Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.1060.0345
Download full text from publisher
References listed on IDEAS
- Andrew J. Clark & Herbert Scarf, 2004.
"Optimal Policies for a Multi-Echelon Inventory Problem,"
Management Science, INFORMS, vol. 50(12_supple), pages 1782-1790, December.
- Andrew J. Clark & Herbert Scarf, 1960. "Optimal Policies for a Multi-Echelon Inventory Problem," Management Science, INFORMS, vol. 6(4), pages 475-490, July.
- Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
- John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
- Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
- Stephen A. Smith & John C. Chambers & Eli Shlifer, 1980. "Note---Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items," Management Science, INFORMS, vol. 26(8), pages 849-854, August.
- Narendra Agrawal & Morris A. Cohen, 2001. "Optimal material control in an assembly system with component commonality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 409-429, August.
- Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
- Jing-Sheng Song & Susan H. Xu & Bin Liu, 1999. "Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes," Operations Research, INFORMS, vol. 47(1), pages 131-149, February.
- Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
- David F. Pyke, 1990. "Priority repair and dispatch policies for reparable‐item logistics systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(1), pages 1-30, February.
- Morris A. Cohen & Paul R. Kleindorfer & Hau L. Lee, 1989. "Near-Optimal Service Constrained Stocking Policies for Spare Parts," Operations Research, INFORMS, vol. 37(1), pages 104-117, February.
- Morris A. Cohen & Hau L. Lee, 1988. "Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods," Operations Research, INFORMS, vol. 36(2), pages 216-228, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Douniel Lamghari-Idrissi & Roy van Hugten & Geert-Jan van Houtum & Rob Basten, 2022. "Increasing Chip Availability Through a New After-Sales Service Supply Concept at ASML," Interfaces, INFORMS, vol. 52(5), pages 460-470, September.
- van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
- Jeet, Vishv & Kutanoglu, Erhan, 2018. "Part commonality effects on integrated network design and inventory models for low-demand service parts logistics systems," International Journal of Production Economics, Elsevier, vol. 206(C), pages 46-58.
- Elisa Alvarez & Matthieu Heijden & W. Zijm, 2015. "Service differentiation in spare parts supply through dedicated stocks," Annals of Operations Research, Springer, vol. 231(1), pages 283-303, August.
- Dreyfuss, Michael & Giat, Yahel, 2017. "Optimal spares allocation to an exchangeable-item repair system with tolerable wait," European Journal of Operational Research, Elsevier, vol. 261(2), pages 584-594.
- Caggiano, Kathryn E. & Jackson, Peter L. & Muckstadt, John A. & Rappold, James A., 2009. "Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization," European Journal of Operational Research, Elsevier, vol. 199(3), pages 744-749, December.
- Wheatley, David & Gzara, Fatma & Jewkes, Elizabeth, 2015. "Logic-based Benders decomposition for an inventory-location problem with service constraints," Omega, Elsevier, vol. 55(C), pages 10-23.
- Mustafa K. Doğru & Ulaş Özen, 2015. "Tactical Inventory Planning at Alcatel-Lucent’s Repair and Exchange Services," Interfaces, INFORMS, vol. 45(3), pages 228-242, June.
- Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
- Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
- Topan, Engin & Bayındır, Z. Pelin & Tan, Tarkan, 2017. "Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures," European Journal of Operational Research, Elsevier, vol. 256(1), pages 126-138.
- Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
- Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
- Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
- Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
- Lina Johansson & Fredrik Olsson, 2017. "Quantifying sustainable control of inventory systems with non-linear backorder costs," Annals of Operations Research, Springer, vol. 259(1), pages 217-239, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Vinayak Deshpande & Morris A. Cohen & Karen Donohue, 2003. "An Empirical Study of Service Differentiation for Weapon System Service Parts," Operations Research, INFORMS, vol. 51(4), pages 518-530, August.
- Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
- David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
- Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
- Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
- Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
- Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
- Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
- Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.
- Guillermo Gallego & Özalp Özer & Paul Zipkin, 2007. "Bounds, Heuristics, and Approximations for Distribution Systems," Operations Research, INFORMS, vol. 55(3), pages 503-517, June.
- Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
- Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
- Hossein Abouee-Mehrizi & Opher Baron & Oded Berman, 2014. "Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities," Manufacturing & Service Operations Management, INFORMS, vol. 16(4), pages 561-577, October.
- Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
- Liming Liu & Xiaoming Liu & David D. Yao, 2004. "Analysis and Optimization of a Multistage Inventory-Queue System," Management Science, INFORMS, vol. 50(3), pages 365-380, March.
- Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
- Narendra Agrawal & Morris A. Cohen, 2001. "Optimal material control in an assembly system with component commonality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 409-429, August.
- Fangruo Chen, 1999. "94%-Effective Policies for a Two-Stage Serial Inventory System with Stochastic Demand," Management Science, INFORMS, vol. 45(12), pages 1679-1696, December.
- Guillermo Gallego & Paul Zipkin, 1999. "Stock Positioning and Performance Estimation in Serial Production-Transportation Systems," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 77-88.
More about this item
Keywords
inventory/production; multiechelon; multi-item; service-level constraints; heuristics;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:55:y:2007:i:2:p:303-318. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.