My bibliography
Save this item
An overview of recent literature on spare parts inventories
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
- R. Sundarraj, 2006. "A model for standardizing human decisions concerning service-contracts management," Annals of Operations Research, Springer, vol. 143(1), pages 171-189, March.
- Katarzyna Grondys, 2013. "Theory Of Spare Parts Inventory Management For Production Equipment," Advanced Logistic systems, University of Miskolc, Department of Material Handling and Logistics, vol. 7(1), pages 37-42, December.
- Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
- Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
- Ruifeng Yang & Jianshe Kang & Qiwei Hu, 2018. "Integrated maintenance policy optimization with finite spares," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(5), pages 1014-1021, October.
- Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
- van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
- Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
- Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
- Vliegen, I.M.H. & Kleingeld, P.A.M. & van Houtum, G.J., 2010. "Separate tools or tool kits: An exploratory study of engineers' preferences," International Journal of Production Economics, Elsevier, vol. 125(1), pages 173-184, May.
- Trimp, M.E. & Sinnema, S.M. & Dekker, R. & Teunter, R.H., 2004. "Optimise initial spare parts inventories: an analysis and improvement of an electronic decision tool," Econometric Institute Research Papers EI 2004-52, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
- Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
- Romeijnders, Ward & Teunter, Ruud & van Jaarsveld, Willem, 2012. "A two-step method for forecasting spare parts demand using information on component repairs," European Journal of Operational Research, Elsevier, vol. 220(2), pages 386-393.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Michael Dreyfuss & Alan Stulman, 2018. "Waiting time distribution for an exchangeable item repair system with up to two failed components," Annals of Operations Research, Springer, vol. 261(1), pages 167-184, February.
- Olde Keizer, Minou C.A. & Teunter, Ruud H. & Veldman, Jasper, 2017. "Joint condition-based maintenance and inventory optimization for systems with multiple components," European Journal of Operational Research, Elsevier, vol. 257(1), pages 209-222.
- Johnson, Andrew & Carnovale, Steven & Song, Ju Myung & Zhao, Yao, 2021. "Drivers of fulfillment performance in mission critical logistics systems: An empirical analysis," International Journal of Production Economics, Elsevier, vol. 237(C).
- Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
- D Louit & R Pascual & D Banjevic & A K S Jardine, 2011. "Optimization models for critical spare parts inventories—a reliability approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 992-1004, June.
- Antti Puurunen & Jukka Majava & Hanna Kropsu-Vehkapera & Pekka Kess, 2013. "Applicaability of the (Q,R)-Model in Maintenance Meterials Management," Diversity, Technology, and Innovation for Operational Competitiveness: Proceedings of the 2013 International Conference on Technology Innovation and Industrial Management,, ToKnowPress.
- Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
- Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022.
"Forecasting: theory and practice,"
International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
- Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
- Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
- Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
- Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
- Usman Ali & Bashir Salah & Khawar Naeem & Abdul Salam Khan & Razaullah Khan & Catalin Iulian Pruncu & Muhammad Abas & Saadat Khan, 2020. "Improved MRO Inventory Management System in Oil and Gas Company: Increased Service Level and Reduced Average Inventory Investment," Sustainability, MDPI, vol. 12(19), pages 1-19, September.
- van Wingerden, E. & Basten, R.J.I. & Dekker, R. & Rustenburg, W.D., 2014. "More grip on inventory control through improved forecasting: A comparative study at three companies," International Journal of Production Economics, Elsevier, vol. 157(C), pages 220-237.
- Krikke, H.R. & van der Laan, E., 2009.
"Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems,"
Other publications TiSEM
c1a3c438-6d31-4147-afd7-8, Tilburg University, School of Economics and Management.
- Krikke, H.R. & van der Laan, E., 2009. "Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems," Discussion Paper 2009-66, Tilburg University, Center for Economic Research.
- Ramez Kian & Tolga Bektaş & Djamila Ouelhadj, 2019. "Optimal spare parts management for vessel maintenance scheduling," Annals of Operations Research, Springer, vol. 272(1), pages 323-353, January.
- Juha Lukkarinen & Jukka Majava, 2020. "Supplies Inventory Management in a Corporation Context: A Case Study," International Journal of Management, Knowledge and Learning, International School for Social and Business Studies, Celje, Slovenia, vol. 9(2), pages 169-184.
- Boliang Lin & Jiaxi Wang & Huasheng Wang & Zhongkai Wang & Jian Li & Ruixi Lin & Jie Xiao & Jianping Wu, 2017. "Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains," PLOS ONE, Public Library of Science, vol. 12(5), pages 1-18, May.
- Sinan Apak, 2015. "A Bayesian Approach Proposal For Inventory Cost and Demand Forecasting," Alphanumeric Journal, Bahadir Fatih Yildirim, vol. 3(2), pages 41-48, December.
- Wakiru, James M. & Pintelon, Liliane & Muchiri, Peter N. & Chemweno, Peter K., 2019. "A simulation-based optimization approach evaluating maintenance and spare parts demand interaction effects," International Journal of Production Economics, Elsevier, vol. 208(C), pages 329-342.
- Minjae Park & Ki Mun Jung & Dong Ho Park, 2016. "Optimal warranty policies considering repair service and replacement service under the manufacturer’s perspective," Annals of Operations Research, Springer, vol. 244(1), pages 117-132, September.
- Nooshin Salari & Viliam Makis, 2020. "Joint maintenance and just-in-time spare parts provisioning policy for a multi-unit production system," Annals of Operations Research, Springer, vol. 287(1), pages 351-377, April.
- Pascual, Rodrigo & Santelices, Gabriel & Lüer-Villagra, Armin & Vera, Jorge & Cawley, Alejandro Mac, 2017. "Optimal repairable spare-parts procurement policy under total business volume discount environment," Reliability Engineering and System Safety, Elsevier, vol. 159(C), pages 276-282.
- Bijvank, Marco & Vis, Iris F.A., 2011. "Lost-sales inventory theory: A review," European Journal of Operational Research, Elsevier, vol. 215(1), pages 1-13, November.
- Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
- Chekurov, Sergei & Metsä-Kortelainen, Sini & Salmi, Mika & Roda, Irene & Jussila, Ari, 2018. "The perceived value of additively manufactured digital spare parts in industry: An empirical investigation," International Journal of Production Economics, Elsevier, vol. 205(C), pages 87-97.
- van Gils, Teun & Caris, An & Ramaekers, Katrien & Braekers, Kris, 2019. "Formulating and solving the integrated batching, routing, and picker scheduling problem in a real-life spare parts warehouse," European Journal of Operational Research, Elsevier, vol. 277(3), pages 814-830.
- Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
- Rainer Kleber & Tobias Schulz & Guido Voigt, 2009. "Dynamic buy-back for product recovery in end-of-life spare parts procurement," FEMM Working Papers 09026, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
- Ernesto Armando Pacheco-Velázquez & Manuel Robles-Cárdenas & Saúl Juárez Ordóñez & Abelardo Ernesto Damy Solís & Leopoldo Eduardo Cárdenas-Barrón, 2023. "A Heuristic Model for Spare Parts Stocking Based on Markov Chains," Mathematics, MDPI, vol. 11(16), pages 1-21, August.
- David A. Goldberg & Martin I. Reiman & Qiong Wang, 2021. "A Survey of Recent Progress in the Asymptotic Analysis of Inventory Systems," Production and Operations Management, Production and Operations Management Society, vol. 30(6), pages 1718-1750, June.
- Z S Hua & B Zhang & J Yang & D S Tan, 2007. "A new approach of forecasting intermittent demand for spare parts inventories in the process industries," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 52-61, January.
- Karl Inderfurth & Rainer Kleber, 2010. "An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production," FEMM Working Papers 100005, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- van Jaarsveld, Willem & Dekker, Rommert, 2011. "Spare parts stock control for redundant systems using reliability centered maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1576-1586.
- Syntetos, A.A. & Teunter, R.H. & Babai, M.Z. & Transchel, S., 2016. "On the benefits of delayed ordering," European Journal of Operational Research, Elsevier, vol. 248(3), pages 963-970.
- de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2006. "On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out," European Journal of Operational Research, Elsevier, vol. 174(1), pages 182-200, October.
- Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
- van Jaarsveld, W.L. & Dekker, R., 2010. "Integrating Reliability Centered Maintenance and Spare Parts Stock Control," Econometric Institute Research Papers EI 2010-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Godoy, David R. & Pascual, Rodrigo & Knights, Peter, 2013. "Critical spare parts ordering decisions using conditional reliability and stochastic lead time," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 199-206.
- Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
- Christopher A. Boone & Benjamin T. Hazen & Joseph B. Skipper & Robert E. Overstreet, 2018. "A framework for investigating optimization of service parts performance with big data," Annals of Operations Research, Springer, vol. 270(1), pages 65-74, November.
- Porras, Eric & Dekker, Rommert, 2008. "An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods," European Journal of Operational Research, Elsevier, vol. 184(1), pages 101-132, January.
- F R Johnston & E A Shale & S Kapoor & R True & A Sheth, 2011. "Breadth of range and depth of stock: forecasting and inventory management at Euro Car Parts Ltd," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 433-441, March.
- Neves-Moreira, Fábio & Veldman, Jasper & Teunter, Ruud H., 2021. "Service operation vessels for offshore wind farm maintenance: Optimal stock levels," Renewable and Sustainable Energy Reviews, Elsevier, vol. 146(C).
- Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
- Kleber, Rainer & Zanoni, Simone & Zavanella, Lucio, 2011. "On how buyback and remanufacturing strategies affect the profitability of spare parts supply chains," International Journal of Production Economics, Elsevier, vol. 133(1), pages 135-142, September.
- Araceli Zavala & David Nowicki & Jose Emmanuel Ramirez-Marquez, 2019. "Quantitative metrics to analyze supply chain resilience and associated costs," Journal of Risk and Reliability, , vol. 233(2), pages 186-199, April.
- Liu, Xinbao & Yang, Tianji & Pei, Jun & Liao, Haitao & Pohl, Edward A., 2019. "Replacement and inventory control for a multi-customer product service system with decreasing replacement costs," European Journal of Operational Research, Elsevier, vol. 273(2), pages 561-574.
- Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
- Toptal, Ayşegül, 2012. "Integration of shipment scheduling decisions for forward and reverse channels in a recoverable item system," International Journal of Production Economics, Elsevier, vol. 140(1), pages 129-137.
- Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
- Molenaers, An & Baets, Herman & Pintelon, Liliane & Waeyenbergh, Geert, 2012. "Criticality classification of spare parts: A case study," International Journal of Production Economics, Elsevier, vol. 140(2), pages 570-578.
- J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
- García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
- Demeter, Krisztina & Szász, Levente & Kő, Andrea, 2019. "A text mining based overview of inventory research in the ISIR special issues 1994–2016," International Journal of Production Economics, Elsevier, vol. 209(C), pages 134-146.
- H Wong & G J van Houtum & D Cattrysse & D Van Oudheusden, 2005. "Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(12), pages 1419-1430, December.
- Kumar, Sameer & Yang, Muer & Goldschmidt, Kyle H., 2018. "Will aging voting machines cause more voters to experience long waits?," International Journal of Production Economics, Elsevier, vol. 198(C), pages 1-10.
- Vaughan, Timothy S., 2005. "Failure replacement and preventive maintenance spare parts ordering policy," European Journal of Operational Research, Elsevier, vol. 161(1), pages 183-190, February.
- Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
- Jing-Sheng Song & Yue Zhang, 2020. "Stock or Print? Impact of 3-D Printing on Spare Parts Logistics," Management Science, INFORMS, vol. 66(9), pages 3860-3878, September.
- Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
- Tamás Bányai & Péter Veres, 2013. "Optimization Of Production Depth," Advanced Logistic systems, University of Miskolc, Department of Material Handling and Logistics, vol. 7(2), pages 85-94, December.
- Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
- D Nowicki & U D Kumar & H J Steudel & D Verma, 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(3), pages 342-352, March.
- Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
- Ba, Kader & Dellagi, Sofiene & Rezg, Nidhal & Erray, Walid, 2016. "Joint optimization of preventive maintenance and spare parts inventory for an optimal production plan with consideration of CO2 emission," Reliability Engineering and System Safety, Elsevier, vol. 149(C), pages 172-186.
- Kilpi, Jani & Töyli, Juuso & Vepsäläinen, Ari, 2009. "Cooperative strategies for the availability service of repairable aircraft components," International Journal of Production Economics, Elsevier, vol. 117(2), pages 360-370, February.
- Van Horenbeek, Adriaan & Buré, Jasmine & Cattrysse, Dirk & Pintelon, Liliane & Vansteenwegen, Pieter, 2013. "Joint maintenance and inventory optimization systems: A review," International Journal of Production Economics, Elsevier, vol. 143(2), pages 499-508.
- Lee, Loo Hay & Chew, Ek Peng & Teng, Suyan & Chen, Yankai, 2008. "Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem," European Journal of Operational Research, Elsevier, vol. 189(2), pages 476-491, September.