IDEAS home Printed from https://ideas.repec.org/a/eee/jaitra/v10y2004i3p217-221.html
   My bibliography  Save this article

The material requirements planning system for aircraft maintenance and inventory control: a note

Author

Listed:
  • Ghobbar, Adel A.
  • Friend, Chris H.

Abstract

Airline operators and maintenance organizations were queried regarding their maintenance and inventory procedures. Of 175 respondents, 152 were using the reorder point system, and the remainder the material requirements planning (MRP) system. The survey was intended to examine the experience of companies using MRP. It indicates that the aircraft parts industry takes this system seriously. However, it is more difficult to implement in the aircraft maintenance environment than in a commercial environment, where the need for spare parts is unpredictable. But if the obstacles are understood and a sound plan is realised by good management, MRP can be successfully implemented, with substantial benefits.

Suggested Citation

  • Ghobbar, Adel A. & Friend, Chris H., 2004. "The material requirements planning system for aircraft maintenance and inventory control: a note," Journal of Air Transport Management, Elsevier, vol. 10(3), pages 217-221.
  • Handle: RePEc:eee:jaitra:v:10:y:2004:i:3:p:217-221
    DOI: 10.1016/j.jairtraman.2003.10.001
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0969699703000735
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.jairtraman.2003.10.001?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Joseph D. Blackburn & Dean H. Kropp & Robert A. Millen, 1986. "A Comparison of Strategies to Dampen Nervousness in MRP Systems," Management Science, INFORMS, vol. 32(4), pages 413-429, April.
    2. Hamid, Aziz A. & Agus, Arawati & Mat Hassan, Mohd. Ezani, 1991. "Computerised materials requirement planning in manufacturing companies in Malaysia," International Journal of Production Economics, Elsevier, vol. 25(1-3), pages 73-79.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Gu, Jingyao & Zhang, Guoqing & Li, Kevin W., 2015. "Efficient aircraft spare parts inventory management under demand uncertainty," Journal of Air Transport Management, Elsevier, vol. 42(C), pages 101-109.
    2. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
    3. Regattieri, A. & Giazzi, A. & Gamberi, M. & Gamberini, R., 2015. "An innovative method to optimize the maintenance policies in an aircraft: General framework and case study," Journal of Air Transport Management, Elsevier, vol. 44, pages 8-20.
    4. Yongquan, Sun & Xi, Chen & He, Ren & Yingchao, Jin & Quanwu, Liu, 2016. "Ordering decision-making methods on spare parts for a new aircraft fleet based on a two-sample prediction," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 40-50.
    5. Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
    6. Regattieri, A. & Gamberi, M. & Gamberini, R. & Manzini, R., 2005. "Managing lumpy demand for aircraft spare parts," Journal of Air Transport Management, Elsevier, vol. 11(6), pages 426-431.
    7. Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2022. "Enhancing capacity planning through forecasting: An integrated tool for maintenance of complex product systems," International Journal of Forecasting, Elsevier, vol. 38(1), pages 178-192.
    8. Reményi, Christoph & Staudacher, Stephan, 2014. "Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 94-107.
    9. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Kok, Ton & Inderfurth, Karl, 1997. "Nervousness in inventory management: Comparison of basic control rules," European Journal of Operational Research, Elsevier, vol. 103(1), pages 55-82, November.
    2. Özen, Ulaş & Doğru, Mustafa K. & Armagan Tarim, S., 2012. "Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem," Omega, Elsevier, vol. 40(3), pages 348-357.
    3. Salewski, Frank & Nissen, Rüdiger, 1993. "Revidierende hierarchische Planung: Ein Konzept am Beispiel der Personaleinsatzplanung in Wirtschaftsprüfungsgesellschaften," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 335, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    4. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
    5. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    6. Daniel Thiel, 1998. "Mise en évidence de l'instabilité des modèles de réapprovisionnement continu par une analyse dynamique des systèmes logistiques," Économie rurale, Programme National Persée, vol. 245(1), pages 56-68.
    7. Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
    8. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    9. Kilic, Onur A. & Tarim, S. Armagan, 2011. "An investigation of setup instability in non-stationary stochastic inventory systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 286-292, September.
    10. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
    11. Manthou, Vassiliki & Vlachopoulou, Maro & Theodorou, Petros, 1996. "The implementation and use of material requirements planning system in Northern Greece: A case study," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 187-193, August.
    12. Wijngaard, J., 2004. "The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case," European Journal of Operational Research, Elsevier, vol. 159(1), pages 95-109, November.
    13. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
    14. van Donselaar, K. & van den Nieuwenhof, J. & Visschers, J., 2000. "The impact of material coordination concepts on planning stability in supply chains," International Journal of Production Economics, Elsevier, vol. 68(2), pages 169-176, November.
    15. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
    16. Demirel, Edil & Özelkan, Ertunga C. & Lim, Churlzu, 2018. "Aggregate planning with Flexibility Requirements Profile," International Journal of Production Economics, Elsevier, vol. 202(C), pages 45-58.
    17. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    18. Tarim, S. Armagan & Kingsman, Brian G., 2006. "Modelling and computing (Rn, Sn) policies for inventory systems with non-stationary stochastic demand," European Journal of Operational Research, Elsevier, vol. 174(1), pages 581-599, October.
    19. Salewski, Frank, 1994. "An integrative approach to audit-staff scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 358, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    20. Clark, Alistair R., 2003. "Optimization approximations for capacity constrained material requirements planning," International Journal of Production Economics, Elsevier, vol. 84(2), pages 115-131, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jaitra:v:10:y:2004:i:3:p:217-221. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/journal-of-air-transport-management/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.