Decision support for fleet allocation and contract renegotiation in contracted open-pit mine blasting operations

Author

Listed:
  • Pérez, Juan
  • Maldonado, Sebastián
  • González-Ramírez, Rosa

Abstract

In the current copper mining scenario, where prices are decreasing and pits are larger, there is a pressing need for increasing operational productivity. This is particularly important for mining contractors, who are constantly facing the additional pressure of obsolescence if they are not able to provide cost-savings for mine owners. In this paper, we deal with operational efficiency for blasting operations in open-pit mine sites, and propose a framework for minimizing truck allocation costs with hazardous materials based on mathematical programming. Apart from reducing operational costs, the proposed research allows contractors to re-negotiate contracts with mine owners. An integrated model for blasting operation is proposed, taking into account multiple owners with various open pits, each one of them having multiple blasting grids. The main methodological contribution is the inclusion of specially tailored constraints for modelling the blending requirements for the on-delivery production of the explosives, an important aspect given the hazardous nature of the chemical compounds that are transported. The proposed framework was implemented by a Chilean contractor, leading to savings up to 15% of the total operational costs and allowing better tactical decisions, as contract renegotiation or fleet design.

Suggested Citation

  • Pérez, Juan & Maldonado, Sebastián & González-Ramírez, Rosa, 2018. "Decision support for fleet allocation and contract renegotiation in contracted open-pit mine blasting operations," International Journal of Production Economics, Elsevier, vol. 204(C), pages 59-69.
  • Handle: RePEc:eee:proeco:v:204:y:2018:i:c:p:59-69
    DOI: 10.1016/j.ijpe.2018.07.024
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318302901
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.07.024?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Zografos, Konstantinos G. & Androutsopoulos, Konstantinos N., 2004. "A heuristic algorithm for solving hazardous materials distribution problems," European Journal of Operational Research, Elsevier, vol. 152(2), pages 507-519, January.
    2. Shi, Ning & Song, Haiqing & Powell, Warren B., 2014. "The dynamic fleet management problem with uncertain demand and customer chosen service level," International Journal of Production Economics, Elsevier, vol. 148(C), pages 110-121.
    3. J. Pérez & S. Maldonado & V. Marianov, 2016. "A reconfiguration of fire station and fleet locations for the Santiago Fire Department," International Journal of Production Research, Taylor & Francis Journals, vol. 54(11), pages 3170-3186, June.
    4. Matamoros, Martha E. Villalba & Dimitrakopoulos, Roussos, 2016. "Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions," European Journal of Operational Research, Elsevier, vol. 255(3), pages 911-921.
    5. Alexandra M. Newman & Enrique Rubio & Rodrigo Caro & Andrés Weintraub & Kelly Eurek, 2010. "A Review of Operations Research in Mine Planning," Interfaces, INFORMS, vol. 40(3), pages 222-245, June.
    6. Pradhananga, Rojee & Taniguchi, Eiichi & Yamada, Tadashi & Qureshi, Ali Gul, 2014. "Bi-objective decision support system for routing and scheduling of hazardous materials," Socio-Economic Planning Sciences, Elsevier, vol. 48(2), pages 135-148.
    7. Souza, M.J.F. & Coelho, I.M. & Ribas, S. & Santos, H.G. & Merschmann, L.H.C., 2010. "A hybrid heuristic algorithm for the open-pit-mining operational planning problem," European Journal of Operational Research, Elsevier, vol. 207(2), pages 1041-1051, December.
    8. Everett, J.E., 2007. "Computer aids for production systems management in iron ore mining," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 213-223, October.
    9. Patel, Minnie H. & Horowitz, Alan J., 1994. "Optimal routing of hazardous materials considering risk of spill," Transportation Research Part A: Policy and Practice, Elsevier, vol. 28(2), pages 119-132, March.
    10. Kusi-Sarpong, Simonov & Sarkis, Joseph & Wang, Xuping, 2016. "Assessing green supply chain practices in the Ghanaian mining industry: A framework and evaluation," International Journal of Production Economics, Elsevier, vol. 181(PB), pages 325-341.
    11. Rafael Epstein & Marcel Goic & Andrés Weintraub & Jaime Catalán & Pablo Santibáñez & Rodolfo Urrutia & Raúl Cancino & Sergio Gaete & Augusto Aguayo & Felipe Caro, 2012. "Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines," Operations Research, INFORMS, vol. 60(1), pages 4-17, February.
    12. Cheng, Chun & Qi, Mingyao & Wang, Xingyi & Zhang, Ying, 2016. "Multi-period inventory routing problem under carbon emission regulations," International Journal of Production Economics, Elsevier, vol. 182(C), pages 263-275.
    13. Peter McKenzie & Alexandra M. Newman & Luis Tenorio, 2008. "Front Range Aggregates Optimizes Feeder Movements at Its Quarry," Interfaces, INFORMS, vol. 38(6), pages 436-447, December.
    14. Christina N. Burt & Lou Caccetta, 2014. "Equipment Selection for Surface Mining: A Review," Interfaces, INFORMS, vol. 44(2), pages 143-162, April.
    15. Martin L. Smith & Stewart J. Wicks, 2014. "Medium-Term Production Scheduling of the Lumwana Mining Complex," Interfaces, INFORMS, vol. 44(2), pages 176-194, April.
    16. Topal, Erkan & Ramazan, Salih, 2010. "A new MIP model for mine equipment scheduling by minimizing maintenance cost," European Journal of Operational Research, Elsevier, vol. 207(2), pages 1065-1071, December.
    17. Michelle L. Blom & Christina N. Burt & Adrian R. Pearce & Peter J. Stuckey, 2014. "A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines," INFORMS Journal on Computing, INFORMS, vol. 26(4), pages 658-676, November.
    18. Sgurev, V. & Vassilev, V. & Dokev, N. & Genova, K. & Drangajov, S. & Korsemov, Ch. & Atanassov, A., 1989. "TRASY -- An automated system for real-time control of the industrial truck haulage in open-pit mines," European Journal of Operational Research, Elsevier, vol. 43(1), pages 44-52, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zeng, Lanyan & Liu, Shi Qiang & Kozan, Erhan & Corry, Paul & Masoud, Mahmoud, 2021. "A comprehensive interdisciplinary review of mine supply chain management," Resources Policy, Elsevier, vol. 74(C).
    2. Chaowasakoo, Patarawan & Seppälä, Heikki & Koivo, Heikki & Zhou, Quan, 2017. "Improving fleet management in mines: The benefit of heterogeneous match factor," European Journal of Operational Research, Elsevier, vol. 261(3), pages 1052-1065.
    3. Nakousi, C. & Pascual, R. & Anani, A. & Kristjanpoller, F. & Lillo, P., 2018. "An asset-management oriented methodology for mine haul-fleet usage scheduling," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 336-344.
    4. Michelle L. Blom & Christina N. Burt & Adrian R. Pearce & Peter J. Stuckey, 2014. "A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines," INFORMS Journal on Computing, INFORMS, vol. 26(4), pages 658-676, November.
    5. Zhang, Jian & Nault, Barrie R. & Dimitrakopoulos, Roussos G., 2019. "Optimizing a mineral value chain with market uncertainty using benders decomposition," European Journal of Operational Research, Elsevier, vol. 274(1), pages 227-239.
    6. Michelle L. Blom & Adrian R. Pearce & Peter J. Stuckey, 2016. "A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods," Management Science, INFORMS, vol. 62(10), pages 3059-3084, October.
    7. Lamghari, Amina & Dimitrakopoulos, Roussos, 2012. "A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 642-652.
    8. Mohri, Seyed Sina & Mohammadi, Mehrdad & Gendreau, Michel & Pirayesh, Amir & Ghasemaghaei, Ali & Salehi, Vahid, 2022. "Hazardous material transportation problems: A comprehensive overview of models and solution approaches," European Journal of Operational Research, Elsevier, vol. 302(1), pages 1-38.
    9. Sheng Dong & Jibiao Zhou & Changxi Ma, 2020. "Design of a Network Optimization Platform for the Multivehicle Transportation of Hazardous Materials," IJERPH, MDPI, vol. 17(3), pages 1-14, February.
    10. Jiskani, Izhar Mithal & Cai, Qingxiang & Zhou, Wei & Ali Shah, Syed Ahsan, 2021. "Green and climate-smart mining: A framework to analyze open-pit mines for cleaner mineral production," Resources Policy, Elsevier, vol. 71(C).
    11. King, Barry & Goycoolea, Marcos & Newman, A., 2017. "Optimizing the open pit-to-underground mining transition," European Journal of Operational Research, Elsevier, vol. 257(1), pages 297-309.
    12. César Flores-Fonseca & Rodrigo Linfati & John Willmer Escobar, 2022. "Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines," Operational Research, Springer, vol. 22(3), pages 2529-2553, July.
    13. Zandieh, Fatemeh & Ghannadpour, Seyed Farid, 2023. "A comprehensive risk assessment view on interval type-2 fuzzy controller for a time-dependent HazMat routing problem," European Journal of Operational Research, Elsevier, vol. 305(2), pages 685-707.
    14. Christina N. Burt & Lou Caccetta, 2014. "Equipment Selection for Surface Mining: A Review," Interfaces, INFORMS, vol. 44(2), pages 143-162, April.
    15. Changxi Ma & Wei Hao & Fuquan Pan & Wang Xiang, 2018. "Road screening and distribution route multi-objective robust optimization for hazardous materials based on neural network and genetic algorithm," PLOS ONE, Public Library of Science, vol. 13(6), pages 1-22, June.
    16. Martin L. Smith & Stewart J. Wicks, 2014. "Medium-Term Production Scheduling of the Lumwana Mining Complex," Interfaces, INFORMS, vol. 44(2), pages 176-194, April.
    17. Tabesh, Mohammad & Moradi Afrapoli, Ali & Askari-Nasab, Hooman, 2023. "A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines," Resources Policy, Elsevier, vol. 80(C).
    18. Noriega, Roberto & Pourrahimian, Yashar, 2022. "A systematic review of artificial intelligence and data-driven approaches in strategic open-pit mine planning," Resources Policy, Elsevier, vol. 77(C).
    19. Moradi Afrapoli, Ali & Tabesh, Mohammad & Askari-Nasab, Hooman, 2019. "A multiple objective transportation problem approach to dynamic truck dispatching in surface mines," European Journal of Operational Research, Elsevier, vol. 276(1), pages 331-342.
    20. Cinna Seifi & Marco Schulze & Jürgen Zimmermann, 2021. "Solution procedures for block selection and sequencing in flat-bedded potash underground mines," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(2), pages 409-440, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:204:y:2018:i:c:p:59-69. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.