Contract design for equipment after-sales service with business interruption insurance
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2019.12.027
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
- Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine & Senthil Veeraraghavan, 2010. "Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems," Management Science, INFORMS, vol. 56(9), pages 1551-1567, September.
- Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
- Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
- Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
- Jose A. Guajardo & Morris A. Cohen & Sang-Hyun Kim & Serguei Netessine, 2012. "Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis," Management Science, INFORMS, vol. 58(5), pages 961-979, May.
- Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
- Nitin Bakshi & Sang-Hyun Kim & Nicos Savva, 2015. "Signaling New Product Reliability with After-Sales Service Contracts," Management Science, INFORMS, vol. 61(8), pages 1812-1829, August.
- Kamil J. Mizgier & Otto Kocsis & Stephan M. Wagner, 2018. "Zurich Insurance Uses Data Analytics to Leverage the BI Insurance Proposition," Interfaces, INFORMS, vol. 48(2), pages 94-107, April.
- Wong, Hartanto & Cattrysse, Dirk & Van Oudheusden, Dirk, 2005. "Stocking decisions for repairable spare parts pooling in a multi-hub system," International Journal of Production Economics, Elsevier, vol. 93(1), pages 309-317, January.
- Geert-Jan van Houtum & Bram Kranenburg, 2015. "Spare Parts Inventory Control under System Availability Constraints," International Series in Operations Research and Management Science, Springer, edition 127, number 978-1-4899-7609-3, April.
- Nitish Jain & Sameer Hasija & Dana G. Popescu, 2013. "Optimal Contracts for Outsourcing of Repair and Restoration Services," Operations Research, INFORMS, vol. 61(6), pages 1295-1311, December.
- Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
- Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
- John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
- A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
- Mustafa Akan & Bar{i}c{s} Ata & Martin A. Lariviere, 2011. "Asymmetric Information and Economies of Scale in Service Contracting," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 58-72, September.
- Jingchen Hou & Andy Neely, 2018. "Investigating risks of outcome-based service contracts from a provider’s perspective," International Journal of Production Research, Taylor & Francis Journals, vol. 56(6), pages 2103-2115, March.
- Juan Camilo Serpa & Harish Krishnan, 2017. "The Strategic Role of Business Insurance," Management Science, INFORMS, vol. 63(2), pages 384-404, February.
- Lingxiu Dong & Brian Tomlin, 2012. "Managing Disruption Risk: The Interplay Between Operations and Insurance," Management Science, INFORMS, vol. 58(10), pages 1898-1915, October.
- Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
- G. J. Feeney & C. C. Sherbrooke, 1966. "The (S - 1, S) Inventory Policy Under Compound Poisson Demand," Management Science, INFORMS, vol. 12(5), pages 391-411, January.
- Guillaume Roels & Uday S. Karmarkar & Scott Carr, 2010. "Contracting for Collaborative Services," Management Science, INFORMS, vol. 56(5), pages 849-863, May.
- Kaplow, Louis, 1992. "Income Tax Deductions for Losses as Insurance," American Economic Review, American Economic Association, vol. 82(4), pages 1013-1017, September.
- Zhen, Xueping & Li, Yongjian & Cai, Gangshu (George) & Shi, Dan, 2016. "Transportation disruption risk management: business interruption insurance and backup transportation," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 90(C), pages 51-68.
- Kostas Selviaridis & Finn Wynstra, 2015. "Performance-based contracting: a literature review and future research directions," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3505-3540, June.
- Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
- Sang-Hyun Kim & Brian Tomlin, 2013. "Guilt by Association: Strategic Failure Prevention and Recovery Capacity Investments," Management Science, INFORMS, vol. 59(7), pages 1631-1649, July.
- Lingxiu Dong & Sammi Yu Tang & Brian Tomlin, 2018. "Production Chain Disruptions: Inventory, Preparedness, and Insurance," Production and Operations Management, Production and Operations Management Society, vol. 27(7), pages 1251-1270, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhong-Zhong Jiang & Na He & Xuwei Qin & Minghe Sun & Pengfei Wang, 2022. "Optimizing production and maintenance for the service-oriented manufacturing supply chain," Annals of Operations Research, Springer, vol. 316(1), pages 33-58, September.
- Wu, Qianni & Chiu, Chun-Hung, 2023. "The impacts of carbon insurance on supply chain and environment considering technology risk under cap-and-trade mechanism," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 180(C).
- Sun, Mingyao & Ng, Chi To & Wu, Feng & Cheng, T.C.E., 2022. "Optimization of after-sales services with spare parts consumption and repairman travel," International Journal of Production Economics, Elsevier, vol. 244(C).
- Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
- Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
- Dong Li & Nishant Mishra & Serguei Netessine, 2023. "Contracting for Product Support Under Information Asymmetry," Management Science, INFORMS, vol. 69(8), pages 4627-4645, August.
- Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
- Nitin Bakshi & Sang-Hyun Kim & Nicos Savva, 2015. "Signaling New Product Reliability with After-Sales Service Contracts," Management Science, INFORMS, vol. 61(8), pages 1812-1829, August.
- Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2019. "Emergency supply contracts for a service provider with limited local resources," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 445-460.
- Li, Dong & Mishra, Nishant, 2021. "Engaging suppliers for reliability improvement under outcome-based compensations," Omega, Elsevier, vol. 102(C).
- Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
- Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
- Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
- Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
- Li, Dong, 2020. "When less is more: Recovery technology investment and segmentation for uptime-centered services," European Journal of Operational Research, Elsevier, vol. 286(1), pages 267-281.
- Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
- Juan Camilo Serpa & Harish Krishnan, 2017. "The Strategic Role of Business Insurance," Management Science, INFORMS, vol. 63(2), pages 384-404, February.
- S. Alex Yang & Nitin Bakshi & Christopher J. Chen, 2021. "Trade Credit Insurance: Operational Value and Contract Choice," Management Science, INFORMS, vol. 67(2), pages 875-891, February.
- Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
- Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
- Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
More about this item
Keywords
Maintenance; Contract and incentives; Insurance; After-sales service;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:284:y:2020:i:1:p:176-187. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.