Using constraint programming to address the operational aircraft line maintenance scheduling problem
Author
Abstract
Suggested Citation
DOI: 10.1016/j.jairtraman.2024.102537
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Diego Klabjan, 2005. "Large-Scale Models in the Airline Industry," Springer Books, in: Guy Desaulniers & Jacques Desrosiers & Marius M. Solomon (ed.), Column Generation, chapter 0, pages 163-195, Springer.
- Mireille Palpant & Christian Artigues & Philippe Michelon, 2004. "LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search," Annals of Operations Research, Springer, vol. 131(1), pages 237-257, October.
- Ram Gopalan & Kalyan T. Talluri, 1998. "The Aircraft Maintenance Routing Problem," Operations Research, INFORMS, vol. 46(2), pages 260-271, April.
- A. Alan B. Pritsker & Lawrence J. Waiters & Philip M. Wolfe, 1969. "Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach," Management Science, INFORMS, vol. 16(1), pages 93-108, September.
- Kalyan T. Talluri, 1998. "The Four-Day Aircraft Maintenance Routing Problem," Transportation Science, INFORMS, vol. 32(1), pages 43-53, February.
- Witteman, Max & Deng, Qichen & Santos, Bruno F., 2021. "A bin packing approach to solve the aircraft maintenance task allocation problem," European Journal of Operational Research, Elsevier, vol. 294(1), pages 365-376.
- Brailsford, Sally C. & Potts, Chris N. & Smith, Barbara M., 1999. "Constraint satisfaction problems: Algorithms and applications," European Journal of Operational Research, Elsevier, vol. 119(3), pages 557-581, December.
- Christofides, Nicos & Alvarez-Valdes, R. & Tamarit, J. M., 1987. "Project scheduling with resource constraints: A branch and bound approach," European Journal of Operational Research, Elsevier, vol. 29(3), pages 262-273, June.
- Moudani, Walid El & Mora-Camino, Félix, 2000. "A dynamic approach for aircraft assignment and maintenance scheduling by airlines," Journal of Air Transport Management, Elsevier, vol. 6(4), pages 233-237.
- Carlier, Jacques, 1982. "The one-machine sequencing problem," European Journal of Operational Research, Elsevier, vol. 11(1), pages 42-47, September.
- Sarac, Abdulkadir & Batta, Rajan & Rump, Christopher M., 2006. "A branch-and-price approach for operational aircraft maintenance routing," European Journal of Operational Research, Elsevier, vol. 175(3), pages 1850-1869, December.
- Thomas A. Feo & Jonathan F. Bard, 1989. "Flight Scheduling and Maintenance Base Planning," Management Science, INFORMS, vol. 35(12), pages 1415-1432, December.
- Başdere, Mehmet & Bilge, Ümit, 2014. "Operational aircraft maintenance routing problem with remaining time consideration," European Journal of Operational Research, Elsevier, vol. 235(1), pages 315-328.
- António Abreu & Rúben Piedade, 2018. "Decision Support Model in the Strategic Management of the Portuguese Air Force Alpha Jet Fleet," Asian Journal of Social Sciences and Management Studies, Asian Online Journal Publishing Group, vol. 5(3), pages 72-81.
- N. J. Boere, 1977. "Air Canada Saves with Aircraft Maintenance Scheduling," Interfaces, INFORMS, vol. 7(3), pages 1-13, May.
- Shaukat, Syed & Katscher, Mathias & Wu, Cheng-Lung & Delgado, Felipe & Larrain, Homero, 2020. "Aircraft line maintenance scheduling and optimisation," Journal of Air Transport Management, Elsevier, vol. 89(C).
- Olivier Liess & Philippe Michelon, 2008. "A constraint programming approach for the resource-constrained project scheduling problem," Annals of Operations Research, Springer, vol. 157(1), pages 25-36, January.
- Mohamed Haouari & Shengzhi Shao & Hanif D. Sherali, 2013. "A Lifted Compact Formulation for the Daily Aircraft Maintenance Routing Problem," Transportation Science, INFORMS, vol. 47(4), pages 508-525, November.
- L. W. Clarke & C. A. Hane & E. L. Johnson & G. L. Nemhauser, 1996. "Maintenance and Crew Considerations in Fleet Assignment," Transportation Science, INFORMS, vol. 30(3), pages 249-260, August.
- Sami Gabteni & Mattias Grönkvist, 2009. "Combining column generation and constraint programming to solve the tail assignment problem," Annals of Operations Research, Springer, vol. 171(1), pages 61-76, October.
- Deng, Qichen & Santos, Bruno F. & Curran, Richard, 2020. "A practical dynamic programming based methodology for aircraft maintenance check scheduling optimization," European Journal of Operational Research, Elsevier, vol. 281(2), pages 256-273.
- Karla L. Hoffman & Manfred Padberg, 1993. "Solving Airline Crew Scheduling Problems by Branch-and-Cut," Management Science, INFORMS, vol. 39(6), pages 657-682, June.
- Klaus Neumann & Christoph Schwindt, 2003. "Project scheduling with inventory constraints," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 56(3), pages 513-533, January.
- Erik L. Demeulemeester & Willy S. Herroelen, 1997. "New Benchmark Results for the Resource-Constrained Project Scheduling Problem," Management Science, INFORMS, vol. 43(11), pages 1485-1492, November.
- Deng, Qichen & Santos, Bruno F., 2022. "Lookahead approximate dynamic programming for stochastic aircraft maintenance check scheduling optimization," European Journal of Operational Research, Elsevier, vol. 299(3), pages 814-833.
- António Abreu & Rúben Piedade, 2018. "Decision Support Model in the Strategic Management of the Portuguese Air Force Alpha Jet Fleet," Asian Journal of Social Sciences and Management Studies, Asian Online Journal Publishing Group, vol. 5(3), pages 72-81.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Carlos Lagos & Felipe Delgado & Mathias A. Klapp, 2020. "Dynamic Optimization for Airline Maintenance Operations," Transportation Science, INFORMS, vol. 54(4), pages 998-1015, July.
- Xu, Yifan & Wandelt, Sebastian & Sun, Xiaoqian, 2021. "Airline integrated robust scheduling with a variable neighborhood search based heuristic," Transportation Research Part B: Methodological, Elsevier, vol. 149(C), pages 181-203.
- Amos Levin, 1971. "Scheduling and Fleet Routing Models for Transportation Systems," Transportation Science, INFORMS, vol. 5(3), pages 232-255, August.
- Sherali, Hanif D. & Bish, Ebru K. & Zhu, Xiaomei, 2006. "Airline fleet assignment concepts, models, and algorithms," European Journal of Operational Research, Elsevier, vol. 172(1), pages 1-30, July.
- Cynthia Barnhart & Peter Belobaba & Amedeo R. Odoni, 2003. "Applications of Operations Research in the Air Transport Industry," Transportation Science, INFORMS, vol. 37(4), pages 368-391, November.
- Manoj Lohatepanont & Cynthia Barnhart, 2004. "Airline Schedule Planning: Integrated Models and Algorithms for Schedule Design and Fleet Assignment," Transportation Science, INFORMS, vol. 38(1), pages 19-32, February.
- Sriram, Chellappan & Haghani, Ali, 2003. "An optimization model for aircraft maintenance scheduling and re-assignment," Transportation Research Part A: Policy and Practice, Elsevier, vol. 37(1), pages 29-48, January.
- Wen, Xin & Sun, Xuting & Ma, Hoi-Lam & Sun, Yige, 2022. "A column generation approach for operational flight scheduling and aircraft maintenance routing," Journal of Air Transport Management, Elsevier, vol. 105(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Shaukat, Syed & Katscher, Mathias & Wu, Cheng-Lung & Delgado, Felipe & Larrain, Homero, 2020. "Aircraft line maintenance scheduling and optimisation," Journal of Air Transport Management, Elsevier, vol. 89(C).
- Safaei, Nima & Jardine, Andrew K.S., 2018. "Aircraft routing with generalized maintenance constraints," Omega, Elsevier, vol. 80(C), pages 111-122.
- Deng, Qichen & Santos, Bruno F., 2022. "Lookahead approximate dynamic programming for stochastic aircraft maintenance check scheduling optimization," European Journal of Operational Research, Elsevier, vol. 299(3), pages 814-833.
- Carlos Lagos & Felipe Delgado & Mathias A. Klapp, 2020. "Dynamic Optimization for Airline Maintenance Operations," Transportation Science, INFORMS, vol. 54(4), pages 998-1015, July.
- Başdere, Mehmet & Bilge, Ümit, 2014. "Operational aircraft maintenance routing problem with remaining time consideration," European Journal of Operational Research, Elsevier, vol. 235(1), pages 315-328.
- Mohamed Haouari & Shengzhi Shao & Hanif D. Sherali, 2013. "A Lifted Compact Formulation for the Daily Aircraft Maintenance Routing Problem," Transportation Science, INFORMS, vol. 47(4), pages 508-525, November.
- He, Yonghuan & Ma, Hoi-Lam & Park, Woo-Yong & Liu, Shi Qiang & Chung, Sai-Ho, 2023. "Maximizing robustness of aircraft routing with heterogeneous maintenance tasks," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 177(C).
- Sanchez, David Torres & Boyacı, Burak & Zografos, Konstantinos G., 2020. "An optimisation framework for airline fleet maintenance scheduling with tail assignment considerations," Transportation Research Part B: Methodological, Elsevier, vol. 133(C), pages 142-164.
- Zhe Liang & Wanpracha Art Chaovalitwongse & Huei Chuen Huang & Ellis L. Johnson, 2011. "On a New Rotation Tour Network Model for Aircraft Maintenance Routing Problem," Transportation Science, INFORMS, vol. 45(1), pages 109-120, February.
- Maher, Stephen J. & Desaulniers, Guy & Soumis, François, 2018. "The daily tail assignment problem under operational uncertainty using look-ahead maintenance constraints," European Journal of Operational Research, Elsevier, vol. 264(2), pages 534-547.
- Zhe Liang & Wanpracha Art Chaovalitwongse, 2013. "A Network-Based Model for the Integrated Weekly Aircraft Maintenance Routing and Fleet Assignment Problem," Transportation Science, INFORMS, vol. 47(4), pages 493-507, November.
- Khaled, Oumaima & Minoux, Michel & Mousseau, Vincent & Michel, Stéphane & Ceugniet, Xavier, 2018. "A compact optimization model for the tail assignment problem," European Journal of Operational Research, Elsevier, vol. 264(2), pages 548-557.
- van Kessel, Paul J. & Freeman, Floris C. & Santos, Bruno F., 2023. "Airline maintenance task rescheduling in a disruptive environment," European Journal of Operational Research, Elsevier, vol. 308(2), pages 605-621.
- Xiao, Fan & Guo, Siqi & Huang, Lin & Huang, Lei & Liang, Zhe, 2022. "Integrated aircraft tail assignment and cargo routing problem with through cargo consideration," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 328-351.
- F M Zeghal & M Haouari & H D Sherali & N Aissaoui, 2011. "Flexible aircraft fleeting and routing at TunisAir," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(2), pages 368-380, February.
- Saltzman, Robert M. & Stern, Helman I., 2022. "The multi-day aircraft maintenance routing problem," Journal of Air Transport Management, Elsevier, vol. 102(C).
- Haouari, Mohamed & Aissaoui, Najla & Mansour, Farah Zeghal, 2009. "Network flow-based approaches for integrated aircraft fleeting and routing," European Journal of Operational Research, Elsevier, vol. 193(2), pages 591-599, March.
- Chunhua Gao & Ellis Johnson & Barry Smith, 2009. "Integrated Airline Fleet and Crew Robust Planning," Transportation Science, INFORMS, vol. 43(1), pages 2-16, February.
- Hanif D. Sherali & Ki-Hwan Bae & Mohamed Haouari, 2013. "An Integrated Approach for Airline Flight Selection and Timing, Fleet Assignment, and Aircraft Routing," Transportation Science, INFORMS, vol. 47(4), pages 455-476, November.
- Liang, Zhe & Feng, Yuan & Zhang, Xiaoning & Wu, Tao & Chaovalitwongse, Wanpracha Art, 2015. "Robust weekly aircraft maintenance routing problem and the extension to the tail assignment problem," Transportation Research Part B: Methodological, Elsevier, vol. 78(C), pages 238-259.
More about this item
Keywords
Aircraft line maintenance planning; Operational maintenance; Optimization scheduling; Industrial use case; Multi-objective; Constraint programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jaitra:v:115:y:2024:i:c:s0969699724000024. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/journal-of-air-transport-management/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.