IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v208y2019icp29-42.html
   My bibliography  Save this article

Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods

Author

Listed:
  • van Ooijen, Henny
  • Bertrand, J. Will M.
  • Buyukkaramikli, Nasuh C.

Abstract

We study a maintenance organization serving industrial customers operating a commoditized capital good. The maintenance organization provides for availability of the capital good. Upon failure, a substitute good rented from a third party is installed. A logistics service provider picks up the failed good and delivers it to the repair shop. On arrival at the repair shop the failed good is repaired, returned, and installed for use. Rent for the substitute ends at installation of the repaired good. Idle repair shop capacity can be used for other revenue generating tasks, depending on the time the capacity is available. We consider three failed good collection modes. First, a failed good is immediately collected, transported, and immediately admitted to the repair shop. Second, the logistics service provider is allowed a certain slack time for the delivery of the failed good to the repair shop. Third, a failed good is only admitted periodically to the shop and collection and transportation ensures that the failed good is available in the repair shop at the start of the first period possible. We ask under what conditions a transportation slack time, either as a constant slack or as a periodic admission to the repair shop, can be beneficial. We present analytical solutions for immediate transportation and transportation with a constant time slack considering costs. We find that (some) transportation time slack can be beneficial for high failure rates and high transportation costs.

Suggested Citation

  • van Ooijen, Henny & Bertrand, J. Will M. & Buyukkaramikli, Nasuh C., 2019. "Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods," International Journal of Production Economics, Elsevier, vol. 208(C), pages 29-42.
  • Handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:29-42
    DOI: 10.1016/j.ijpe.2018.11.001
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318304407
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.11.001?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Vandermerwe, Sandra & Rada, Juan, 1988. "Servitization of business: Adding value by adding services," European Management Journal, Elsevier, vol. 6(4), pages 314-324, December.
    2. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    3. Ramamurthy oRamjio Balakrishnan & K. Sivaramakrishnan & Shyam NMI Sunder, 2001. "Is the Opportunity Cost of Idle Capacity Zero? Coase (1938) Versus Managerial Accounting Circa 2000," Yale School of Management Working Papers ysm210, Yale School of Management.
    4. Nasuh Buyukkaramikli & J. Bertrand & Henny Ooijen, 2013. "Flexible hiring in a make to order system with parallel processing units," Annals of Operations Research, Springer, vol. 209(1), pages 159-178, October.
    5. John A. Muckstadt, 1978. "Some approximations in multi‐item, multi‐echelon inventory systems for recoverable items," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 25(3), pages 377-394, September.
    6. Thom J. Hodgson & Gerald W. McDonald, 1981. "Interactive Scheduling of a Generalized Flowshop. Part I: Success Through Evolutionary Development," Interfaces, INFORMS, vol. 11(2), pages 42-47, April.
    7. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    8. Sergio Cavalieri & Zied M. Ouertani & Jiang Zhibin & Alice Rondini, 2018. "Service transformation in industrial companies," International Journal of Production Research, Taylor & Francis Journals, vol. 56(6), pages 2099-2102, March.
    9. Dijkstra, Matthijs C. & Kroon, Leo G. & van Nunen, Jo A. E. E. & Salomon, Marc, 1991. "A DSS for capacity planning of aircraft maintenance personnel," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 69-78, October.
    10. Berling, Peter & Eng-Larsson, Fredrik, 2016. "Pricing and timing of consolidated deliveries in the presence of an express alternative: Financial and environmental analysis," European Journal of Operational Research, Elsevier, vol. 250(2), pages 590-601.
    11. Yan, Shangyao & Yang, Ta-Hui & Chen, Hsuan-Hung, 2004. "Airline short-term maintenance manpower supply planning," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(9-10), pages 615-642.
    12. Ülkü, M. Ali & Bookbinder, James H., 2012. "Optimal quoting of delivery time by a third party logistics provider: The impact of shipment consolidation and temporal pricing schemes," European Journal of Operational Research, Elsevier, vol. 221(1), pages 110-117.
    13. C. A. Holloway & R. T. Nelson, 1974. "Job Shop Scheduling with Due Dates and Variable Processing Times," Management Science, INFORMS, vol. 20(9), pages 1264-1275, May.
    14. Reményi, Christoph & Staudacher, Stephan, 2014. "Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 94-107.
    15. C. A. Holloway & R. T. Nelson, 1974. "Job Shop Scheduling with Due Dates and Overtime Capability," Management Science, INFORMS, vol. 21(1), pages 68-78, September.
    16. Alegre, Jesus & Laguna, Manuel & Pacheco, Joaquin, 2007. "Optimizing the periodic pick-up of raw materials for a manufacturer of auto parts," European Journal of Operational Research, Elsevier, vol. 179(3), pages 736-746, June.
    17. M. Ali Ülkü & James H. Bookbinder, 2012. "Modelling shipment consolidation and pricing decisions for a manufacturer-distributor," International Journal of Revenue Management, Inderscience Enterprises Ltd, vol. 6(1/2), pages 62-76.
    18. Goodwin, James C & Elvers, Douglas & Goodwin, Jack S, 1978. "Overtime usage in a job shop environment," Omega, Elsevier, vol. 6(6), pages 493-500.
    19. Kurz, Julian, 2016. "Capacity planning for a maintenance service provider with advanced information," European Journal of Operational Research, Elsevier, vol. 251(2), pages 466-477.
    20. S Coene & A Arnout & F C R Spieksma, 2010. "On a periodic vehicle routing problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(12), pages 1719-1728, December.
    21. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    22. Çetinkaya, SIla & Bookbinder, James H., 2003. "Stochastic models for the dispatch of consolidated shipments," Transportation Research Part B: Methodological, Elsevier, vol. 37(8), pages 747-768, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Berling, Peter & Eng-Larsson, Fredrik, 2016. "Pricing and timing of consolidated deliveries in the presence of an express alternative: Financial and environmental analysis," European Journal of Operational Research, Elsevier, vol. 250(2), pages 590-601.
    2. Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
    3. Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
    4. Chen, Jing & Dong, Ming & Xu, Lei, 2018. "A perishable product shipment consolidation model considering freshness-keeping effort," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 115(C), pages 56-86.
    5. Satır, Benhür & Erenay, Fatih Safa & Bookbinder, James H., 2018. "Shipment consolidation with two demand classes: Rationing the dispatch capacity," European Journal of Operational Research, Elsevier, vol. 270(1), pages 171-184.
    6. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    7. Romero-Silva, Rodrigo & Mujica Mota, Miguel, 2022. "Trade-offs in the landside operations of air cargo hubs: Horizontal cooperation and shipment consolidation policies considering capacitated nodes," Journal of Air Transport Management, Elsevier, vol. 103(C).
    8. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.
    9. Wei, Bo & Çetinkaya, Sıla & Cline, Daren B.H., 2023. "Inbound replenishment and outbound dispatch decisions under hybrid shipment consolidation policies: An analytical model and comparison," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 175(C).
    10. Nha-Nghi Cruz & Hans Daduna, 2019. "Optimal capacity allocation in a production–inventory system with base stock," Annals of Operations Research, Springer, vol. 277(2), pages 329-344, June.
    11. Rodríguez-Martín, Inmaculada & Salazar-González, Juan-José & Yaman, Hande, 2019. "The periodic vehicle routing problem with driver consistency," European Journal of Operational Research, Elsevier, vol. 273(2), pages 575-584.
    12. Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
    13. Reményi, Christoph & Staudacher, Stephan, 2014. "Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 94-107.
    14. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    15. Kyunghoon Kang & Ki-sung Hong & Ki Hong Kim & Chulung Lee, 2017. "Shipment Consolidation Policy under Uncertainty of Customer Order for Sustainable Supply Chain Management," Sustainability, MDPI, vol. 9(9), pages 1-17, September.
    16. E. Ursavas & Stuart X. Zhu, 2018. "Integrated Passenger and Freight Train Planning on Shared-Use Corridors," Service Science, INFORMS, vol. 52(6), pages 1376-1390, December.
    17. Sonntag, Danja R. & Schrotenboer, Albert H. & Kiesmüller, Gudrun P., 2023. "Stochastic inventory routing with time-based shipment consolidation," European Journal of Operational Research, Elsevier, vol. 306(3), pages 1186-1201.
    18. Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
    19. K Sahyouni & R C Savaskan & M S Daskin, 2010. "The effect of lifetime buys on warranty repair operations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 790-803, May.
    20. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:29-42. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.