IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v212y2019icp39-50.html
   My bibliography  Save this article

Joint optimization of spare parts inventory and service engineers staffing with full backlogging

Author

Listed:
  • Rahimi-Ghahroodi, S.
  • Al Hanbali, A.
  • Vliegen, I.M.H.
  • Cohen, M.A.

Abstract

We consider the integrated planning of spare parts and service engineers that are needed for serving a group of systems. These systems are subject to different failure types, and for each failure, a service engineer with the necessary spare part has to be assigned to repair the system. The service provider follows a backlogging policy with part reservations. That is, a repair request is backlogged if one of the required resources is not immediately available upon demand. Moreover, a spare part is reserved if the requested spare part is in stock but no service engineer is immediately available. The spare parts are typically slow-movers and are managed according to a base-stock policy. The objective is to jointly determine the stock levels and the number of service engineers to minimize the total service costs subject to a constraint on the expected total waiting times of the repair calls. For the evaluation of a given setting, we present an exact method (computationally feasible for small problems) and an accurate approximation. For the joint optimization, we present a greedy heuristic that efficiently produces close-to-optimal results. We test how the heuristic performs compared to the optimal solution and the separate optimization of spare parts and service engineers in an extensive numerical study. In a case study with 93 types of spare parts, we show that the solution of the greedy algorithm is always within 2% of the optimal solution and is up to 20% better than a separated optimization approach encountered in practice.

Suggested Citation

  • Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
  • Handle: RePEc:eee:proeco:v:212:y:2019:i:c:p:39-50
    DOI: 10.1016/j.ijpe.2019.02.007
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527319300556
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2019.02.007?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2012. "Approximate evaluation of multi-location inventory models with lateral transshipments and hold back levels," European Journal of Operational Research, Elsevier, vol. 218(3), pages 624-635.
    2. Waller, AAW, 1994. "A queueing network model for field service support systems," Omega, Elsevier, vol. 22(1), pages 35-40, January.
    3. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    4. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    5. Margaret K. Schaefer, 1983. "A Multi-Item Maintenance Center Inventory Model for Low-Demand Reparable Items," Management Science, INFORMS, vol. 29(9), pages 1062-1068, September.
    6. Mustafa K. Doğru & Martin I. Reiman & Qiong Wang, 2010. "A Stochastic Programming Based Inventory Policy for Assemble-to-Order Systems with Application to the W Model," Operations Research, INFORMS, vol. 58(4-part-1), pages 849-864, August.
    7. Wenhui Zhou & Xiuli Chao, 2012. "Stein–Chen approximation and error bounds for order fill rates in assemble‐to‐order systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(8), pages 643-655, December.
    8. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    9. Bruce L. Miller, 1971. "A Multi-Item Inventory Model with Joint Backorder Criterion," Operations Research, INFORMS, vol. 19(6), pages 1467-1476, October.
    10. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    11. Lu, Yingdong, 2008. "Performance analysis for assemble-to-order systems with general renewal arrivals and random batch demands," European Journal of Operational Research, Elsevier, vol. 185(2), pages 635-647, March.
    12. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    13. Saif Benjaafar & Mohsen ElHafsi, 2006. "Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes," Management Science, INFORMS, vol. 52(12), pages 1896-1912, December.
    14. Savas Dayanik & Jing-Sheng Song & Susan H. Xu, 2003. "The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 230-251, December.
    15. Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
    16. Bijvank, Marco & Koole, Ger & Vis, Iris F.A., 2010. "Optimising a general repair kit problem with a service constraint," European Journal of Operational Research, Elsevier, vol. 204(1), pages 76-85, July.
    17. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    18. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    19. Kwan Wee & Maqbool Dada, 2010. "A make-to-stock manufacturing system with component commonality: A queuing approach," IISE Transactions, Taylor & Francis Journals, vol. 42(6), pages 435-453.
    20. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    21. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    22. H Wong & G J van Houtum & D Cattrysse & D Van Oudheusden, 2005. "Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(12), pages 1419-1430, December.
    23. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    24. Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.
    25. Kranenburg, A.A. & van Houtum, G.J., 2009. "A new partial pooling structure for spare parts networks," European Journal of Operational Research, Elsevier, vol. 199(3), pages 908-921, December.
    26. Papadopoulos, H. T., 1996. "A field service support system using a queueing network model and the priority MVA algorithm," Omega, Elsevier, vol. 24(2), pages 195-203, April.
    27. Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.
    28. Franz L. Alt, 1962. "Safety Levels in Military Inventory Management," Operations Research, INFORMS, vol. 10(6), pages 786-794, December.
    29. Zhao, Yao, 2009. "Analysis and evaluation of an Assemble-to-Order system with batch ordering policy and compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 800-809, November.
    30. Yingdong Lu & Jing-Sheng Song & Yao Zhao, 2010. "No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems," Operations Research, INFORMS, vol. 58(3), pages 691-705, June.
    31. Kranenburg, A.A. & Van Houtum, G.J., 2007. "Effect of commonality on spare parts provisioning costs for capital goods," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 221-227, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2020. "Multi-resource emergency supply contracts with asymmetric information in the after-sales services," International Journal of Production Economics, Elsevier, vol. 229(C).
    2. Douniel Lamghari-Idrissi & Roy van Hugten & Geert-Jan van Houtum & Rob Basten, 2022. "Increasing Chip Availability Through a New After-Sales Service Supply Concept at ASML," Interfaces, INFORMS, vol. 52(5), pages 460-470, September.
    3. Wang, Qingwei & Zheng, Meimei & Lee, Ka-Man & Shi, Xiaoqian & Shen, Yichi & Pan, Ershun, 2024. "Optimal product and after-sales service decisions considering risk attitudes under price-dependent uncertain demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 182(C).
    4. Jagadeesan Viswanath & Rajamanickam Thilagavathi & Krishnasamy Karthik & Miroslav Mahdal, 2023. "A Study of a Two Storage Single Product Inventory System with Ramp Type Demand, N-Phase Prepayment and Purchase for Exigency," Mathematics, MDPI, vol. 11(7), pages 1-17, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    2. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    3. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    4. ElHafsi, Mohsen & Fang, Jianxin & Hamouda, Essia, 2020. "A novel decomposition-based method for solving general-product structure assemble-to-order systems," European Journal of Operational Research, Elsevier, vol. 286(1), pages 233-249.
    5. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    6. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    7. Ana Bušić & Ingrid Vliegen & Alan Scheller-Wolf, 2012. "Comparing Markov Chains: Aggregation and Precedence Relations Applied to Sets of States, with Applications to Assemble-to-Order Systems," Mathematics of Operations Research, INFORMS, vol. 37(2), pages 259-287, May.
    8. ElHafsi, Mohsen & Fang, Jianxin & Camus, Herve, 2018. "Optimal control of a continuous-time W-configuration assemble-to-order system," European Journal of Operational Research, Elsevier, vol. 267(3), pages 917-932.
    9. van Jaarsveld, W.L. & Dollevoet, T.A.B., 2011. "Spare parts inventory control for an aircraft component repair shop," Econometric Institute Research Papers EI2011-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    10. David A. Goldberg & Martin I. Reiman & Qiong Wang, 2021. "A Survey of Recent Progress in the Asymptotic Analysis of Inventory Systems," Production and Operations Management, Production and Operations Management Society, vol. 30(6), pages 1718-1750, June.
    11. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    12. Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.
    13. Lijian Lu & Jing‐Sheng Song & Hanqin Zhang, 2015. "Optimal and asymptotically optimal policies for assemble‐to‐order n‐ and W‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(8), pages 617-645, December.
    14. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    15. van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
    16. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    17. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    18. Martin Albrecht, 2021. "Component Allocation in Make-to-stock Assembly Systems," SN Operations Research Forum, Springer, vol. 2(2), pages 1-19, June.
    19. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.
    20. Karaarslan, Gönül A. & Atan, Zümbül & de Kok, Ton & Kiesmüller, Gudrun P., 2018. "Optimal and heuristic policies for assemble-to-order systems with different review periods," European Journal of Operational Research, Elsevier, vol. 271(1), pages 80-96.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:212:y:2019:i:c:p:39-50. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.