On the benefits of delayed ordering
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2015.08.003
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- L W G Strijbosch & R M J Heuts & E H M van der Schoot, 2000.
"A combined forecast—inventory control procedure for spare parts,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(10), pages 1184-1192, October.
- Heuts, R.M.J. & Strijbosch, L.W.G. & van der Schoot, E.H.M., 1999. "A Combined Forecast-Inventory Control Procedure for Spare Parts," Other publications TiSEM 333581ee-2340-4176-9933-d, Tilburg University, School of Economics and Management.
- Heuts, R.M.J. & Strijbosch, L.W.G. & van der Schoot, E.H.M., 1999. "A Combined Forecast-Inventory Control Procedure for Spare Parts," Research Memorandum 772, Tilburg University, School of Economics and Management.
- Antony Svoronos & Paul Zipkin, 1988. "Estimating the Performance of Multi-Level Inventory Systems," Operations Research, INFORMS, vol. 36(1), pages 57-72, February.
- Donald L. Iglehart, 1963. "Optimality of (s, S) Policies in the Infinite Horizon Dynamic Inventory Problem," Management Science, INFORMS, vol. 9(2), pages 259-267, January.
- Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio, 1999. "A simulation framework for forecasting uncertain lumpy demand," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 499-510, March.
- Berling, Peter & Marklund, Johan, 2013. "A model for heuristic coordination of real life distribution inventory systems with lumpy demand," European Journal of Operational Research, Elsevier, vol. 230(3), pages 515-526.
- Axsäter, Sven & Viswanathan, S., 2012. "On the value of customer information for an independent supplier in a continuous review inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 340-347.
- Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
- Porras, Eric & Dekker, Rommert, 2008. "An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods," European Journal of Operational Research, Elsevier, vol. 184(1), pages 101-132, January.
- J E Boylan & A A Syntetos & G C Karakostas, 2008. "Classification for forecasting and stock control: a case study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(4), pages 473-481, April.
- Kamran Moinzadeh & Hau L. Lee, 1986. "Batch Size and Stocking Levels in Multi-Echelon Repairable Systems," Management Science, INFORMS, vol. 32(12), pages 1567-1581, December.
- Schultz, Helle & Johansen, Soren Glud, 1999. "Can-order policies for coordinated inventory replenishment with Erlang distributed times between ordering," European Journal of Operational Research, Elsevier, vol. 113(1), pages 30-41, February.
- Carl R. Schultz, 1989. "Replenishment Delays for Expensive Slow-Moving Items," Management Science, INFORMS, vol. 35(12), pages 1454-1462, December.
- A A Syntetos & M Z Babai & Y Dallery & R Teunter, 2009. "Periodic control of intermittent demand items: theory and empirical analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(5), pages 611-618, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Olde Keizer, Minou C.A. & Teunter, Ruud H. & Veldman, Jasper, 2017. "Joint condition-based maintenance and inventory optimization for systems with multiple components," European Journal of Operational Research, Elsevier, vol. 257(1), pages 209-222.
- Babai, M. Zied & Dai, Yong & Li, Qinyun & Syntetos, Aris & Wang, Xun, 2022. "Forecasting of lead-time demand variance: Implications for safety stock calculations," European Journal of Operational Research, Elsevier, vol. 296(3), pages 846-861.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
- Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022.
"Forecasting: theory and practice,"
International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
- Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
- Bacchetti, A. & Plebani, F. & Saccani, N. & Syntetos, A.A., 2013. "Empirically-driven hierarchical classification of stock keeping units," International Journal of Production Economics, Elsevier, vol. 143(2), pages 263-274.
- Babai, Zied & Boylan, John E. & Kolassa, Stephan & Nikolopoulos, Konstantinos, 2016. "Supply chain forecasting: Theory, practice, their gap and the futureAuthor-Name: Syntetos, Aris A," European Journal of Operational Research, Elsevier, vol. 252(1), pages 1-26.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
- Pierre Dodin & Jingyi Xiao & Yossiri Adulyasak & Neda Etebari Alamdari & Lea Gauthier & Philippe Grangier & Paul Lemaitre & William L. Hamilton, 2023. "Bombardier Aftermarket Demand Forecast with Machine Learning," Interfaces, INFORMS, vol. 53(6), pages 425-445, November.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Pennings, Clint L.P. & van Dalen, Jan & van der Laan, Erwin A., 2017. "Exploiting elapsed time for managing intermittent demand for spare parts," European Journal of Operational Research, Elsevier, vol. 258(3), pages 958-969.
- Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
- Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
- Juha Lukkarinen & Jukka Majava, 2020. "Supplies Inventory Management in a Corporation Context: A Case Study," International Journal of Management, Knowledge and Learning, International School for Social and Business Studies, Celje, Slovenia, vol. 9(2), pages 169-184.
- Chen, Frank Y. & Feng, Youyi & Simchi-Levi, David, 2002. "Uniform distribution of inventory positions in two-echelon periodic review systems with batch-ordering policies and interdependent demands," European Journal of Operational Research, Elsevier, vol. 140(3), pages 648-654, August.
- Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
- Babai, M.Z. & Jemai, Z. & Dallery, Y., 2011. "Analysis of order-up-to-level inventory systems with compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 210(3), pages 552-558, May.
- K Nikolopoulos & A A Syntetos & J E Boylan & F Petropoulos & V Assimakopoulos, 2011. "An aggregate–disaggregate intermittent demand approach (ADIDA) to forecasting: an empirical proposition and analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 544-554, March.
- Moon, Seongmin & Hicks, Christian & Simpson, Andrew, 2012. "The development of a hierarchical forecasting method for predicting spare parts demand in the South Korean Navy—A case study," International Journal of Production Economics, Elsevier, vol. 140(2), pages 794-802.
- Axsater, Sven & Zhang, Wen-Fa, 1999. "A joint replenishment policy for multi-echelon inventory control," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 243-250, March.
- Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
- Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
More about this item
Keywords
Inventory control; Delayed ordering; Intermittent demand; (s; S) policy; Marginal cost analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:248:y:2016:i:3:p:963-970. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.