IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v204y2018icp186-203.html
   My bibliography  Save this article

End-of-life inventory control of aircraft spare parts under performance based logistics

Author

Listed:
  • Hur, Mansik
  • Keskin, Burcu B.
  • Schmidt, Charles P.

Abstract

We consider an inventory control problem of aircraft spare parts during the end-of-life (EOL) phase of fleet operations. For these spare parts, demand rates vary with the diminishing number of operational aircraft, as the aircraft retire out of service. As aircraft approach to the EOL phase, managing the spare parts supply chain becomes more challenging and costly. Before entering the EOL period, the aircraft manufacturer typically requires its customers to place final purchase orders for spare parts for the remaining lifetime of the aircraft. For this problem, we present an algorithm that computes the optimal final order size of components under a budget constraint. By modeling the remaining part inventory as a continuous-time Markov chain, we develop analytical solutions using differential equations for single and two-item cases. After observing numerical difficulty for the multi-item case, we employ a simulation-optimization with a gradient search method. The algorithm finds the spares requirement of aircraft components during the EOL period with aircraft availability which serves as a useful performance metric during the spare part supply chain management under a performance-based logistics (PBL) environment.

Suggested Citation

  • Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
  • Handle: RePEc:eee:proeco:v:204:y:2018:i:c:p:186-203
    DOI: 10.1016/j.ijpe.2018.07.028
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318302949
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.07.028?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    2. Teunter, Ruud H. & Fortuin, Leonard, 1999. "End-of-life service," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 487-497, March.
    3. J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
    4. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
    5. Pourakbar, Morteza & Dekker, Rommert, 2012. "Customer differentiated end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
    6. Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
    7. G. Hadley & T. M. Whitin, 1961. "An Optimal Final Inventory Model," Management Science, INFORMS, vol. 7(2), pages 179-183, January.
    8. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    9. Teunter, Ruud H. & Klein Haneveld, Willem K., 1998. "The `final orderrs problem," European Journal of Operational Research, Elsevier, vol. 107(1), pages 35-44, May.
    10. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
    11. Cattani, Kyle D. & Souza, Gilvan C., 2003. "Good buy? Delaying end-of-life purchases," European Journal of Operational Research, Elsevier, vol. 146(1), pages 216-228, April.
    12. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    13. John R. Moore, Jr., 1971. "Forecasting and Scheduling for Past-Model Replacement Parts," Management Science, INFORMS, vol. 18(4-Part-I), pages 200-213, December.
    14. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    15. K Sahyouni & R C Savaskan & M S Daskin, 2010. "The effect of lifetime buys on warranty repair operations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 790-803, May.
    16. Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
    2. Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
    3. Pradipta Patra & U. Dinesh Kumar, 2024. "Availability contracts under hierarchical maintenance," Annals of Operations Research, Springer, vol. 340(1), pages 389-423, September.
    4. Jan Block & Alireza Ahmadi & Xun Xiao & Uday Kumar, 2019. "Spares provisioning strategy for periodically replaced units within the fleet retirement period," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 299-315, June.
    5. Boram Choi & Jong Hwan Suh, 2020. "Forecasting Spare Parts Demand of Military Aircraft: Comparisons of Data Mining Techniques and Managerial Features from the Case of South Korea," Sustainability, MDPI, vol. 12(15), pages 1-20, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
    2. Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
    3. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    4. Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
    5. Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
    6. J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
    7. Pourakbar, Morteza & Dekker, Rommert, 2012. "Customer differentiated end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
    8. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
    9. Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
    10. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
    11. M. Pourakbar & E. Laan & R. Dekker, 2014. "End-of-Life Inventory Problem with Phaseout Returns," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
    12. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    13. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    14. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    15. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    16. Pinçe, Çerag & Dekker, Rommert, 2011. "An inventory model for slow moving items subject to obsolescence," European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
    17. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    18. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    19. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    20. Karl Inderfurth & Rainer Kleber, 2010. "An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production," FEMM Working Papers 100005, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:204:y:2018:i:c:p:186-203. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.