1:p:164-176
    DOI: 10.1016/j.ejor.2014.02.031
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221714001660
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2014.02.031?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    2. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    3. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    4. Sven Axsäter & Christian Howard & Johan Marklund, 2013. "A distribution inventory model with transshipments from a support warehouse," IISE Transactions, Taylor & Francis Journals, vol. 45(3), pages 309-322.
    5. Ha, Chunghun & Kuo, Way, 2006. "Reliability redundancy allocation: An improved realization for nonconvex nonlinear programming problems," European Journal of Operational Research, Elsevier, vol. 171(1), pages 24-38, May.
    6. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    7. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    8. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    9. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2006. "On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out," European Journal of Operational Research, Elsevier, vol. 174(1), pages 182-200, October.
    10. Kurtuluş Barış Öner & Alan Scheller-Wolf & Geert-Jan van Houtum, 2013. "Redundancy Optimization for Critical Components in High-Availability Technical Systems," Operations Research, INFORMS, vol. 61(1), pages 244-264, February.
    11. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    12. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhang, Nan & Cai, Kaiquan & Deng, Yingjun & Zhang, Jun, 2023. "Determining the optimal production–maintenance policy of a parallel production system with stochastically interacted yield and deterioration," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
    2. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    3. Xiaoyue Wang & Jingxuan Wang & Ru Ning & Xi Chen, 2023. "Joint Optimization of Maintenance and Spare Parts Inventory Strategies for Emergency Engineering Equipment Considering Demand Priorities," Mathematics, MDPI, vol. 11(17), pages 1-18, August.
    4. Farhadi, Mohammad & Shahrokhi, Mahmoud & Rahmati, Seyed Habib A, 2022. "Developing a supplier selection model based on Markov chain and probability tree for a k-out-of-N system with different quality of spare parts," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    5. Tie Chen & Songlin Zheng & Jinzhi Feng, 2017. "Statistical dependency analysis of multiple competing failure causes of fuel cell engines," Journal of Risk and Reliability, , vol. 231(2), pages 83-90, April.
    6. Xiaojun Liang & Yinghui Tang, 2019. "The improvement upon the reliability of the k-out-of-n:F system with the repair rates differentiation policy," Operational Research, Springer, vol. 19(2), pages 479-500, June.
    7. Zhang, Nan & Cai, Kaiquan & Deng, Yingjun & Zhang, Jun, 2024. "Joint optimization of condition-based maintenance and condition-based production of a single equipment considering random yield and maintenance delay," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    8. Nizar Mannai & Soufiane Gasmi, 2020. "Optimal design of k-out-of-n system under first and last replacement in reliability theory," Operational Research, Springer, vol. 20(3), pages 1353-1368, September.
    9. Mingjuan Sun & Qinglai Dong & Zihan Gao, 2022. "An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds," Mathematics, MDPI, vol. 10(13), pages 1-15, June.
    10. Guo, Linhan & Li, Ruiyang & Wang, Yu & Yang, Jun & Liu, Yu & Chen, Yiming & Zhang, Jianguo, 2023. "Availability for multi-component k-out-of-n: G warm-standby system in series with shut-off rule of suspended animation," Reliability Engineering and System Safety, Elsevier, vol. 233(C).
    11. Fernández, Arturo J., 2015. "Optimum attributes component test plans for k-out-of-n:F Weibull systems using prior information," European Journal of Operational Research, Elsevier, vol. 240(3), pages 688-696.
    12. Wang, Jun & Zhu, Xiaoyan, 2021. "Joint optimization of condition-based maintenance and inventory control for a k-out-of-n:F system of multi-state degrading components," European Journal of Operational Research, Elsevier, vol. 290(2), pages 514-529.
    13. Sleptchenko, Andrei & van der Heijden, Matthieu, 2016. "Joint optimization of redundancy level and spare part inventories," Reliability Engineering and System Safety, Elsevier, vol. 153(C), pages 64-74.
    14. Alikar, Najmeh & Mousavi, Seyed Mohsen & Raja Ghazilla, Raja Ariffin & Tavana, Madjid & Olugu, Ezutah Udoncy, 2017. "Application of the NSGA-II algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 1-10.
    15. Petchrompo, Sanyapong & Li, Hao & Erguido, Asier & Riches, Chris & Parlikad, Ajith Kumar, 2020. "A value-based approach to optimizing long-term maintenance plans for a multi-asset k-out-of-N system," Reliability Engineering and System Safety, Elsevier, vol. 200(C).
    16. Kayedpour, Farjam & Amiri, Maghsoud & Rafizadeh, Mahmoud & Shahryari Nia, Arash, 2017. "Multi-objective redundancy allocation problem for a system with repairable components considering instantaneous availability and strategy selection," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 11-20.
    17. Zhou, Wenhui & Zheng, Zhibin & Xie, Wei, 2017. "A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff," European Journal of Operational Research, Elsevier, vol. 261(2), pages 613-625.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    2. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    3. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    4. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
    5. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    6. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    7. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    8. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    9. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    10. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    11. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
    12. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    13. Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
    14. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    15. Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    16. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    17. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    18. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    19. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    20. Araceli Zavala & David Nowicki & Jose Emmanuel Ramirez-Marquez, 2019. "Quantitative metrics to analyze supply chain resilience and associated costs," Journal of Risk and Reliability, , vol. 233(2), pages 186-199, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:237:y:2014:i:1:p:164-176. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.