Optimal spares allocation to an exchangeable-item repair system with tolerable wait
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2017.02.031
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
- Srivastava, Vaibhav & Bullo, Francesco, 2014. "Knapsack problems with sigmoid utilities: Approximation algorithms via hybrid optimization," European Journal of Operational Research, Elsevier, vol. 236(2), pages 488-498.
- Jing-Sheng Song & David D. Yao, 2002. "Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times," Operations Research, INFORMS, vol. 50(5), pages 889-903, October.
- Jiao, Hong-Wei & Liu, San-Yang, 2015. "A practicable branch and bound algorithm for sum of linear ratios problem," European Journal of Operational Research, Elsevier, vol. 243(3), pages 723-730.
- Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
- Paul H. Zipkin, 1980. "Simple Ranking Methods for Allocation of One Resource," Management Science, INFORMS, vol. 26(1), pages 34-43, January.
- van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
- Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
- Jing-Sheng Song, 1998. "On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System," Operations Research, INFORMS, vol. 46(6), pages 831-845, December.
- Kranenburg, A.A. & van Houtum, G.J., 2009. "A new partial pooling structure for spare parts networks," European Journal of Operational Research, Elsevier, vol. 199(3), pages 908-921, December.
- M. Berg & M. J. M. Posner, 1990. "Customer Delay in M/G/∞ Repair Systems with Spares," Operations Research, INFORMS, vol. 38(2), pages 344-348, April.
- Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
- Caggiano, Kathryn E. & Jackson, Peter L. & Muckstadt, John A. & Rappold, James A., 2009. "Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization," European Journal of Operational Research, Elsevier, vol. 199(3), pages 744-749, December.
- Wong, H. & van Houtum, G.J. & Cattrysse, D. & Oudheusden, D. Van, 2006. "Multi-item spare parts systems with lateral transshipments and waiting time constraints," European Journal of Operational Research, Elsevier, vol. 171(3), pages 1071-1093, June.
- Steven T. Hackman & Loren K. Platzman, 1990. "Near-Optimal Solution of Generalized Resource Allocation Problems with Large Capacities," Operations Research, INFORMS, vol. 38(5), pages 902-910, October.
- Kathryn E. Caggiano & Peter L. Jackson & John A. Muckstadt & James A. Rappold, 2007. "Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements," Operations Research, INFORMS, vol. 55(2), pages 303-318, April.
- Larsen, C. & Thorstenson, A., 2014. "The order and volume fill rates in inventory control systems," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 13-19.
- Kutanoglu, Erhan & Lohiya, Divi, 2008. "Integrated inventory and transportation mode selection: A service parts logistics system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 44(5), pages 665-683, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhang, Shuguang & Dan, Bin & Zhou, Maosen, 2019. "After-sale service deployment and information sharing in a supply chain under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 279(2), pages 351-363.
- Kouki, Chaaben & Arts, Joachim & Babai, M. Zied, 2024. "Performance evaluation of a two-echelon inventory system with network lost sales," European Journal of Operational Research, Elsevier, vol. 314(2), pages 647-664.
- Y. Barron, 2019. "A state-dependent perishability (s, S) inventory model with random batch demands," Annals of Operations Research, Springer, vol. 280(1), pages 65-98, September.
- Yahel Giat, 2024. "Stock Levels and Repair Sourcing in a Periodic Review Exchangeable Item Repair System," Logistics, MDPI, vol. 8(2), pages 1-19, March.
- Lotty E. Westerink‐Duijzer & Loe P. J. Schlicher & Marieke Musegaas, 2020. "Core Allocations for Cooperation Problems in Vaccination," Production and Operations Management, Production and Operations Management Society, vol. 29(7), pages 1720-1737, July.
- Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
- Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
- Westerink-Duijzer, L.E. & Schlicher, L.P.J. & Musegaas, M., 2019. "Fair allocations for cooperation problems in vaccination," Econometric Institute Research Papers EI2019-06, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Wang, Ziqi & Hou, Sizu, 2023. "A real-time strategy for vehicle-to-station recommendation in battery swapping mode," Energy, Elsevier, vol. 272(C).
- Cha, Ji Hwan & Finkelstein, Maxim, 2019. "Stochastic modeling for systems with delayed failures," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 118-124.
- García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
- Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
- Basten, Rob J.I. & Ryan, Jennifer K., 2019. "The value of maintenance delay flexibility for improved spare parts inventory management," European Journal of Operational Research, Elsevier, vol. 278(2), pages 646-657.
- Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
- Chen, Xinjiang & Yang, Yu & Wang, Jianxiao & Song, Jie & He, Guannan, 2023. "Battery valuation and management for battery swapping station," Energy, Elsevier, vol. 279(C).
- Dreyfuss, Michael & Giat, Yahel, 2019. "Allocating spares to maximize the window fill rate in a periodic review inventory system," International Journal of Production Economics, Elsevier, vol. 214(C), pages 151-162.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Dreyfuss, Michael & Giat, Yahel, 2019. "Allocating spares to maximize the window fill rate in a periodic review inventory system," International Journal of Production Economics, Elsevier, vol. 214(C), pages 151-162.
- van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
- Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
- Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
- Michael Dreyfuss & Alan Stulman, 2018. "Waiting time distribution for an exchangeable item repair system with up to two failed components," Annals of Operations Research, Springer, vol. 261(1), pages 167-184, February.
- Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
- Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
- van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2012. "Approximate evaluation of multi-location inventory models with lateral transshipments and hold back levels," European Journal of Operational Research, Elsevier, vol. 218(3), pages 624-635.
- Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
- Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
- Amin Yazdekhasti & Yahia Zare Mehrjardi, 2020. "Two-echelon three-indenture warranty distribution network: a hybrid branch and bound, Monte-Carlo approach," Operational Research, Springer, vol. 20(2), pages 1113-1158, June.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
- Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
- Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
- Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
- Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
- Frank Karsten & Marco Slikker & Geert‐Jan van Houtum, 2012. "Inventory pooling games for expensive, low‐demand spare parts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(5), pages 311-324, August.
- Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
- Koushik Ramakrishna & Moosa Sharafali & Yun Lim, 2015. "A two-item two-warehouse periodic review inventory model with transshipment," Annals of Operations Research, Springer, vol. 233(1), pages 365-381, October.
More about this item
Keywords
Inventory; Logistics; Truncated waiting time; Window fill rate; Optimization criteria;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:261:y:2017:i:2:p:584-594. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.