IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v12y2020i19p8027-d421124.html
   My bibliography  Save this article

Improved MRO Inventory Management System in Oil and Gas Company: Increased Service Level and Reduced Average Inventory Investment

Author

Listed:
  • Usman Ali

    (Departmetnt of Industrial Engineering, Main Campus, University of Engineering and Technology, Peshawar 25100, Pakistan)

  • Bashir Salah

    (Industrial Engineering Department, College of Engineering, King Saud University, P.O. Box 800, Riyadh 11421, Saudi Arabia)

  • Khawar Naeem

    (Departmetnt of Industrial Engineering, Main Campus, University of Engineering and Technology, Peshawar 25100, Pakistan)

  • Abdul Salam Khan

    (NUST Business School, National University of Science and Technology, Islamabad 44000, Pakistan
    Arts et Métiers Institute of Technology, Université de Lorraine, LCFC, F-57070 Metz, France)

  • Razaullah Khan

    (Department of Mechanical Engineering Technology, University of Technology, Nowshera 24100, Pakistan)

  • Catalin Iulian Pruncu

    (Mechanical Engineering, Imperial College London, Exhibition Road, South Kensington, London SW7 2AZ, UK
    Design, Manufacturing & Engineering Management, University of Strathclyde, Glasgow G1 1XJ, Scotland, UK)

  • Muhammad Abas

    (Departmetnt of Industrial Engineering, Main Campus, University of Engineering and Technology, Peshawar 25100, Pakistan)

  • Saadat Khan

    (Department of Industrial Engineering, Jalozai Campus, University of Engineering and Technology, Peshawar 25100, Pakistan)

Abstract

This study proposes a methodology for the oil and gas businesses to keep their production plant productive with a minimum investment in carrying maintenance, repair, and operating inventory planning. The goal is to assist the exploration and production companies in minimizing the investment in keeping maintenance, repair, and operating (MRO) inventory for improving production plant uptime. The MRO inventory is the most expensive asset and it requires substantial investment. It helps in keeping the oil and gas production plant productive by performing planned and unplanned maintenance activities. A ( Q , r ) model with a stock-out and backorder cost approach is combined with a continuous inventory review policy for the analysis of class A items of oil and gas production plant MRO inventory. The class A items are identified through popular ABC analysis based on annual dollar volume. The demand for the inventory is modeled through Poisson distribution with consideration of constant lead time. The ( Q , r ) model in both stock-out cost and backorder cost approaches assigned higher order frequency and lower service level to low annual demand and highly expensive items. The stock-out cost approach shows an 8.88% increase in the average service level and a 56.9% decrease in the company average inventory investment. The backorder cost approach results in a 7.77% increase in average service level and a 57% decrease in average inventory investment in contrast to the company’s existing inventory management system. The results have a direct impact on increasing plant uptime and productivity and reducing company maintenance cost through properly managing maintenance stock. The analysis is carried out on the oil and gas production plant’s MRO inventory data, but it can be applied to other companies’ inventory data as well. All the results reflected in this research are based on the inventory ordering policy of two orders per year. The inventory ordering frequency per year may be other than two orders per year depending on the type of organization.

Suggested Citation

  • Usman Ali & Bashir Salah & Khawar Naeem & Abdul Salam Khan & Razaullah Khan & Catalin Iulian Pruncu & Muhammad Abas & Saadat Khan, 2020. "Improved MRO Inventory Management System in Oil and Gas Company: Increased Service Level and Reduced Average Inventory Investment," Sustainability, MDPI, vol. 12(19), pages 1-19, September.
  • Handle: RePEc:gam:jsusta:v:12:y:2020:i:19:p:8027-:d:421124
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/12/19/8027/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/12/19/8027/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Inderfurth, Karl & van der Laan, Erwin, 2001. "Leadtime effects and policy improvement for stochastic inventory control with remanufacturing," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 381-390, May.
    2. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    3. Turrini, Laura & Meissner, Joern, 2019. "Spare parts inventory management: New evidence from distribution fitting," European Journal of Operational Research, Elsevier, vol. 273(1), pages 118-130.
    4. Mario Guajardo & Mikael Rönnqvist & Ann Mari Halvorsen & Svein Inge Kallevik, 2015. "Inventory management of spare parts in an energy company," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(2), pages 331-341, February.
    5. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    6. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    7. Snyder, Ralph D. & Ord, J. Keith & Beaumont, Adrian, 2012. "Forecasting the intermittent demand for slow-moving inventories: A modelling approach," International Journal of Forecasting, Elsevier, vol. 28(2), pages 485-496.
    8. Pinçe, Çerag & Dekker, Rommert, 2011. "An inventory model for slow moving items subject to obsolescence," European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
    9. Dolgui, Alexandre & Pashkevich, Maksim, 2008. "Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance," International Journal of Production Economics, Elsevier, vol. 112(2), pages 885-894, April.
    10. Gu, Jingyao & Zhang, Guoqing & Li, Kevin W., 2015. "Efficient aircraft spare parts inventory management under demand uncertainty," Journal of Air Transport Management, Elsevier, vol. 42(C), pages 101-109.
    11. Zohrul Kabir, A. B. M. & Al-Olayan, Ahmed S., 1996. "A stocking policy for spare part provisioning under age based preventive replacement," European Journal of Operational Research, Elsevier, vol. 90(1), pages 171-181, April.
    12. Riccardo Patriarca & Tianya Hu & Francesco Costantino & Giulio Di Gravio & Massimo Tronci, 2019. "A System-Approach for Recoverable Spare Parts Management Using the Discrete Weibull Distribution," Sustainability, MDPI, vol. 11(19), pages 1-15, September.
    13. Sebastian Kot & Katarzyna Grondys & Romuald Szopa, 2011. "Theory Of Inventory Management Based On Demand Forecasting," Polish Journal of Management Studies, Czestochowa Technical University, Department of Management, vol. 3(1), pages 148-156, May.
    14. Francisco J. Tapia-Ubeda & Pablo A. Miranda & Irene Roda & Marco Macchi & Orlando Durán, 2020. "Modelling and solving spare parts supply chain network design problems," International Journal of Production Research, Taylor & Francis Journals, vol. 58(17), pages 5299-5319, September.
    15. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jindai Zhang & Jinlou Zhao, 2022. "Prediction-Driven Sequential Optimization for Refined Oil Production-Sales-Stock Decision-Making," Energies, MDPI, vol. 15(12), pages 1-19, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    2. Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
    3. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
    4. Mauricio Varas & Franco Basso & Armin Lüer-Villagra & Alejandro Mac Cawley & Sergio Maturana, 2019. "Managing premium wines using an $$(s - 1,s)$$ ( s - 1 , s ) inventory policy: a heuristic solution approach," Annals of Operations Research, Springer, vol. 280(1), pages 351-376, September.
    5. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    6. Ye, Yuan & Lu, Yonggang & Robinson, Powell & Narayanan, Arunachalam, 2022. "An empirical Bayes approach to incorporating demand intermittency and irregularity into inventory control," European Journal of Operational Research, Elsevier, vol. 303(1), pages 255-272.
    7. Prak, Derk & Teunter, Rudolf & Babai, M. Z. & Syntetos, A. A. & Boylan, D, 2018. "Forecasting and Inventory Control with Compound Poisson Demand Using Periodic Demand Data," Research Report 2018010, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    8. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    9. Kouki, Chaaben & Arts, Joachim & Babai, M. Zied, 2024. "Performance evaluation of a two-echelon inventory system with network lost sales," European Journal of Operational Research, Elsevier, vol. 314(2), pages 647-664.
    10. Olde Keizer, Minou C.A. & Teunter, Ruud H. & Veldman, Jasper, 2017. "Joint condition-based maintenance and inventory optimization for systems with multiple components," European Journal of Operational Research, Elsevier, vol. 257(1), pages 209-222.
    11. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    12. Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022. "Forecasting: theory and practice," International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
      • Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
    13. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    14. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    15. Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
    16. Kourentzes, Nikolaos & Athanasopoulos, George, 2021. "Elucidate structure in intermittent demand series," European Journal of Operational Research, Elsevier, vol. 288(1), pages 141-152.
    17. Kleber, Rainer & Zanoni, Simone & Zavanella, Lucio, 2011. "On how buyback and remanufacturing strategies affect the profitability of spare parts supply chains," International Journal of Production Economics, Elsevier, vol. 133(1), pages 135-142, September.
    18. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    19. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    20. Pourya Pourhejazy, 2020. "Destruction Decisions for Managing Excess Inventory in E-Commerce Logistics," Sustainability, MDPI, vol. 12(20), pages 1-12, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:12:y:2020:i:19:p:8027-:d:421124. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.