IDEAS home Printed from https://ideas.repec.org/r/inm/orinte/v40y2010i3p222-245.html
   My bibliography  Save this item

A Review of Operations Research in Mine Planning

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Michelle L. Blom & Adrian R. Pearce & Peter J. Stuckey, 2016. "A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods," Management Science, INFORMS, vol. 62(10), pages 3059-3084, October.
  2. Cinna Seifi & Marco Schulze & Jürgen Zimmermann, 2021. "Solution procedures for block selection and sequencing in flat-bedded potash underground mines," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(2), pages 409-440, June.
  3. Adrian Becker & Kassem Benabderrazik & Dimitris Bertsimas & Nada Chtinna & Nada El Majdoub & El Miloudi Mahboubi & Driss Lahlou Kitane & Steve Kokkotos & Georgia Mourtzinou & Ilyas Rakhis, 2022. "Toward Global Food Security: Transforming OCP Through Analytics," Interfaces, INFORMS, vol. 52(1), pages 90-107, January.
  4. W. Lambert & A. Newman, 2014. "Tailored Lagrangian Relaxation for the open pit block sequencing problem," Annals of Operations Research, Springer, vol. 222(1), pages 419-438, November.
  5. Marco Schulze & Julia Rieck & Cinna Seifi & Jürgen Zimmermann, 2016. "Machine scheduling in underground mining: an application in the potash industry," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(2), pages 365-403, March.
  6. Yi, Tong & Ma, Fei & Jin, Chun & Huang, Yanjun, 2018. "A novel coupled hydro-pneumatic energy storage system for hybrid mining trucks," Energy, Elsevier, vol. 143(C), pages 704-718.
  7. Mikael Collan & Jyrki Savolainen & Pasi Luukka, 2017. "Investigating the effect of price process selection on the value of a metal mining asset portfolio," Mineral Economics, Springer;Raw Materials Group (RMG);Luleå University of Technology, vol. 30(2), pages 107-115, July.
  8. Kwame Awuah-Offei & Sisi Que & Atta Ur Rehman, 2021. "Evaluating Mine Design Alternatives for Social Risks Using Discrete Choice Analysis," Sustainability, MDPI, vol. 13(16), pages 1-15, August.
  9. Lorenzo Reus & Mathias Belbèze & Hans Feddersen & Enrique Rubio, 2018. "Extraction Planning Under Capacity Uncertainty at the Chuquicamata Underground Mine," Interfaces, INFORMS, vol. 48(6), pages 543-555, November.
  10. Chaowasakoo, Patarawan & Seppälä, Heikki & Koivo, Heikki & Zhou, Quan, 2017. "Improving fleet management in mines: The benefit of heterogeneous match factor," European Journal of Operational Research, Elsevier, vol. 261(3), pages 1052-1065.
  11. Armstrong, Margaret & Lagos, Tomas & Emery, Xavier & Homem-de-Mello, Tito & Lagos, Guido & Sauré, Denis, 2021. "Adaptive open-pit mining planning under geological uncertainty," Resources Policy, Elsevier, vol. 72(C).
  12. Savolainen, Jyrki, 2016. "Real options in metal mining project valuation: Review of literature," Resources Policy, Elsevier, vol. 50(C), pages 49-65.
  13. K. Sirinanda & M. Brazil & P. Grossman & J. Rubinstein & D. Thomas, 2016. "Gradient-constrained discounted Steiner trees I: optimal tree configurations," Journal of Global Optimization, Springer, vol. 64(3), pages 497-513, March.
  14. Lamghari, Amina & Dimitrakopoulos, Roussos, 2016. "Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty," European Journal of Operational Research, Elsevier, vol. 250(1), pages 273-290.
  15. Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Peypouquet, Juan & Reyes, Patricio, 2016. "Aggregation heuristic for the open-pit block scheduling problem," European Journal of Operational Research, Elsevier, vol. 249(3), pages 1169-1177.
  16. Barry King & Alexandra Newman, 2018. "Optimizing the Cutoff Grade for an Operational Underground Mine," Interfaces, INFORMS, vol. 48(4), pages 357-371, August.
  17. K. Sirinanda & M. Brazil & P. Grossman & J. Rubinstein & D. Thomas, 2016. "Gradient-constrained discounted Steiner trees II: optimally locating a discounted Steiner point," Journal of Global Optimization, Springer, vol. 64(3), pages 515-532, March.
  18. Akshay Chowdu & Peter Nesbitt & Andrea Brickey & Alexandra M. Newman, 2022. "Operations Research in Underground Mine Planning: A Review," Interfaces, INFORMS, vol. 52(2), pages 109-132, March.
  19. Castillo, Emilio, 2021. "The impacts of profit-based royalties on early-stage mineral exploration," Resources Policy, Elsevier, vol. 73(C).
  20. Tabesh, Mohammad & Moradi Afrapoli, Ali & Askari-Nasab, Hooman, 2023. "A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines," Resources Policy, Elsevier, vol. 80(C).
  21. Lamghari, Amina & Dimitrakopoulos, Roussos, 2012. "A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 642-652.
  22. Nancel-Penard, Pierre & Morales, Nelson & Cornillier, Fabien, 2022. "A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine block sequencing problem," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1088-1099.
  23. Jyrki Savolainen & Ramin Rakhsha & Richard Durham, 2022. "Simulation-based decision-making system for optimal mine production plan selection," Mineral Economics, Springer;Raw Materials Group (RMG);Luleå University of Technology, vol. 35(2), pages 267-281, June.
  24. Alessandro Hill & Andrea J. Brickey & Italo Cipriano & Marcos Goycoolea & Alexandra Newman, 2022. "Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining," INFORMS Journal on Computing, INFORMS, vol. 34(6), pages 3042-3058, November.
  25. Ta, Chung H. & Ingolfsson, Armann & Doucette, John, 2013. "A linear model for surface mining haul truck allocation incorporating shovel idle probabilities," European Journal of Operational Research, Elsevier, vol. 231(3), pages 770-778.
  26. Camargo, Luis Felipe Riehs & Rodrigues, Luis Henrique & Lacerda, Daniel Pacheco & Piran, Fabio Sartori, 2018. "A method for integrated process simulation in the mining industry," European Journal of Operational Research, Elsevier, vol. 264(3), pages 1116-1129.
  27. Singh, Gaurav & Sier, David & Ernst, Andreas T. & Gavriliouk, Olena & Oyston, Rob & Giles, Tracey & Welgama, Palitha, 2012. "A mixed integer programming model for long term capacity expansion planning: A case study from The Hunter Valley Coal Chain," European Journal of Operational Research, Elsevier, vol. 220(1), pages 210-224.
  28. Rafael Epstein & Marcel Goic & Andrés Weintraub & Jaime Catalán & Pablo Santibáñez & Rodolfo Urrutia & Raúl Cancino & Sergio Gaete & Augusto Aguayo & Felipe Caro, 2012. "Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines," Operations Research, INFORMS, vol. 60(1), pages 4-17, February.
  29. Bisera Andrić Gušavac & Selman Karagoz & Milena Popović & Dragan Pamućar & Muhammet Deveci, 2023. "Reconcilement of conflicting goals: a novel operations research-based methodology for environmental management," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 25(8), pages 7423-7460, August.
  30. Choi, Chul Hun & Eun, Joonyup & Cao, Jinjian & Lee, Seokcheon & Zhao, Fu, 2018. "Global strategic level supply planning of materials critical to clean energy technologies – A case study on indium," Energy, Elsevier, vol. 147(C), pages 950-964.
  31. Nelis, Gonzalo & Morales, Nelson & Jelvez, Enrique, 2023. "Optimal mining cut definition and short-term open pit production scheduling under geological uncertainty," Resources Policy, Elsevier, vol. 81(C).
  32. Steve Batstone & Geoff Pritchard & Golbon Zakeri, 2016. "Noninvasive Test Scheduling in Live Electricity Markets at Transpower New Zealand," Interfaces, INFORMS, vol. 46(6), pages 482-492, December.
  33. Zeng, Lanyan & Liu, Shi Qiang & Kozan, Erhan & Corry, Paul & Masoud, Mahmoud, 2021. "A comprehensive interdisciplinary review of mine supply chain management," Resources Policy, Elsevier, vol. 74(C).
  34. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan & Asad, Mohammad Waqar Ali, 2020. "Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation," Resources Policy, Elsevier, vol. 66(C).
  35. Mehri Aghdamigargari & Sylvester Avane & Angelina Anani & Sefiu O. Adewuyi, 2024. "Sustainability in Long-Term Surface Mine Planning: A Systematic Review of Operations Research Applications," Sustainability, MDPI, vol. 16(22), pages 1-24, November.
  36. Daniel Espinoza & Marcos Goycoolea & Eduardo Moreno & Alexandra Newman, 2013. "MineLib: a library of open pit mining problems," Annals of Operations Research, Springer, vol. 206(1), pages 93-114, July.
  37. Nakousi, C. & Pascual, R. & Anani, A. & Kristjanpoller, F. & Lillo, P., 2018. "An asset-management oriented methodology for mine haul-fleet usage scheduling," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 336-344.
  38. Marco Schulze & Jürgen Zimmermann, 2017. "Staff and machine shift scheduling in a German potash mine," Journal of Scheduling, Springer, vol. 20(6), pages 635-656, December.
  39. Zhang, Jian & Nault, Barrie R. & Dimitrakopoulos, Roussos G., 2019. "Optimizing a mineral value chain with market uncertainty using benders decomposition," European Journal of Operational Research, Elsevier, vol. 274(1), pages 227-239.
  40. César Flores-Fonseca & Rodrigo Linfati & John Willmer Escobar, 2022. "Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines," Operational Research, Springer, vol. 22(3), pages 2529-2553, July.
  41. Amina Lamghari & Roussos Dimitrakopoulos & Jacques Ferland, 2015. "A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines," Journal of Global Optimization, Springer, vol. 63(3), pages 555-582, November.
  42. Gonzalo Muñoz & Daniel Espinoza & Marcos Goycoolea & Eduardo Moreno & Maurice Queyranne & Orlando Rivera Letelier, 2018. "A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project scheduling," Computational Optimization and Applications, Springer, vol. 69(2), pages 501-534, March.
  43. O’Sullivan, Dónal & Newman, Alexandra, 2015. "Optimization-based heuristics for underground mine scheduling," European Journal of Operational Research, Elsevier, vol. 241(1), pages 248-259.
  44. Christina N. Burt & Lou Caccetta, 2014. "Equipment Selection for Surface Mining: A Review," Interfaces, INFORMS, vol. 44(2), pages 143-162, April.
  45. Renaud Chicoisne & Daniel Espinoza & Marcos Goycoolea & Eduardo Moreno & Enrique Rubio, 2012. "A New Algorithm for the Open-Pit Mine Production Scheduling Problem," Operations Research, INFORMS, vol. 60(3), pages 517-528, June.
  46. Sotoudeh, Farzad & Nehring, Micah & Kizil, Mehmet & Knights, Peter & Mousavi, Amin, 2020. "Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions," Resources Policy, Elsevier, vol. 68(C).
  47. Martin L. Smith & Stewart J. Wicks, 2014. "Medium-Term Production Scheduling of the Lumwana Mining Complex," Interfaces, INFORMS, vol. 44(2), pages 176-194, April.
  48. Menezes, Gustavo Campos & dos Santos Corrêa, Juliano, 2022. "Model and algorithms applied to Short-Term Integrated Programming Problem in Mines," Resources Policy, Elsevier, vol. 79(C).
  49. Omotehinse, Adeyinka O. & De Tomi, Giorgio, 2020. "Managing the challenges of obtaining a social license to operate in the pre-mining phase: A focus on the oil sands communities in Ondo State, Nigeria," World Development Perspectives, Elsevier, vol. 18(C).
  50. Menezes, Gustavo Campos & Mateus, Geraldo Robson & Ravetti, Martín Gómez, 2017. "A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports," European Journal of Operational Research, Elsevier, vol. 258(3), pages 926-937.
  51. Yingyu Gu & Guoqing Li & Jie Hou & Chunchao Fan & Xingbang Qiang & Bin Bai & Yongfang Zhang, 2023. "Production Strategy Optimization of Integrated Exploitation for Multiple Deposits Considering Carbon Quota," Sustainability, MDPI, vol. 15(4), pages 1-17, February.
  52. Sylvie C. Bouffard & Peter Boggis & Bryan Monk & Marianela Pereira & Keith Quan & Sandra Fleming, 2017. "Discrete-Event Simulation Modeling Unlocks Value for the Jansen Potash Project," Decision Analysis, INFORMS, vol. 48(01), pages 45-56, February.
  53. Pérez, Juan & Maldonado, Sebastián & González-Ramírez, Rosa, 2018. "Decision support for fleet allocation and contract renegotiation in contracted open-pit mine blasting operations," International Journal of Production Economics, Elsevier, vol. 204(C), pages 59-69.
  54. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan, 2021. "Open-pit mining complex optimization under uncertainty with integrated cut-off grade based destination policies," Resources Policy, Elsevier, vol. 70(C).
  55. K. Sirinanda & M. Brazil & P. Grossman & J. Rubinstein & D. Thomas, 2015. "Maximizing the net present value of a Steiner tree," Journal of Global Optimization, Springer, vol. 62(2), pages 391-407, June.
  56. Michelle L. Blom & Christina N. Burt & Adrian R. Pearce & Peter J. Stuckey, 2014. "A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines," INFORMS Journal on Computing, INFORMS, vol. 26(4), pages 658-676, November.
  57. Noriega, Roberto & Pourrahimian, Yashar, 2022. "A systematic review of artificial intelligence and data-driven approaches in strategic open-pit mine planning," Resources Policy, Elsevier, vol. 77(C).
  58. W. Brian Lambert & Andrea Brickey & Alexandra M. Newman & Kelly Eurek, 2014. "Open-Pit Block-Sequencing Formulations: A Tutorial," Interfaces, INFORMS, vol. 44(2), pages 127-142, April.
  59. Marcus Brazil & Peter Grossman & J. Hyam Rubinstein & Doreen Thomas, 2014. "Improving Underground Mine Access Layouts Using Software Tools," Interfaces, INFORMS, vol. 44(2), pages 195-203, April.
  60. Arango-Aramburo, Santiago & Jaramillo, Patricia & Olaya, Yris & Smith, Ricardo & Restrepo, Oscar J. & Saldarriaga-Isaza, Adrián & Arias-Gaviria, Jessica & Parra, Juan F. & Larsen, Erik R. & Gomez-Rios, 2017. "Simulating mining policies in developing countries: The case of Colombia," Socio-Economic Planning Sciences, Elsevier, vol. 60(C), pages 99-113.
  61. Lamghari, Amina & Dimitrakopoulos, Roussos, 2016. "Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty," European Journal of Operational Research, Elsevier, vol. 253(3), pages 843-855.
  62. Steiner, Gerald & Geissler, Bernhard & Watson, Ingrid & Mew, Michael C., 2015. "Efficiency developments in phosphate rock mining over the last three decades," Resources, Conservation & Recycling, Elsevier, vol. 105(PB), pages 235-245.
  63. Zhang, Jian & Dimitrakopoulos, Roussos G., 2017. "A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty," European Journal of Operational Research, Elsevier, vol. 258(2), pages 617-625.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.